ML20141C844
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML20141C844 | |
Person / Time | |
---|---|
Site: | Portsmouth Gaseous Diffusion Plant, 07007001 |
Issue date: | 03/14/1997 |
From: | Jazel Parks ENERGY, DEPT. OF |
To: | Ten Eyck E NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
References | |
NUDOCS 9705190241 | |
Download: ML20141C844 (2) | |
Similar Documents at Portsmouth Gaseous Diffusion Plant, 07007001 | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N5861999-10-22022 October 1999
[Table view]Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-7002/99-09 Issued on 990827 ML20217H6911999-10-19019 October 1999 Ack Receipt of 990928 Application to Revise Technical Safety Requirements 2.2.3.15 & 2.7.3.14.Initial Administrative Review Finds Application Acceptable.Completion of Review Is Anticipated by 991215 ML20217N7591999-10-18018 October 1999 Provides Monthly Update on Progress of Installation of Seismic Upgrade Mods to Bldgs C-331 & C-335 ML20217M3861999-10-15015 October 1999 Provides Addl Changes to SAR Update Certificate Amend Request,Containing Changes That Resulted from re-evaluation of Autoclave head-to-shell O-ring Leakage Analysis Provided by DOE SAR Repts ML20217M2961999-10-15015 October 1999 Provides Addl Changes to Updated SAR Certificate Amend Request,Including Changes Made IAW Item 5 of Plan of Action Schedule for Compliance Plan Issue 2 & Changes That Resulted from Reevaluation of Autoclave head-to-shell O-ring ML20217N9141999-10-15015 October 1999 Forwards Rev 6 of NCS Cap,Providing Addl Details within Subtask 3.3,addl Ncsa/E Reviews & Establishes New Milestone to Conduct Addl Reviews IAW Procedure XP2=EG-NS1037, Review of Non-Priority 1 & 2 ML20217G1731999-10-14014 October 1999 Requests Addl Info Re Applications Dtd 990924,requesting Amends to Cocs for Paducah & Portsmouth GDPs for Revised QA Programs.Encl Identifies Specific Info Needed.Info Should Be Provided within 30 Days ML20217G4671999-10-14014 October 1999 Forwards Proprietary Insp Rept 70-7002/99-207 on 990920-23. No Violations Noted.Under Provisions of Section 2.790(d), Repts Containing Info Related to Licensee MC&A Program, Exempt from Public Disclosure ML20217G1811999-10-14014 October 1999 Forwards Reissued Amend to Coc for Usec Paducah Gdp.Coc Corrects Coc Issued on 991006.Amend Number & Effective Date Were Inadvertently Incorporated as 3 & 991026,instead of 4 & 991105 ML20217F6801999-10-12012 October 1999 Forwards Updated Paducah GDP Certificate Amend Requests at NRC for Approval ML20217F5481999-10-0808 October 1999 Discusses Insp Rept 70-7002/99-12 on 990810-0920 at Ports- Mouth Gaseous Diffusion Plant.No Cited Violations of NRC Requirements Were Identified During Insp ML20217B3521999-10-0606 October 1999 Forwards Amend 3 to Certificate of Compliance GDP-1 to Revise Six Technical Safety Requirements Sections.Sections Are 2.1.4.17,2.1.4.8,2.3.4.1,2.3.4.4,2.3.4.16 & 3.10.4.b. Compliance Evaluation Rept Also Encl ML20217B2801999-10-0606 October 1999 Forwards Insp Rept 70-7001/99-203 on 990921-23.No Violations Noted ML20217B6121999-10-0606 October 1999 Forwards Copy of Security Incident Log for Month of Sept 1999 ML20212K8941999-10-0404 October 1999 Forwards Insp Rept 70-7001/99-10 on 990720-0907 & Forwards NOV Indicating That Some Personnel Were Incorrectly Granted Unescorted Access to Controlled Access Areas Without Having Necessary Specific Training ML20217A4781999-10-0404 October 1999 Forwards Revised Event Rept 99-17,for Event Resulting from Determination That Sprinkler Sys Not Capable of Meeting Operability Requirements.Caused by Mineral Deposits.Provided Following Completion of Root Cause Evaluation ML20216J8931999-10-0101 October 1999 Forwards Copy of Security Incident Log & Associated Info for Sept 1999 ML20216J9081999-09-30030 September 1999 Forwards Revised Written Event Rept 99-10,rev 3,pertaining to Corroded Fire Sprinkler Heads Affecting Operability of high-pressure Fire Water (HPFW) Sprinkler Sys.No Commitment Contained in Rept ML20217M3701999-09-29029 September 1999 Submits bi-monthly Update on Progress of Mods to Upgrade Audibility of Criticality Accident Alarm Sys (Caas).Schedule for CAAS Audibility Upgrades Attached ML20212H5991999-09-27027 September 1999 Responds to Violations Noted in Insp Rept 70-7002/99-09. Corrective Actions:Engineering Evaluated Site Rail Track Insp Process for Improvement ML20216J7891999-09-27027 September 1999 Provides Required 30-day Event Rept 99-19 for Event That Resulted from Failure of Cascade Automatic Data Processing Data Processing Smoke Detection Sys at Portsmouth Gaseous Diffusion Plant.Encl 2 Is List of Commitments Made in Rept ML20212H1251999-09-24024 September 1999 Notifies NRC of Change in Regulatory Commitments Associated with Submittal Date for Update of Application SAR Chapter 3.Specifics of Commitment Changes of Listed ML20212H3801999-09-24024 September 1999 Responds to 990723 RAI Re 1999 Annual Update to Certification Applications ML20212G9401999-09-23023 September 1999 Responds to 990806 Reply to NOV in Ltr with Insp Rept 70-7002/99-04.Revised Reply Reviewed & Responses to Violations 1.B & 1.C Do Not Fully Address Needs as Clarified in 990715 Telcon.Resubmit Response within 30 Days of Ltr ML20212G0551999-09-23023 September 1999 Provides Revised 30-day Event Rept 99-06 for Emergency Condition That Was Declared Alert at Portsmouth Gaseous Diffusion Plant ML20212H3721999-09-22022 September 1999 Forwards NRC Form 790 Classification Record Documents for Paducah & Portsmouth GDPs That Were Generated During Month of Aug 1999.Without Encl ML20212F0981999-09-22022 September 1999 Forwards Insp Rept 70-7001/99-12 on 990830-0902.Purpose of Insp Was to Determine If Security Requirements Adequately Implemented & Included Review of Approved Plant Security Plan.No Violations Identified ML20217J1211999-09-20020 September 1999 Submits Listed Comments on NRC Proposed Rule, Reporting Requirements for Nuclear Power Reactors ML20212D4291999-09-17017 September 1999 Forwards Required 30-day Written Event Rept Re Criticality Accident Alarm Sys Response Time in Bldg C-710.Encl 2 Contains Commitments Contained in Submittal ML20212D4231999-09-16016 September 1999 Informs That Review of Event Rept Er 99-12 Revealed Listed Two Statements Inadvertently Omitted from Document ML20212B6611999-09-15015 September 1999 Forwards Insp Rept 70-7001/99-202 on 990816-20.No Violations Noted ML20212D2361999-09-15015 September 1999 Submits Monthly Update on Progress of Installation of Seismic Upgrade Mods to Bldgs C-331 & C-335 ML20212A5441999-09-14014 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-7001/99-07 ML20212A5531999-09-14014 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-7001/99-08 ML20216E6911999-09-13013 September 1999 Forwards 30-day Written Rept Er 99-18,re Actuation of Cascade ADP Smokehead in X-333 Bldg Low Assay Withdrawal Station.Caused by UF6 Release from Law A/B Compressor Shaft Seal Area.Planned C/As Will Be Provided in Revised Rept ML20211Q7761999-09-10010 September 1999 Forwards Insp Rept 70-7002/99-205 on 990816-20.No Violations Noted.Insp Consisted of Selective Exams of Computer Systems, Representative Records & Interviews with Personnel ML20211Q9951999-09-10010 September 1999 Forwards 30-day Written Rept ER-99-12,re Loss of Power to Autoclave Position 1 North & 1 South Process Gas Leak Detection (Pgld) in Bldg C-333-A.Caused by Electrical Short Circuit.Submitted Work Request 501636 for PI SEX-4 ML20211P2091999-09-0909 September 1999 Provides Staff Written Clarification of NRC Reporting Expectations of When Double Contingency Losses Should Be Reported to NRC IAW Bulletin 91-001, Reporting Loss of Criticality Safety Controls, & Suppl ML20216E4891999-09-0909 September 1999 Responds to Violations Noted in Insp Rept 70-7001/99-08. Corrective Actions:On 990602 Responsible Organization Manager Met with FP Engineer Performing Bldg Reappraisal & Made