Similar Documents at Salem |
---|
Category:Inspection Report
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 IR 05000272/20244032024-09-25025 September 2024 And Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 IR 05000272/20230112023-03-0707 March 2023 Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) IR 05000272/20220042023-01-31031 January 2023 Integrated Inspection Report 05000272/2022004 and 05000311/2022004 IR 05000272/20220112023-01-0606 January 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000272/2022011 and 05000311/2022011 IR 05000272/20220032022-11-0909 November 2022 Integrated Inspection Report 05000272/2022003 and 05000311/2022003 IR 05000272/20224022022-10-14014 October 2022 Cyber Security Report 05000272/2022402 and 05000311/2022402 - Cover Letter Only IR 05000272/20220052022-08-31031 August 2022 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022005 and 05000311/2022005) IR 05000272/20220022022-08-0808 August 2022 Integrated Inspection Report 05000272/2022002 and 05000311/2022002 IR 05000272/20224012022-07-21021 July 2022 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2022401, 05000272/2022401, and 05000311/2022401 (Cover Letter Only) IR 05000272/20225012022-06-14014 June 2022 and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2022501, 05000272/2022501, and 05000311/2022501 IR 05000272/20220012022-05-0404 May 2022 Integrated Inspection Report 05000272/2022001 and 05000311/2022001 IR 05000272/20223012022-04-27027 April 2022 Initial Operator Licensing Examination Report 05000272/2022301 and 05000311/2022301 IR 05000272/20210132022-03-10010 March 2022 Evaluation of Changes, Tests, and Experiments Baseline IR 05000354/2021013, 05000272/2021013 and 05000311/2021013 & ISFSI IR 07200048/2021001 Related to PSEG Evals of Stations & Planned Wind Port Manufacturing Facility IR 05000272/20210062022-03-0202 March 2022 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2021006 and 05000311/2021006) IR 05000272/20210042022-02-10010 February 2022 Integrated Inspection Report 05000272/2021004 and 05000311/2021004 IR 05000272/20215012021-11-30030 November 2021 and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2021501, 05000272/2021501 and 05000311/2021501 IR 05000272/20214022021-11-19019 November 2021 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2021402, 05000272/2021402 and 05000311/2021402 IR 05000272/20210032021-11-0202 November 2021 Integrated Inspection Report 05000272/2021003 and 05000311/2021003 IR 05000272/20214032021-10-28028 October 2021 and Salem Nuclear Generating Station, Units 1 and 2 - Biennial Problem Identification and Resolution Inspection Report (Security-Related Information) 05000354/2021403, 05000272/2021403 and 05000311/2021403 (Cover Letter Only IR 05000272/20210122021-10-28028 October 2021 and Salem Nuclear Generating Station, Units 1 and 2 - Biennial Problem Identification and Resolution Inspection Report 05000354/2021012, 05000272/2021012 and 05000311/2021012 IR 05000272/20210112021-09-30030 September 2021 Temporary Instruction 2515/194 Inspection Report 05000272/2021011 and 05000311/2021011 IR 05000272/20210052021-09-0101 September 2021 Updated Inspection Plan for the Salem Nuclear Generating Station (Report 05000272/2021005 and 05000311/2021005) IR 05000272/20210022021-08-18018 August 2021 Reissued Integrated Inspection Report 05000272/2021002 and 05000311/2021002 ML21222A1402021-08-11011 August 2021 Integrated Inspection Report 05000272/2021002 and 05000311/2021002 IR 05000272/20210012021-05-0505 May 2021 Integrated Inspection Report 05000272/2021001 and 05000311/2021001 IR 05000272/20210102021-03-0909 March 2021 Triennial Fire Protection Inspection Report 05000272/2021010 and 05000311/2021010 IR 05000272/20200062021-03-0303 March 2021 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2020006 and 05000311/2020006) IR 05000272/20214012021-02-23023 February 2021 and Salem Nuclear Generating Station, Units 1 and 2: Security Baseline Inspection Report 05000354/2021401, 05000272/2021401 and 05000311/2021401 (Letter Only) IR 05000272/20200042021-02-0909 February 2021 Generating Station, Units 1 and 2: Integrated Inspection Report 05000272/2020004 and 05000311/2020004 2024-09-25
