January 25, 2024 ACO 24-0016

ATTN: Document Control Desk Mirela Gavrilas, Director Office of Nuclear Security and Incident Response Division of Security Operations U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

American Centrifuge Plant; Docket Number 70-7004; License Number SNM-2011

Request for Extension of Interim Authority To Operate (IATO) for the Distributed Control System (DCS) and Process Telecommunication System (PTS) at the American Centrifuge Plant in Piketon, Ohio

Dear Mirela Gavrilas:

The purpose of this letter is to request an additional 1-year extension of the IATO for the DCS and PTS for the American Centrifuge Plant in Piketon, Ohio. This system is currently operating under a U.S. Nuclear Regulatory Commission (NRC) authorized IATO that is valid throqgh March 31, 2024 (Reference 1 ), as conditioned.

This extension would allow for continued operations during NRC's assessment and final issuance of an ongoing Authority To Operate the system in Piketon, Ohio.

If you have any questions regarding this matter, please contact me at (740) 897-3859.

Sincerely,

~;f~

Kelly L. Fitch Regulatory Manager

3930 U.S. Route 23 South - P.O. Box 628 American Centrifuge Operating, LLC

Piketon, OH 45661 I

Mirela Gavrilas January 25, 2024 ACO 24-0016, Page 2

Reference:

1. NRC letter from M. Gavrilas to S. Soto Lugo, regarding Authorization For Interim Authority To Operate Extension For American Centrifuge Operating, LLC Classified Systems, dated March 29, 2023

cc:

S. Bazian, NRC HQ C. Blanton, DOE Idaho Y. Paraz, NRC HQ A. Ford, DOE Idaho J. Hutson, Contractor J. Lingard, DOE Idaho M. Mangefrida, NRC HQ G. Nalabandian, NRC HQ D. Nelson, NRC HQ L. Pitts, NRC Region II M. Reim, DOE-NE R. Ruppert, NRC HQ J. Tobin, NRC HQ D. Woodyatt, NRC HQ