ML23257A037

From kanterella
Jump to navigation Jump to search
American Centrifuge Operating, LLC - Inspection Schedule for Calendar Year 2024
ML23257A037
Person / Time
Site: 07007004
Issue date: 09/15/2023
From: Mathis R
NRC/RGN-II/DFFI
To: Karen Fitch
American Centrifuge Operating
References
Download: ML23257A037 (1)


Text

Kelly L. Fitch Regulatory Manager American Centrifuge Operating, LLC 3930 U.S. Route 23 South P. O. Box 628 Mail Stop 7560 Piketon, OH 45661

SUBJECT:

AMERICAN CENTRIFUGE OPERATING, LLC - INSPECTION SCHEDULE FOR CALENDAR YEAR 2024

Dear Ms. Fitch:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the CENTRUS facilities in calendar year 2024. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or reactive inspections are not included in the schedule.

If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Leonard Pitts at (404) 997-4708 with any questions or concerns you may have regarding this letter or the inspection schedule.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Robert Mathis, III, Chief (Acting)

Projects Branch 1 Division of Fuel Facility Inspection Docket No. 07007004 License No. SNM-2011

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV September 14, 2023 Signed by Mathis, Robert on 09/14/23

ML23257A037 X

SUNSI Review X

Non-Sensitive

Sensitive X

Publicly Available

Non-Publicly Available OFFICE RII/DFFI RII/DFFI NAME L. Pitts T. Vukovinsky R. Mathis DATE 09/14/23 09/14/23 09/14/23

Enclosure 2024 U.S. NUCLEAR REGULATORY COMMISSION INSPECTION/ACTIVITY PLAN FOR CENTRUS CENTRUS Headquarters Dates Number of Inspectors Description/Inspection Procedures (IPs)

January 25 2

IP 81815, Access Authorization IP 81820, Information Security CENTRUS - American Centrifuge Plant Dates Number of Inspector s

Description/Inspection Procedures (IPs)

March 25 - 29 1

Nuclear Criticality Safety 1 (IP 88015)

Fire Protection (IP 88055)

May 6 - 10 1

Operational Safety (IP 88020)

July 15 - 19 1

Material Control and Accountability (Various IPs)

August 19-23 2

IP 81815, Access Authorization IP 81820, Information Security September 30 - October 4 2

Plant Modifications - Annual (IP 88070)

Environmental Protection (IP 88045)

TBD 1

Physical Security (Various IPs)

CENTRUS - Technology and Manufacturing Center Dates Number of Inspectors Description/Inspection Procedures (IPs)

November 11 - 13 3

IP 81815, Access Authorization IP 81820, Information Security