[Table view] Category:Letter
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) IR 05000272/20244032024-09-25025 September 2024 And Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location 2024-09-25
[Table view] |
Inspection Report - Salem - 2024001 |
---|
|
|
Text
May 7, 2024
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 - INTEGRATED INSPECTION REPORT 05000272/2024001 AND 05000311/2024001
Dear Charles McFeaters:
On March 31, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Salem Nuclear Generating Station, Units 1 and 2. On April 25, 2024, the NRC inspectors discussed the results of this inspection with Richard DeSanctis, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading- rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Brice A. Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety
Docket Nos. 05000272 and 05000311 License Nos. DPR- 70 and DPR-75
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000272 and 05000311
License Numbers: DPR- 70 and DPR-75
Report Numbers: 05000272/2024001 and 05000311/2024001
Enterprise Identifier: I-2024-001- 0039
Licensee: PSEG Nuclear, LLC
Facility: Salem Nuclear Generating Station, Units 1 and 2
Location: Hancocks Bridge, NJ
Inspection Dates: January 1, 2024 to March 31, 2024
Inspectors: L. Grimes, Senior Resident Inspector E. Garcia, Resident Inspector
Approved By: Brice A. Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety
Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Salem Nuclear Generating Station, Units and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 operated at or near rated thermal power for the entire inspection period.
Unit 2 began the inspection period at rated thermal power. On February 21, 2024, the unit was down powered to approximately 60 percent to perform turbine valve testing, 22 steam generator feedwater pump repairs, and 21 turbine governor valve repairs. On February 21, 2024, the unit returned to rated thermal power and remained at or near rated thermal power for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp- manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on -site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 1, main steam and turbine drain due to steam leak upstream of 11A drain manifold, January 31, 2024 (Notification (NOTF) 20955615)
- (2) Unit 1, main steam system, March 6, 2024
- (3) Unit 1, 11 auxiliary feedwater system, March 14, 2024
- (4) Unit 2, chilled water system due to lowering chilled water expansion tank level, March 28, 2024
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Unit 2, 100' elevation auxiliary building, inner penetration area, FP-SA-2556, January 17, 2024
- (2) Unit 2, 100' elevation auxiliary building, relay and battery room, FP-SA-2551, February 23, 2024
- (3) Unit 1, 100' elevation auxiliary building, 1A emergency diesel generator (EDG) area, FP-SA-1555, February 26, 2024
- (4) Unit 2, 100' elevation auxiliary building, inner piping penetration area and chiller rooms, FP-SA- 2556, March 28, 2024
71111.06 - Flood Protection Measures
Flooding Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated internal flooding mitigation protections in the Units 1 and 2 EDG rooms.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed licensed operator performance in the main control room during Unit 1 downpower and activities to address degraded 22 steam generator feedwater pump and 21 turbine governor valve on February 21, 2024.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated a Unit 2 simulator scenario that included a failed nuclear instrument, dropped control rod, main power transformer open phase condition requiring a reactor trip, and a stuck open pressurizer power-operated relief valve on January 30, 2024.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (2 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) Units 1 and 2, mitigating system performance indicator auxiliary feedwater pump, March 12, 2024
- (2) Unit 1, 11 service water pump after pump strainer differential pressure high and not rotating, March 20, 2024 (NOTF 20959960)
