Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project
ML24121A183
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/30/2024
From: David Helker
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML24121A182 List:
References
Download: ML24121A183 (1)


Text

PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 contains Proprietary Information; upon separation this document is decontrolled.

200ExelonWay KennettSquare,PA19348 www.ConstellationEnergy.com

April 30, 2024

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

Subject:

Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project

Constellation Energy Generation, LLC (CEG) has scheduled a pre- submittal meeting with the U.S.

Nuclear Regulatory Commission (NRC) on May 14, 2024, to discuss a proposed licensing initiative for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, f or supporting the Emergency Core Cooling System (ECCS) Compensated Level Replacement Projec t. This pre-submittal meeting will include both open and closed sessions. The open p ortion of the meeting will allow for public participation; however, during the closed portion of the meeting proprietary information will be presented and access will be limited. In support of this me eting, CEG is submitting both proprietary and non-proprietary versions of the pre-submittal m eeting presentation material.

Accordingly, Attachment 1 (Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material) contains information proprietar y to Curtiss-Wright Corporation (Curtiss-Wright) and Curtiss-Wright requests that this document be withheld from public disclosure in accordance with 10 CFR 2.390(a)(4). An affidavit supporting this request is contained in . Attachment 3 contains a non-proprietary version of the pre-submittal meeting presentation material in which Curtiss-Wright proprietary infor mation has been redacted.

Information that has been redacted is reflected by use of doubl e brackets ((( ))).

Should you have any questions concerning this submittal, please contact Richard Gropp at 1-267-533-5642 or e-mail at Richard.Gropp@constellation.com .

Respectfully,

David P. Helker Sr. Manager, Licensing Constellation Energy Generation, LLC

PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 contains Proprietary Information; upon separation this document is decontrolled.

U.S. Nuclear Regulatory Commission Pre-Submittal Meeting Presentation Material Docket Nos. 50-277 and 50-278 April 30, 2024 Page 2

Attachments: 1. Peach Bottom ECCS Compensated Level System Repl acement Project Presentation Material (Proprietary Information)

2. Vendor (Curtiss-Wright) Affidavit
3. Peach Bottom ECCS Compensated Level System Replacement Proje ct Presentation Material (Non-Proprietary Information)

cc: w/ Attachments 2 and 3 only Regional Administrator - NRC Region I NRC Senior Resident Inspector - PBAPS NRC Project Manager, NRR - PBAPS Director, Bureau of Radiation Protection - Pennsylvania Depart ment of Environmental Resources Division Chief of Nuclear Safety, Bureau of Radiation Protectio n - Pennsylvania Department of Environmental Resources S.Seaman,StateofMaryland