ML20056D126

From kanterella
Revision as of 07:58, 13 November 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-348/93-15 & 50-364/93-15 on 930628- 0702 & 0712-13.No Violations or Deviations Noted
ML20056D126
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/29/1993
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20056D127 List:
References
NUDOCS 9308050018
Download: ML20056D126 (3)


See also: IR 05000348/1993015

Text

.

i

.f

JUL 2 91993

.

Docket Nos. 50-348, 50-364

License Nos. NPF-2, NPF-8

Southern Nuclear Operating Company, Inc.

ATTN: Mr. W. G. Hairston, III

Executive Vice President

Nuclear Operations

P. O. Box 1295

'

Birmingham, AL 35201

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/93-15 AND 50-364/93-15

This refers to the inspection conducted by M. D. Hunt of this office on '

June 28 through July 2,1993 and July 12 and 13,1993. The inspection

included a review of activities authorized for your Farley facility. At the 4

conclusion of the inspection, the findings were discussed with those members ,

of your staff identified in the report.

.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, violations or deviations were not identi-

fied.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosure will be placed in the NRC Public Document Room.  ;

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original signed by

M. B. Shymlock/for

Caudie A. Julian, Chief i

Engineering Branch l

. Division of Reactor Safety

Enclosure:

NRC Inspection Report

(cc w/enci - See page 2)

9308050018 930729 .

I

PDR ADOCK 05000348

G PDR I .

i

l

1c~o l 2

.

\

Southern Nuclear Operating 2 en p a reg

Company, Inc.

cc w/ encl:

B. L. Moore

Manager, Licensing

Southern Nuclear Operating ,

Company, Inc.

P. O. Box 1295

Birmingham, AL 35201-1295

R. D. Hill, Jr.

General Manager, Farley Plant

Southern Nuclear Operating

Company, Inc.

P. O. Box 470

Ashford, AL 36312

W. R. Bayne, Supervisor

Safety Audit and Engineering Review

Farley Nuclear Plant

P. O. Box 470

Ashford, AL 36312

State Health Officer

Alabama Department of Public Health

434 Monroe Street i

Montgomery, AL 36130-1701

James H. Miller, III, Esq.

Balch and Bingham

P. O. Box 306

1710 Sixth Avenue North

Birmingham, AL 35201

Chairman

Houston County Commission

P. O. Box 6406

Dothan, AL 36302

(bec w/ encl - See page 3)

.

.

, , .. ,

Southern Nuclear Operating 3 'pp 7 _'

' 'a

' 'n39

Company, Inc.

,

t

bec w/ enc 1: I

Timothy A. Reed, NRR *

F. Cantrell, RII

G. Hallstrom, RII i

J. Jaudon, RII i

Document Control Desk

-;

NRC Resident Inspector -

U.S. Nuclear Regulatory Commission  !

Route 2, Box 24 _

Columbia, AL 36319 '

!

i

i

a

,

,

!

!

,

,

-

5

-

,

!

,

i

File Nare S:\DRS\EB\FAR93-15.MDH *

RI.fR5

/'

RII:D / RI :D S RII:DRP  ;

'

l if

f6/y9

i

/

,

'

e

' h4 r FCan rell

y '

-

'

93 07/, 93

j  : /_ 7

/}j ,

f

,

,

b