Clear Expectation for Prompt Reporting of Deficiencies ML20211Q8041999-09-0808 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-7002/99-05 ML20211Q7171999-09-0808 September 1999 Forwards Required 30-day Written Event Rept 99-14,rev 1,re 990628 Event Involving Actuation of Brake Sys on Liquid U Hexafluoride Handling Crane at Plant.Revised Rept Includes Corrective Actions.Commitments in Rept Also Encl ML20211N8951999-09-0707 September 1999 Forwards Required 30 Day Event Rept 99-17,for Event That Resulted from Determination That 13 Sprinkler Sys Associated with High Pressure Fire Water Sys in Process Buildings Were Not Capable of Meeting Operability Requirements ML20211P3831999-09-0303 September 1999 Forwards Coc GDP-1,amend 3 & Coc GDP-2,amend 4 for Paducah (Pgdp) & Portsmouth (Ports) Gdps,Respectively by Revising Pgdp & Ports QAPs in Vol 3 of Respective Certificate Applications ML20211M6401999-09-0303 September 1999 Forwards Security Incident Log for Month of Aug 1999,per Requirements of 10CFR95.57(b) ML20211L6441999-09-0202 September 1999 Forwards Insp Rept 70-7001/99-11 on 990802-06.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress ML20211M6941999-09-0202 September 1999 Forwards 30-day Written Event Rept 99-09,rev 1,for Event Involving Actuation of Brake Sys on Liquid U Hexafluoride Handling Crane at Plant.Revised Rept Includes Root Cause & Corrective Actions.List of Commitments,Included ML20211M3551999-09-0101 September 1999 Forwards Copy of Security Incident Log & Associated Info for Month of Aug 1999,IAW 10CFR95.57(b) ML20211L4871999-09-0101 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-7002/99-07 Issued on 990709 ML20211K2081999-08-31031 August 1999 Discusses 990730 Revised Response to RAI Transmitted by NRC Re 990528 Response for Severity Level IV Violations Identified in Insp Rept 70-7002/99-06 ML20211K4041999-08-31031 August 1999 Forwards Responses to Remaining NRC Questions/Comments from 980601 & 0709 NRC RAIs Re SAR Update 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML20217N7591999-10-18018 October 1999
[Table view]Provides Monthly Update on Progress of Installation of Seismic Upgrade Mods to Bldgs C-331 & C-335 ML20217N9141999-10-15015 October 1999 Forwards Rev 6 of NCS Cap,Providing Addl Details within Subtask 3.3,addl Ncsa/E Reviews & Establishes New Milestone to Conduct Addl Reviews IAW Procedure XP2=EG-NS1037, Review of Non-Priority 1 & 2 ML20217M3861999-10-15015 October 1999 Provides Addl Changes to SAR Update Certificate Amend Request,Containing Changes That Resulted from re-evaluation of Autoclave head-to-shell O-ring Leakage Analysis Provided by DOE SAR Repts ML20217M2961999-10-15015 October 1999 Provides Addl Changes to Updated SAR Certificate Amend Request,Including Changes Made IAW Item 5 of Plan of Action Schedule for Compliance Plan Issue 2 & Changes That Resulted from Reevaluation of Autoclave head-to-shell O-ring ML20217F6801999-10-12012 October 1999 Forwards Updated Paducah GDP Certificate Amend Requests at NRC for Approval ML20217B6121999-10-0606 October 1999 Forwards Copy of Security Incident Log for Month of Sept 1999 ML20217A4781999-10-0404 October 1999 Forwards Revised Event Rept 99-17,for Event Resulting from Determination That Sprinkler Sys Not Capable of Meeting Operability Requirements.Caused by Mineral Deposits.Provided Following Completion of Root Cause Evaluation ML20216J8931999-10-0101 October 1999 Forwards Copy of Security Incident Log & Associated Info for Sept 1999 ML20216J9081999-09-30030 September 1999 Forwards Revised Written Event Rept 99-10,rev 3,pertaining to Corroded Fire Sprinkler Heads Affecting Operability of high-pressure Fire Water (HPFW) Sprinkler Sys.No Commitment Contained in Rept ML20217M3701999-09-29029 September 1999 Submits bi-monthly Update on Progress of Mods to Upgrade Audibility of Criticality Accident Alarm Sys (Caas).Schedule for CAAS Audibility Upgrades Attached ML20212H5991999-09-27027 September 1999 Responds