American Centrifuge Operating LLC Centrus Headquarters Facility Inspection Report 70-7004 2020-402 Public
ML20365A086
Person / Time
Site: 07007004
Issue date: 12/30/2020
From: Robert Williams
NRC/RGN-II
To: Wiehle K
American Centrifuge Operating
References
IR 2020402
Download: ML20365A086 (4)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION December 30, 2020 Ms. Kelly L. Wiehle Regulatory Manager American Centrifuge Operating, LLC Lead Cascade Facility and American Centrifuge Plant 3930 U.S. Route 23 South P. O. Box 628 Mail Stop 7560 Piketon, OH 45661

SUBJECT:

AMERICAN CENTRIFUGE OPERATING, LLC, CENTRUS HEADQUARTERS FACILITY, NUCLEAR REGULATORY COMMISSION INSPECTION REPORT NUMBER 70-7004/2020-402

Dear Ms. Wiehle:

The Nuclear Regulatory Commission (NRC) conducted an information security inspection of the CENTRUS Headquarters facility in Bethesda, Maryland on December 3, 2020. During this inspection, the NRC implemented alternative ways to complete the inspection program for your site in response to the public health emergency declared by the Secretary of Health and Human Services on January 31, 2020, and the National Emergency declared by the President of the United States on March 13, 2020, regarding the public health risks of the novel coronavirus (COVID-19) disease. On March 19, 2020, the NRC transitioned into a mandatory telework posture for all staff consistent with social distancing and travel recommendations issued to federal agencies. Consequently, the NRC Region II staff continues to evaluate how to best conduct inspections while balancing determinations of reasonable assurance of adequate protection and ensuring the health and safety of inspectors and the public at large.

The enclosed report presents the results of this inspection, which was conducted utilizing limited onsite inspectors and remote reviews. The inspectors reviewed activities authorized under the license in the area of Safeguards to determine whether they were conducted in accordance with NRC requirements. This inspection involved two NRC inspectors onsite while the rest of the inspection team worked remotely. The remote portions of the inspection consisted of reviewing procedures and representative records and conducting telephonic interviews with site personnel. At the conclusion of this inspection, the inspectors discussed the results with you and members of your staff at an exit meeting held on December 3, 2020.

Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s),

this transmittal document is decontrolled.

LIMITED INTERNAL DISTRIBUTION PERMITTED OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION K. Wiehle 2 Based on the results of this modified inspection, no violations of more than minor significance were identified.

The NRC will continue evaluating the guidelines and recommendations from federal and state authorities, along with the conditions of your facility, to determine when to resume onsite inspection activities. In the interim, the NRC plans to continue to conduct a combination of remote and onsite inspections as appropriate.

The NRC will also maintain frequent communications with your staff to discuss regulatory compliance matters and gather information to inform the decisions about future inspections.

The material enclosed herewith contains Security-Related Information associated with the Classified Information Security safeguards program at the CENTRUS Headquarters Facility, and in accordance with 10 CFR 2.390(d)(1), its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Should you have any questions concerning this inspection, please contact Leonard Pitts of my staff at 404-997-4708.

Sincerely,

/RA/

Robert E. Williams, Jr., Chief Projects Branch 1 Division of Fuel Facility Inspection Docket No. 70-7004 License No. SNM-2011

Enclosure:

NRC Inspection Report Number 70-7004/2020-402 w/

Attachment:

Supplemental Information OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION K. Wiehle 3 cc:

Kelly Wiehle Regulatory Manager ACO wiehlekl@centrusenergy.com Michael Whitehurst Facility Security Officer Centrus Head Quarters whitehurstm@centrusenergy.com SoLita Greene Director, Department of Energy NE-32/D-430 solita.greene@nuclear.energy.gov OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION