ML20054H644

From kanterella
Revision as of 09:15, 14 November 2023 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
to Software Changes to Process Computer
ML20054H644
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/08/1979
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20054H623 List:
References
ENP-11, NUDOCS 8206240290
Download: ML20054H644 (5)


Text

-

9 CAROLINA POWER & LIGHT COMPANY BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 & 2

. ENP-ll ,

SOF'IWARE CHANGES TO THE PROCESS COMPUTER -

Revision No.

3 0 Reco::: mended By: .w ,M Date: ["[~7f Engineering Supervisor V Approved By: Th Date:

/ '7 9 P Manager / //

'A

.g ,

e e

B206240290 820621 PDR ADOCK 05000324 P PDR e ,_. _ . _ - _ _ _ _ _ . _ _

ENP-11 LIST 0F EFFECTIVE PAGES PAGES REV. NO.

1-2 0 I

l r 'A. ,

BSEP/ENP-ll , . Rev. 0 P 1

o .

ATTACHMENT 3 SOFTWARE CHANGES TO THE PROCESS COMPUTER (ENP-11)

PURPOSE: Documents software changes to the process computer (e.g. changing the CPR limits).

l l

l

. , , T. '

1.0 -SCOPE This procedure providen for the review of proposed process computer software changes that could affect nuclear calculations.

2.0 CENERAL Although many sof tware changes affect only balance of plant or computer functioning, some NSSS sof tware changes are made cach

  • cyc]c. This procedure specifies that the Process Computer Engineer ,

and the Project Enginecr-Reactor review computer sof tware changes to determine if the change affects nuclear calculations. If nuc1 car calculations are affected, the software change *is further reviewed

~

by PNSC. <

3.0 PROCEDURE FOR CHANCES TO THE PROCESS COMPUTER

1. Changes.to the, process com*puter will be reviewed by the Plant Computer Engineer and the Project Enginecr-Reactor and this review documented on the " Patch Record Form."
2. As a result of these reviews, a determination will be made whether PNSC review is required.. PNSC review is required if either the Computer Engineer or the Project Enginecr-Reactor determine that the change affects the NSS calculations.
3. The Project Engineer-Reactor is responsible to ensure changes to the process computer which require PNSC review are reviewed by the PNSC. The Computer Engineer is responsible to the Project Reactor Engineer for the administration of the " Patch Record Form."

Y. The " Patch Reco'dr Forms" will be maintained by the Computer Engineer.

s.g ,

BSEP/ENP-ll 1 , Rev. 0 f

I .

.' Rev. P:gn of

.t S.W. Version Sheet cf

}

Volume Unit PROCESS COMPUTER (PC) .

PATCII RECORD FOMI .

~

TO PROCPJdi: .

_ Change No. Change Approval PNSC Review required: Yes/No PC Eng./Date NE Proj. Eng./Date PNSC/Date

. Plant Mananer/ Date Address Octal or Pal Content - '

Date

' " New mar s M Absolutc~ Relative Old IN OUT I -

l .

l

.. y, l: . ..

l BSEP/ dip-ll . 2 Rev. 0 1'

l l