to Violations Noted in Insp Rept 70-7002/99-09. Corrective Actions:Engineering Evaluated Site Rail Track Insp Process for Improvement ML20216J7891999-09-27027 September 1999 Provides Required 30-day Event Rept 99-19 for Event That Resulted from Failure of Cascade Automatic Data Processing Data Processing Smoke Detection Sys at Portsmouth Gaseous Diffusion Plant.Encl 2 Is List of Commitments Made in Rept ML20212H1251999-09-24024 September 1999 Notifies NRC of Change in Regulatory Commitments Associated with Submittal Date for Update of Application SAR Chapter 3.Specifics of Commitment Changes of Listed ML20212H3801999-09-24024 September 1999 Responds to 990723 RAI Re 1999 Annual Update to Certification Applications ML20212G0551999-09-23023 September 1999 Provides Revised 30-day Event Rept 99-06 for Emergency Condition That Was Declared Alert at Portsmouth Gaseous Diffusion Plant ML20212H3721999-09-22022 September 1999 Forwards NRC Form 790 Classification Record Documents for Paducah & Portsmouth GDPs That Were Generated During Month of Aug 1999.Without Encl ML20217J1211999-09-20020 September 1999 Submits Listed Comments on NRC Proposed Rule, Reporting Requirements for Nuclear Power Reactors ML20212D4291999-09-17017 September 1999 Forwards Required 30-day Written Event Rept Re Criticality Accident Alarm Sys Response Time in Bldg C-710.Encl 2 Contains Commitments Contained in Submittal ML20212D4231999-09-16016 September 1999 Informs That Review of Event Rept Er 99-12 Revealed Listed Two Statements Inadvertently Omitted from Document ML20212D2361999-09-15015 September 1999 Submits Monthly Update on Progress of Installation of Seismic Upgrade Mods to Bldgs C-331 & C-335 ML20216E6911999-09-13013 September 1999 Forwards 30-day Written Rept Er 99-18,re Actuation of Cascade ADP Smokehead in X-333 Bldg Low Assay Withdrawal Station.Caused by UF6 Release from Law A/B Compressor Shaft Seal Area.Planned C/As Will Be Provided in Revised Rept ML20211Q9951999-09-10010 September 1999 Forwards 30-day Written Rept ER-99-12,re Loss of Power to Autoclave Position 1 North & 1 South Process Gas Leak Detection (Pgld) in Bldg C-333-A.Caused by Electrical Short Circuit.Submitted Work Request 501636 for PI SEX-4 ML20216E4891999-09-0909 September 1999 Responds to Violations Noted in Insp Rept 70-7001/99-08. Corrective Actions:On 990602 Responsible Organization Manager Met with FP Engineer Performing Bldg Reappraisal & Made Clear Expectation for Prompt Reporting of Deficiencies ML20211Q7171999-09-0808 September 1999 Forwards Required 30-day Written Event Rept 99-14,rev 1,re 990628 Event Involving Actuation of Brake Sys on Liquid U Hexafluoride Handling Crane at Plant.Revised Rept Includes Corrective Actions.Commitments in Rept Also Encl ML20211N8951999-09-0707 September 1999 Forwards Required 30 Day Event Rept 99-17,for Event That Resulted from Determination That 13 Sprinkler Sys Associated with High Pressure Fire Water Sys in Process Buildings Were Not Capable of Meeting Operability Requirements ML20211M6401999-09-0303 September 1999 Forwards Security Incident Log for Month of Aug 1999,per Requirements of 10CFR95.57(b) ML20211M6941999-09-0202 September 1999 Forwards 30-day Written Event Rept 99-09,rev 1,for Event Involving Actuation of Brake Sys on Liquid U Hexafluoride Handling Crane at Plant.Revised Rept Includes Root Cause & Corrective Actions.List of Commitments,Included ML20211M3551999-09-0101 September 1999 Forwards Copy of Security Incident Log & Associated Info for Month of Aug 1999,IAW 10CFR95.57(b) ML20211K4041999-08-31031 August 1999 Forwards Responses to Remaining NRC Questions/Comments from 980601 & 0709 NRC RAIs Re SAR Update ML20211G9971999-08-26026 August 1999 Forwards Rev 2 to Written Rept Er 99-10,re Corroded Fire Sprinkler Sys in Bldg C-337 & C-333.Analysis of Root Cause Has Not Been Completed.Statistically Based Sprinkler head- Sampling Plan Has Been Completed & Approved ML20211D9311999-08-23023 August 1999 