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) Unit 1, emergent work on 13 chiller due to trip on low compressor oil level, January 4, 2024 (NOTF 20954860)
- (2) Unit 1, emergent work on 11 and 13 chiller due to 11 chiller trip on low differential pressure and 13 chiller already inoperable, January 26, 2024 (NOTFs 20955583 and
===20955114/WO 60159548)
- (3) Unit 2, elevated risk during scheduled repair to 21 turbine governor valve, 21MS29, while at 60 percent power, February 21, 2024 (NOTF 20939146 and WO 60157677)
- (4) Unit 2, elevated risk during scheduled repair to 22 steam generator feedwater pump
- 1 control oil power unit pump while at 60 percent power, February 21, 2024 (NOTF 20953015 and WO 60159360)
- (5) Unit 1, elevated risk during scheduled activity on 1A EDG where technical specification allowed outage time extended from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 14 days due to crediting allowed outage time diesel generators, during week of February 26 - March 2, 2024 (WO 30371216)
Operability Determination or Functionality Assessment (IP Section 03.01)===
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Unit 1, 1C EDG due to review of procedural direction to reduce load prior to performance of hot restart surveillance, January 16, 2024
- (2) Unit 1, chilled water system due to work windows for 12 chilled water pump, 11 chiller out of service, and 13 chiller degraded, February 7, 2024 (NOTFs 20955583 and
===20954860)
- (3) Unit 1, first time use of allowed outage time diesel generators to extend the technical specification action statement due to the 1A EDG online maintenance overhaul, February 26, 2024
- (4) Unit 1, 11 charging pump due to indications of degraded service water cooling to lube oil heat exchanger, March 1, 2024 (NOTF 20956598)
- (5) Unit 1, 12 service water pump due to failed inservice test on low pump differential pressure, March 21, 2024
71111.24 - Testing and Maintenance of Equipment Important to Risk
The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:
Post-Maintenance Testing (PMT) (IP Section 03.01)===
- (1) Unit 2, 22 safety injection pump following failed relay replacement and breaker swap, February 15, 2024
- (2) Unit 1, 11 charging pump following 4kV breaker replacement/swap, February 23, 2024 (WO 30329527)
- (3) Unit 1, 11 charging pump after planned maintenance, March 28, 2024 (WO
30380539) Surveillance Testing (IP Section 03.01)
- (1) Unit 1, S1.OP-ST.DG-0021, "1C Diesel Generator Hot Restart Test,"
January 16, 2023 (WO 50235459)
- (2) Unit 2, S2.OP-PT.TRB-0003, "Main Turbine Valve Stroke Testing," February 21, 2024 (WO 30381432)
- (3) Unit 1, S1.OP-ST.AF-0003, "13 Auxiliary Feedwater Pump In-service Testing,"
March 19, 2024 (WO 50247937)
Inservice Testing (IST) (IP Section 03.01) (1 Sample)
- (1) Unit 1, S1.OP-ST.DG-0005(Q), "12 Fuel Oil Transfer System Operability Test," January 12, 2024 (WO 50246185)
71114.06 - Drill Evaluation
- (1) The inspectors observed and evaluated the adequacy and capability of the licensees assessment of performance during a hostile action-based emergency preparedness drill on March 26,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===
- (1) Unit 1, January 1, 2023 through December 31, 2023
- (2) Unit 2, January 1, 2023 through December 31, 2023
BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (2 Samples)
- (1) Unit 1, January 1, 2023 through December 31, 2023
- (2) Unit 2, January 1, 2023 through December 31, 2023
BI02: RCS Leak Rate Sample (IP Section 02.11) (2 Samples)
- (1) Unit 1, January 1, 2023 through December 31, 2023
- (2) Unit 2, January 1, 2023 through December 31,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On April 25, 2024, the inspectors presented the integrated inspection results to Richard DeSanctis, Plant Manager, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.04 Drawings 205203, Sheet 3 No. 1 Unit Main, Reheat and Turbine By-pass Steam 73
205204, Sheet 1 No. 1 Unit Turbine Drains 37
71111.05 Corrective Action 2095 Salem Pre-Fire Plan for Unit 2 Diesel Generator Area (FP- 02/28/2024
Documents SA- 2555) Incorrectly States That There are Floor Drains
Resulting from Used to Discharge Water Out of Area
