MONTHYEARIR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 IR 05000352/20230022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000352/2023002 and 05000353/2023002 IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 IR 05000352/20244012024-03-19019 March 2024 Security Baseline Inspection Report 05000352/2024401 and 05000353/2024401 IR 05000352/20240102024-03-18018 March 2024 Biennial Problem Identification and Resolution Inspection Report 05000352/2024010 and 05000353/2024010 IR 05000352/20230062024-02-28028 February 2024 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2023006 and 05000353/2023006) IR 05000352/20243012024-02-0202 February 2024 Initial Operator Licensing Examination Report 05000352/2024301 and 05000353/2024301 IR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 IR 05000352/20230042024-01-31031 January 2024 Integrated Inspection Report 05000352/2023004 and 05000353/2023004 IR 05000352/20230102024-01-11011 January 2024 Age-Related Degradation Report 05000352/2023010 and 05000353/2023010 IR 05000352/20234012023-12-21021 December 2023 Cybersecurity Inspection Report 05000352/2023401 and 05000353/2023401 IR 05000352/20230032023-10-27027 October 2023 Integrated Inspection Report 05000352/2023003 and 05000353/2023003 and Independent Spent Fuel Storage Installation Inspection 07200065/2023001 ML23297A1722023-10-24024 October 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000352/2024010 and 05000353/2024010 IR 05000352/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000352/2023501 and 05000353/2023501 IR 05000352/20230052023-08-31031 August 2023 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2023005 and 05000353/2023005) IR 05000352/20230012023-04-28028 April 2023 Integrated Inspection Report 05000352/2023001 and 05000353/2023001 IR 05000352/20220062023-03-0101 March 2023 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2022006 and 05000353/2022006) IR 05000352/20220042023-02-13013 February 2023 Integrated Inspection Report 05000352/2022004 and 05000353/2022004 IR 05000352/20234022023-02-0707 February 2023 Security Baseline Inspection Report 05000352/2023402 and 05000353/2023402 IR 05000352/20233012023-01-26026 January 2023 Initial Operator Licensing Examination Report 05000352/2023301 and 05000353/2023301 IR 05000352/20220032022-11-0707 November 2022 Integrated Inspection Report 05000352/2022003 and 05000353/2022003 IR 05000352/20224022022-10-18018 October 2022 Security Baseline Inspection Report 05000352/2022402 and 05000353/2022402 IR 05000352/20220052022-08-31031 August 2022 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2022005 and 05000353/2022005) IR 05000352/20224012022-08-0303 August 2022 Material Control and Accounting Inspection Report 05000352/2022401 and 05000353/2022401 (Cover Letter Only) IR 05000352/20220022022-08-0101 August 2022 Integrated Inspection Report 05000352/2022002 and 05000353/2022002 IR 05000352/20220112022-06-30030 June 2022 Triennial Fire Protection Inspection Report 05000352/2022011 and 05000353/2022011 IR 07200065/20210012022-06-0909 June 2022 Independent Spent Fuel Storage Installation (ISFSI) NRC Inspection Report No. 07200065/2021001 and Exercise of Enforcement Discretion IR 05000352/20220012022-05-0404 May 2022 Integrated Inspection Report 05000352/2022001 and 05000353/2022001 IR 05000352/20220102022-03-0909 March 2022 Biennial Problem Identification and Resolution Inspection Report 05000352/2022010 and 05000353/2022010 IR 05000352/20210062022-03-0202 March 2022 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2021006 and 05000353/2021006) IR 05000352/20214012022-02-15015 February 2022 Security Baseline Inspection Report 05000352/2021401 and 05000353/2021401 IR 05000352/20210042022-02-0909 February 2022 Integrated Inspection Report 05000352/2021004 and 05000353/2021004 IR 05000352/20215012021-11-29029 November 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000352/2021501 and 05000353/2021501 IR 05000352/20210032021-11-0404 November 2021 Integrated Inspection Report 05000352/2021003 and 05000353/2021003 IR 05000352/20214202021-10-0404 October 2021 NRC Inspection Report 05000352/2021420 and 05000353/2021420 