Forwards Required 30-day Written Event Rept 99-16 Re Event Involving Autoclave High Condensate Level Shutoff Actuation at Portsmouth Gaseous Diffusion Plant.List of Commitments, Included ML20211F1761999-08-20020 August 1999 Requests That Paducah GDP facility,C-709 Lab Annex Bldg Be Added to List of Facilities to Be Exempted from CAAS Detection Coverage ML20211D9751999-08-20020 August 1999 Forwards Rev 1 to Final Written Event Rept Er 99-11,re Unplanned Actuation of C-333-A Autoclave 1 North Autoclave Steam Pressure Control Sys (Aspcs) on 990623 ML20211C5951999-08-17017 August 1999 Submits Changes to Authorized Derivative Classifier List for Portsmouth Gdp.Changes Are Current as of 990806 ML20211D5811999-08-16016 August 1999 Submits Monthly Update on Progress of Installation of Seismic Upgrade Mods to Bldgs C-331 & C-335 ML20211D5771999-08-16016 August 1999 Submits Rev 1 to Event Rept 99-12,to Clarify That Only One of 50 Ball Lock Pins on Packages Used in Shipment Was Unfastened When Shipment Was Received.Cause Has Not Been Determined.Usec Revised Procedure XP4-TE-UH2400 ML20211D2351999-08-16016 August 1999 Replaces Ltr Forwarding Proprietary Followup to Submittal Re Holdup of U Enriched Greater than or Equal to 10 Weight Percent U-235 in Process Equipment ML20211C8031999-08-13013 August 1999 Forwards Proprietary Versions of Rev 33 Changes to Fundamental Nuclear Matls Control Plan & Transportation Security Plan.Proprietary Encl Withheld ML20211C3941999-08-13013 August 1999 Forwards Proprietary Followup to Submittal Re Holdup of U Enriched Greater than or Equal to 10 Weight Percent U-235 in Process Equipment.Encls Withheld ML20210Q6061999-08-0909 August 1999 Forwards NRC Form 790 Classification Record Documents for Paducah & Portsmouth Gdps,Per 10CFR95.57.Records Were Generated During Month of July 1999.Without Encl ML20210Q5291999-08-0909 August 1999 Responds to Violations Noted in Insp Rept 70-7002/99-07. Corrective Actions:On 990622,results of Nda Surveys for G-17 Valves Moved Outside Bldg X-744H Were Obtained ML20210P1841999-08-0606 August 1999 Revised Response to NRC NOV Re Violations Noted in Insp Rept 70-7002/99-04.Corrective actions:DOI-832-99-03 Revised & Reissued on 990729,to Include Any Document Utilized to Support Safety Basis in Ncse ML20210N8511999-08-0606 August 1999 Forwards Copy of Security Incident Log for Month of July 1999 ML20211N2031999-08-0404 August 1999 Forwards Proprietary Versions of Rev 32 Changes to Fundamental Nuclear Matls Control Plan (FNMCP) & Transportation Security Plan.Proprietary Info Withheld,Per 10CFR2.790 & 9.17(a)(4) ML20210L1751999-08-0202 August 1999 Forwards Required 30-day Event Rept 99-15 Re Event That Resulted from Declaration of Alert Emergency Classification at Portsmouth Gaseous Diffusion Plant.Encl 2 Contains List of Commitments Made by Licensee ML20210U8511999-07-30030 July 1999 Forwards Quarterly Status Rept for Portsmouth Nuclear Criticality Safety Program Corrective Action Plan for Period 990421-0716.No New Commitments Are Contained in Submittal ML20210H3161999-07-30030 July 1999 Forwards Rev 1 to Written Event Rept ER-99-10,re Corroded Fire Sprinkler Heads Affecting Operability of HP Fire Water Sprinkler Sys in Bldg C-337 & C-333.Testing & Analysis of Root Cause & Corrective Actions Necessary Are Not Complete ML20210K0291999-07-30030 July 1999 Responds to NRC Expressing Concerns with 990528 Reply to NOVs Re Insp Rept 70-7002/99-006.Revised Response Encl ML20210J1331999-07-30030 July 1999 Forwards Copy of Security Incident Log & Associated Info for Month of July 1999,per Reporting Requirements of 10CFR95.57(b) ML20210H2181999-07-29029 July 1999 Responds to Violations Noted in Insp Rept 70-7001/99-07. Corrective Actions:Smoke Watch Was Established Covering Area Affected by Process Gas Leak Detection Inoperabilty & Individuals Involved Were Counseled for Personnel Errors 1999-09-09 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20141C844&oldid=3615401"