Inspection 20957959 Salem Pre-Fire Plan for Unit 1 Diesel Generator Area (FP- 02/28/2024
SA- 1555) Incorrectly States That There are Floor Drains and
a Sump That are Used to Discharge Water Out of Area
2097485 Fire Department Notes for Continuous Firewatch Were 02/26/2024
Incorrect
Fire Plans FP-SA-2556 Salem Pre-Fire Plan, U/2 Inner Piping Penetration Area & 0
Chiller, Room EI 100'
Procedures FP-SA-003 Actions for Inoperable Fire Protection - Salem Station 7
71111.06 Miscellaneous Notifications:
20325499,
20390805,
20502815,
20939968
OP.SA-102-106- Master List of Timed Actions 7
F1
S-C-ZZ-SDC- Moderate Energy Line Break Analysis 3
203
S1.OP-AB.ZZ- Flooding 4
000s
S2.OP-SO.DG- 2C Diesel Generator Sump 1
0004
SA-PRA-012 Salem Generating Station Probabilistic Risk Assessment 6
Internal Flood Evaluation Summary Notebook
SA-PRA-012A Salem Generating Station Probabilistic Risk Analysis Internal 0
Flood Walkdown Notebook
SI.OP.AB.SW- Loss of Service Water Header Pressure 18
0001
Inspection Type Designation Description or Title Revision or
Procedure Date
Work Orders 70070053,
70136049,
230176,
60080099
71111.12 Corrective Action 20777337 Internal Damage to the Inner Bonnet of the 1AF175 Valve 10/20/2017
Documents
Corrective Action 20956219 Struthers Dunn Relays for 21, 22, and 23 Charging Pumps 02/13/2024
Documents Installed Beyond 16- year Replacement Preventive
Resulting from Maintenance
Inspection
Drawings 205236, Sheet 2 No. 1 and 2 Units Spare Auxiliary Feed Pump 4
Engineering 70211323 Non-Safety-Related 4th AFW Pump MRule Maintenance 01/22/2020
Evaluations Strategy After Identification it was Not Being Tested in
Accordance with Maintenance Rule
80130005-0100 De-activation of 2$ Full Flow Test and Existing WOs 07/05/2022
30346154 and 30346155 for Non- Safety-Related 4th AFW
Pump
Miscellaneous Maintenance Plan 3M Performance of PM to Perform MSPI 4th AFW Pump
366333 Recirculation Flow Test (Recirculation to/from Demineralized
Water Storage Tank)
Maintenance 8Y Performance of PM to Lube and Inspect 1/2AF174 Valves
Plans 368296 and (MSPI AFW Pump Discharge Manual Globe Valve)
368297
Maintenance 8Y Performance of PM to Lube and Inspection 11-14 and 21-
Plans 368298, 24AF175 Valves (MSPI AFW Pump Discharge to Each S/G)
366326, 366327,
366328, 366329,
366330, 366331,
and 366332
Procedures ER-AA-310 Implementation of Maintenance Rule 16
SC-MRULE-001 Salem Maintenance Rule Risk Ranking 6
SC.OP-PT.AF- Testing the MSPI Pump and Diesel 1
0001
SC.OP-SO.AF- Feed Steam Generators with MSPI AFW Pump 2
Inspection Type Designation Description or Title Revision or
Procedure Date
0001
71111.13 Procedures OP-SA-108-116 Operability Assessment and Equipment Control Program 2
71111.15 Corrective Action 20927785 Excessive Corrosion on Fitting and Tubing Downstream of 02/22/2023
Documents 1SW186 Valve that Provides Indications for SW Inlet
Pressure to Lube Oil Heat Exchanger
Miscellaneous 80131437 - 0100 Tech Evaluation
80134667 - 0200 Tech Evaluation
DCP 80134926
License Emergency Diesel Generator Hot Restart Test Salem 04/12/1994
Amendment Generating Station Unit Nos. 1 and 2
Request NLR-
N94008, LCR 94-
NRC Generic Proposed Staff Actions to Improve and Maintain Diesel
Letter 84-15 Generator Reliability
NRC Information Recent Engine Failures of Emergency Diesel Generators
Notice 85-32
NRC Regulatory Election, Design, and Qualification of Diesel Generator Units 2
Guide 1.9 Used as Standby (Onsite) Electric Power Systems at Nuclear
Power Plants
Operation and Diesel Engine-Generator Sets (ALCO)
Maintenance
Manual 433266
Procedures OP-SA-108-116 Operability Assessment and Equipment Control Program 5
S1.OP-ST.CVC- Inservice Testing - 11 Charging Pump 27
0003
Work Orders 30371216
244970, Performance of 3-month 11 Charging Pump Inservice
244313, and Testing
242574
60159516 and Troubleshooting 13 Chiller Due to Trip on Low Compressor 01/26/2024
60159548 Oil Level on 01/04/2024 and Replace Time-delay Relay by
Cannibalizing 11 Chiller's Time-delay Relay
230854
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.24 Procedures S1.OP-SO.CVC- Charging Pump Operating 45
0002
S2.OP-PT.TRB- Main Turbine Valve Stroke Time Testing 22
0003
Work Orders 30381432
11