IR 05000352/20213012021-09-16016 September 2021 Initial Operator Licensing Examination Report 05000352/2021301 and 05000353/2021301 IR 05000352/20210052021-09-0101 September 2021 Updated Inspection Plan for the Limerick Generating Station, Units 1 and 2 (Report 05000352/2021005 and 05000353/2021005) IR 05000352/20214022021-08-24024 August 2021 Security Baseline Inspection Report 05000352/2021402 and 05000353/2021402 IR 05000352/20210022021-08-10010 August 2021 Integrated Inspection Report 05000352/2021002 and 05000353/2021002 IR 05000352/20210012021-04-30030 April 2021 Integrated Inspection Report 05000352/2021001 and 05000353/2021001 IR 05000352/20210102021-03-0909 March 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000352/2021010 and 05000353/2021010 IR 05000352/20200062021-03-0303 March 2021 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2020006 and 05000353/2020006) IR 05000352/20200042021-02-0202 February 2021 Integrated Inspection Report 05000352/2020004 and 05000353/2020004 and Independent Spent Fuel Storage Installation Inspection Report 07200065/2020002 IR 05000352/20200152021-01-0404 January 2021 Temporary Instruction 2515/194 Inspection Report 05000352/2020015 and 05000353/2020015 IR 05000352/20200032020-11-0404 November 2020 Integrated Inspection Report 05000352/2020003 and 05000353/2020003 2024-09-04
[Table view] Category:Letter
MONTHYEARIR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20230022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000352/2023002 and 05000353/2023002 IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . ML24093A0912024-04-17017 April 2024 Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24106A1832024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24096A1372024-04-0505 April 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Limerick Generating Station – Holtec MPC-89CBS RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report IR 05000352/20244012024-03-19019 March 2024 Security Baseline Inspection Report 05000352/2024401 and 05000353/2024401 2024-09-06
[Table view] |
See also: IR 05000352/2024010
Text
October 24, 2023
David P. Rhoades
Senior Vice President
Constellation Energy Generation, LLC
President and Chief Nuclear Officer (CNO)
Constellation Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: LIMERICK GENERATING STATION, UNITS 1 AND 2 - REQUEST FOR
INFORMATION FOR A BIENNIAL PROBLEM IDENTIFICATION AND
RESOLUTION INSPECTION; INSPECTION REPORT 05000352/2024010 AND
05000353/2024010
Dear David Rhoades:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region I staff will conduct a biennial problem identification and resolution inspection at
Limerick Generating Station, Units 1 and 2. Matthew Hardgrove, a Senior Project Engineer from
the NRCs Region I office, will lead the inspection team. The inspection will be conducted in
accordance with Inspection Procedure 71152, Problem Identification and Resolution, dated
December 14, 2021 (ADAMS Accession No. ML21281A181).
The inspection will assess the effectiveness of your problem identification and resolution
program in identifying, prioritizing, evaluating, and correcting problems, including the use of
operating experience, assessments, and audits. This inspection will also assess your program
for raising concerns under the established safety conscious work environment.
The onsite inspection is scheduled for the weeks of January 29 and February 12, 2024.
In order to minimize the inspection impact on the site and to ensure a productive inspection for
both parties, we have enclosed a request for information needed for the inspection. It is
important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection. Insofar as possible, this information should be provided electronically to the lead
inspector by December 1, 2024.
If there are any questions about the inspection or the material requested in the enclosure,
please contact the lead inspector at 610-337-5142 or via email at matthew.hardgrove@nrc.gov.
D. Rhoades 2
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget Control Number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
Exemptions, Requests for Withholding.
