Summary of 820407 Meeting W/Util in Bethesda,Md Re Human Factors Review of Control Room & Plans for Responding to NUREG-0700.Viewgraphs Encl
ML20054E784
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/27/1982
From: Burwell S
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20054E785 List:
References
RTR-NUREG-0700, RTR-NUREG-700 NUDOCS 8206140232
Download: ML20054E784 (4)


Text

I MAY 2 71982 Docket Hos.: 50-445 and 50-446 APPLICANT: Texas Utilities Generating Company FACILITY: Corenche Peak Steam Electric Station, Units 1 and 2

SUBJECT:

SUMMARY

OF !EETING ON HUMAN FACTOR REVIEW OF THE COMANCHE PEAK CONTROL R00H Summary A meeting was held at NRC Headquarters, 7920 Norfolk Avenue, Bethesda, Maryland on Wednesday, April 7,1982. The purpose of the meeting was to discuss the applicant's human factors review of the control room and plans for responding to NUREG-0700.

The applicant advised that he has elected to do the long-tem control room hucen factors review for confornance to NUREG-0700. The long-tem review has been cmpleted with minor exceptions. The applicant is presently modifying the control panels to reflect the results of the review and expects to complete this prior to fuel loading. The plan for submitting the final report and the schedule for staf f review were discussed.

Ihe meeting attendance is given in Enclosure 1.

Meetinq Minutes The applicant's human factors engineering (HFE) team leader, Mr. Ron Estes, described the status of the UFE control room review for Comanche Peak using three slides, Enclosure 2. The applicant elected to do the long-term HFE review for conformance to NUREG-0700 prior to fuel loading. The najor mile-stones in the life control room review are listed on Sheet 2 of Enclosure 2.

The NUREG-0700 review has been completed with minor exceptions as noted on Sheet 3 of Enclosure 2. The review identified about 350 human engineering deficiencies (HEDs) and all are being resolved by the task team. The applicant is raking modifications to the control boards and expects to complete these prior to fuel loading. Over 800 control modifications are planned to enhance the Comanche Peak control room.

The schedule for submitting the final report was discussed. The applicant projects that a partial final report (with a few open sections) could be stiimi tted for staff review by early f all. The open sections would be 8206140232 820527 DR ADOCK 05000445 PDR omce> . . . . . . . . . . .. . . . . . . . . . . . . . . ................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

suaurue) . . . . . . . . . . . . . . . . . . . ....................... ..................... .................... ......................

om) . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .....................

Nac ronu m oo-eci nacu oua OFFICIAL RECORD COPY usceo.iwi- m ua

Texas Utilities Generating Compaqy 2 7 G32 submitted as they are completed with the last sections being submitted prior to 120 days before fuel loading, i.e. about the end of the year. The appli-cant's objective is to have the staff complete its review and accept the final report prior to fuel loading.

The staff requested that the early submittal of the final report include, as required in NUREG-0700,1) a program plan describing the organization and program history of the review, and 2) a systens analysis to demonstrate that the control needs of the operator arc satisfied.

The staff was receptive to the applicant's plan and schedule for submitting the HFE final repert. The staff noted that Comanche Peak will likely be the first station to be reviewed for conformance to NUREG-0700. The staff also commented that if the applicant review and design modifications are complete, the staff could write off on its design review prior to fuel loading. Should the staf f determine that additional modifications are required, we would expect that commitments to make these modifications at the first ref tmling outage, for example, would resolve the matter.

The staff experiences in conducting HFE control room reviews were discussed.

The staff cautioned that consistent labeling should be used on the control board, in the procedures and on the computer, and preferably on the drawings.

The HFE review of the annunciator panels and the need to have a capability for testing lights was discussed.

Original signed by:

Spottssood Stirnll S. B. Burwell, Project Manager Licensing Branch No.1 Division of Licensing Encl osures:

1. Attendance List
2. Control Room Design Review at CPSES cc w/encls.: See next page

/\I o ,,,c e ,  %:.)ja f.pt .. ,,,,, , , , , , , , , , , , , , . , , , , , , , , , , , , , , , , , , , , , , , , . , , , , , , , , , . , . . . . . . . . .

SBu Ne 1/.1g B ooc * . . . . . . . * * . . . * * = .

SURNAME > . . . . . . . . ....y. ........ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * . . . . . . . . . .

sue > ...................... .... ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Nac ronu sia (10-80) nacu oua OFFlCIAL RECORD COPY usoeo: mi-m*o

Mr. R. J. Gary

Executive Vice President and General Manager Texas Utilities Generating Company 2001 Bryan Tower Dallas, Texas 75201 cc
Nicholas S. Reynolds, Esq. Mr. Robert G. Taylor Debevoise & Liberman Resident Inspector / Comanche Peak 1200 Seventeenth Street, N. W. Nuc. lear Power Station Washington, D. C. 20036 c/o U. S. Nuclear Regulatory Commission Spencer C. Relyea, Esq. P. O. Box 38 Worsham, Forsythe & Sampels Glen Rose, Texas 76043 2001 Bryan Tower Dallas, Texas 75201  !!r. John'T. Collins U. S. NRC, Region IV Mr. Homer C. Schmidt 611 Ryan Plaza Drive Manager - Nuclear Services Suite 1000 Texas Utilities Services, Inc. Arlington, Texas 76011 2001 Bryan Tower Dallas, Texas 75201 Mr. H. R. Rock Gibbs and Hill, Inc.

393 Seventh Avenue New York, New York 10001

=

Mr. A. T. Parker Westinghouse Electric Corporation P. O. Box 355 Pittsburgh, Pennsylvania 15230 David J. Preister Assistant Attorney General Environmental Protection Division P. O. Box 12548, Capitol Station Austin, Texas 78711 Mrs. Juanita Ellis, President.

Citizens Association for Sound Energy 1426 South. Polk Dallas, Texas 75224 b r

ENCLOSURE 1 4

MEETING ATTENDANCE HUMAN FACTOR REVIEW 0F COMANCHE PEAK CONTROL ROOM April 7, 1982 NRC Staff TUGC0/TUSI Spottswood Burwell Ron Estes Dennis Serig Don Woodlan Dom Tondi Steve Hunt Leo Beltracchi Homer Schmidt George Lipinski Dale Walling Joel Kramer Bobby Bird Voss Moore Ray Ramirez Applicant Contractors Observers D. J. Castro, Gibbs & Hill Ken Mallory, Essex John Riesland, D&JE Allen Elliff, Essex

. Lafar Wechsler, Bechtel i

I 4

- . - - . - - -