Sincerely,
Digitally signed by Sarah
Sarah H. H. Elkhiamy
Date: 2023.10.24
Elkhiamy 12:42:09 -04'00'
Sarah Elkhiamy, Acting Chief
Projects Branch 4
Division of Operating Reactor Safety
Docket No. 05000352 and 05000353
License No. NPF-39 and NPF-85
Enclosure:
Request for Information for Biennial
Problem Identification and Resolution
cc w/ encl: Distribution via ListServ
ML23297A172
x Non-Sensitive x Publicly Available
x SUNSI Review
Sensitive Non-Publicly Available
OFFICE RI/DORS RI/DORS
NAME MHardgrove SElkhiamy
DATE 10/24/2023 10/24/2023
REQUEST FOR INFORMATION
BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION
Inspection Report: 05000352/2024010 and 05000353/2024010
Onsite Inspection Dates: January 29, through February 2, 2024; and
February 12, through February 16, 2024
Inspection Procedure: 71152, Problem Identification and Resolution,
dated December 14, 2021
Lead Inspector: Matthew Hardgrove, Senior Project Engineer
610-337-5142
matthew.hardgrove@nrc.gov
The following information is requested by December 1, 2024, or sooner, to facilitate inspection
preparation. The requested information is for the period from April 1, 2022 through
January 29, 2024 (Present), which covers the timeframe since the previous problem
identification and resolution (PI&R) inspection. The inspection procedure also specifies a five-
year review for a subset of selected program, system, or component issues. The selected
samples for this five-year review will be provided at a future date.
An information gathering trip is currently scheduled for the week of December 11, 2023. The
purpose of this trip is for the team lead to familiarize their self with the site organization including
meetings with department managers and overview of the corrective action program and to
finalize remaining administrative arrangements for the inspection.
Feel free to contact the lead inspector as soon as possible if you have any questions regarding
this information request. Please provide the information electronically in pdf files, Excel, or
other searchable formats, preferably on an internet database system (e.g., OneDrive) The files
should contain descriptive names, be indexed, and hyperlinked to facilitate ease of use.
Information in lists should contain enough information to be easily understood by someone
who has knowledge of light water reactor technology.
I. General
1. Organization charts, phone list, and list of system engineers.
2. List of system numbers/designations and a list of system engineers assigned to those
systems.
3. Access to a hardcopy set of system prints (P&IDs) and operator training manuals for the
team room. These will be returned at the end of the inspection.
4. Technical Requirements Manual (TRM) including the bases.
5. Copy of the Quality Assurance Manual and Quality Assurance Topical Report.
6. A schedule of the date/time/location of meetings associated with implementation of the
correction action program such as Plan-of-the-Day, Station Ownership Committee
(SOC), Management Review Committee (MRC), etc.
Enclosure
REQUEST FOR INFORMATION
BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION
7. PRA risk-ranking of systems, including a chart with highest risk systems/components.
II. Corrective Actions
1. Copy of procedures related to the corrective action program, including issue
identification, cause evaluations, corrective actions, trending, self-assessments, audits,
operability determinations, work management, operating experience, etc.
2. List of all corrective action program deficiency reports (IRs, ARs, etc.) initiated after
April 1, 2022 (last PI&R inspection) - in electronic spreadsheet format - include the
following (as applicable): system number/designation, date initiated, significance level,
status (open or closed), title/short description, department, date closed or due, and if
possible, the number of due date extensions.
3. Separate list of all corrective action program documents (IRs, ARs, etc.) initiated before
April 1, 2022 (last PI&R inspection) that remain open - in electronic spreadsheet format
- include the following (as applicable): system number/designation, date initiated,
significance level, status (open or closed), title/short description, department, date
closed or due, and if possible, the number of due date extensions.
4. List of all root cause evaluations (RCE), apparent cause evaluations (ACE), common
cause evaluations (CCE), and work group evaluations (WGE), performed after
April 1, 2022 (last PI&R inspection) - include number, title, eval type, and date
completed.
5. Matrix of the total number of condition report IRs generated annually and monthly for all
of 2022 and 2023, and to date for 2024 by department.
6. For all notice of violations (NOVs), non-cited violations (NCVs), and findings (FIN) issued
since April 1, 2022 (last PI&R inspection) - provide copies of the associated IRs
including all supporting information such as closeout documentation.
7. For all licensee event reports (LERs) issued since April 1, 2022 (last PI&R inspection) -
provide copies of the associated IRs including all supporting information such as
closeout documentation.
8. List of open temporary modifications, operability determinations, control room
deficiencies and operator workarounds\challenges, and adverse condition monitoring
plans - in electronic spreadsheet format - include tracking no., system id., title/short
description, date initiated, and date corrective action(s) due/work order(s) scheduled.
9. List of rework and repeat maintenance items, and a list of maintenance performance
metrics including the backlog of corrective and elective maintenance issues - include
tracking no., unit/system id, work order no., title/short description, date initiated, date
corrective action(s) due/work order(s) scheduled, and department.
10. Copies of the system health reports for all (a)(1) systems and all systems pending
maintenance rule expert panel review for (a)(1) status determination.
2
REQUEST FOR INFORMATION
BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION
11. List of all maintenance rule systems, include risk significance of system (high or low) and
whether the system is considered an (a)(1) or (a)(2). The list should indicate the trend in
overall system performance since the last PI&R inspection. For all (a)(1) systems,
please include a copy of the Action Plan and expert panel minutes.
III. Operating Experience
1. List of operating experience reviews, including Part 21s and NRC generic
communications (i.e., Information Notices, Generic Letters, Bulletins) initiated since the
last PI&R inspection. Provide tracking number, title/short description, date initiated, date
due or closer, significance level, evaluation class/type, status, department, and, if
possible, the number of due date extensions.
2. List of industry operating experience issues (nuclear steam supply system (NSSS)
vendor reports, EPRI Reports, and Operating Experience (OPEX) reports from other
facilities) entered into the corrective action program for review since the last PI&R
inspection. Provide tracking number, title/short description, date initiated, date due or
closed, significance level, evaluation class/type, status, department, and, if possible, the
number of due date extensions.
3. Provide list of correction action program tracking items generated as a result of issues
identified during the OPEX reviews and assessment. Provide tracking number, title/short
description, date initiated, date due or closer, significance level, evaluation class/type,
status, department, and, if possible, the number of due date extensions.
IV. Audits and Assessments
1. Copy of all quality assurance (QA) reviews (audits, assessments, etc.) and self-
assessments of the corrective action program performed since the last PI&R inspection.
2. List of all QA reviews, self-assessments, and safety culture reviews since last PI&R
inspection.
3. Copy of the corrective action program trend reports and performance indicators used by
management since the last PI&R inspection.
4. A list of IRs generated as a result of identified trends (either by station or department)
initiated since the last PI&R inspection. Provide IR number, title, and open/closed status.
5. List of reports or specific issues identified by safety review committees (such as PORC,
NSRB, etc.) or other management oversight mechanisms since the last PI&R inspection.
Indicate whether these items are being tracked in the corrective action program or other
means.
6. Most recent PI&R functional area self-assessment (FASA) that was performed in
preparation for the upcoming PI&R inspection.
3
REQUEST FOR INFORMATION
BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION
7. Hardcopy of last completed Institute of Nuclear Power Operations (INPO) evaluation and
assistance report. (Will be reviewed onsite to maintain confidentiality)
V. Safety Conscious Work Environment and Employee Concerns Program (ECP)
1. Procedures related to the ECP.
2. Procedures related to the Safety Conscious Work Environment and the stations
management of related issues.
3. Access to a list of all ECP cases and contacts initiated since the last PI&R inspection.
Include a list of IRs generated as a result of these reviews. (Will be reviewed onsite to
maintain confidentiality)
4. A copy of all safety culture reviews (audits, assessments, surveys, trend review, etc.)
initiated since the last PI&R inspection. Include a list of any IRs generated as a result of
these reviews. (Will be reviewed onsite to maintain confidentiality)
4