ML20217N75918 October 1999Provides Monthly Update on Progress of Installation of Seismic Upgrade Mods to Bldgs C-331 & C-335
ML20217M38615 October 1999Provides Addl Changes to SAR Update Certificate Amend Request,Containing Changes That Resulted from re-evaluation of Autoclave head-to-shell O-ring Leakage Analysis Provided by DOE SAR Repts
ML20217M29615 October 1999Provides Addl Changes to Updated SAR Certificate Amend Request,Including Changes Made IAW Item 5 of Plan of Action Schedule for Compliance Plan Issue 2 & Changes That Resulted from Reevaluation of Autoclave head-to-shell O-ring
ML20217N91415 October 1999Forwards Rev 6 of NCS Cap,Providing Addl Details within Subtask 3.3,addl Ncsa/E Reviews & Establishes New Milestone to Conduct Addl Reviews IAW Procedure XP2=EG-NS1037, Review of Non-Priority 1 & 2
ML20217F68012 October 1999Forwards Updated Paducah GDP Certificate Amend Requests at NRC for Approval
ML20217B6126 October 1999Forwards Copy of Security Incident Log for Month of Sept 1999
ML20217A4784 October 1999Forwards Revised Event Rept 99-17,for Event Resulting from Determination That Sprinkler Sys Not Capable of Meeting Operability Requirements.Caused by Mineral Deposits.Provided Following Completion of Root Cause Evaluation
ML20216J8931 October 1999Forwards Copy of Security Incident Log & Associated Info for Sept 1999
ML20216J90830 September 1999Forwards Revised Written Event Rept 99-10,rev 3,pertaining to Corroded Fire Sprinkler Heads Affecting Operability of high-pressure Fire Water (HPFW) Sprinkler Sys.No Commitment Contained in Rept
ML20217M37029 September 1999Submits bi-monthly Update on Progress of Mods to Upgrade Audibility of Criticality Accident Alarm Sys (Caas).Schedule for CAAS Audibility Upgrades Attached
ML20212H59927 September 1999Responds to Violations Noted in Insp Rept 70-7002/99-09. Corrective Actions:Engineering Evaluated Site Rail Track Insp Process for Improvement
ML20216J78927 September 1999Provides Required 30-day Event Rept 99-19 for Event That Resulted from Failure of Cascade Automatic Data Processing Data Processing Smoke Detection Sys at Portsmouth Gaseous Diffusion Plant.Encl 2 Is List of Commitments Made in Rept
ML20212H38024 September 1999Responds to 990723 RAI Re 1999 Annual Update to Certification Applications
ML20212H12524 September 1999Notifies NRC of Change in Regulatory Commitments Associated with Submittal Date for Update of Application SAR Chapter 3.Specifics of Commitment Changes of Listed
ML20212G05523 September 1999Provides Revised 30-day Event Rept 99-06 for Emergency Condition That Was Declared Alert at Portsmouth Gaseous Diffusion Plant
ML20212H37222 September 1999Forwards NRC Form 790 Classification Record Documents for Paducah & Portsmouth GDPs That Were Generated During Month of Aug 1999.Without Encl
ML20217J12120 September 1999Submits Listed Comments on NRC Proposed Rule, Reporting Requirements for Nuclear Power Reactors
ML20212D42917 September 1999Forwards Required 30-day Written Event Rept Re Criticality Accident Alarm Sys Response Time in Bldg C-710.Encl 2 Contains Commitments Contained in Submittal
ML20212D42316 September 1999Informs That Review of Event Rept Er 99-12 Revealed Listed Two Statements Inadvertently Omitted from Document
ML20212D23615 September 1999Submits Monthly Update on Progress of Installation of Seismic Upgrade Mods to Bldgs C-331 & C-335
ML20216E69113 September 1999Forwards 30-day Written Rept Er 99-18,re Actuation of Cascade ADP Smokehead in X-333 Bldg Low Assay Withdrawal Station.Caused by UF6 Release from Law A/B Compressor Shaft Seal Area.Planned C/As Will Be Provided in Revised Rept
ML20211Q99510 September 1999Forwards 30-day Written Rept ER-99-12,re Loss of Power to Autoclave Position 1 North & 1 South Process Gas Leak Detection (Pgld) in Bldg C-333-A.Caused by Electrical Short Circuit.Submitted Work Request 501636 for PI SEX-4
ML20216E4899 September 1999Responds to Violations Noted in Insp Rept 70-7001/99-08. Corrective Actions:On 990602 Responsible Organization Manager Met with FP Engineer Performing Bldg Reappraisal & Made Clear Expectation for Prompt Reporting of Deficiencies
ML20211Q7178 September 1999Forwards Required 30-day Written Event Rept 99-14,rev 1,re 990628 Event Involving Actuation of Brake Sys on Liquid U Hexafluoride Handling Crane at Plant.Revised Rept Includes Corrective Actions.Commitments in Rept Also Encl
ML20211N8957 September 1999Forwards Required 30 Day Event Rept 99-17,for Event That Resulted from Determination That 13 Sprinkler Sys Associated with High Pressure Fire Water Sys in Process Buildings Were Not Capable of Meeting Operability Requirements
ML20211M6403 September 1999Forwards Security Incident Log for Month of Aug 1999,per Requirements of 10CFR95.57(b)
ML20211M6942 September 1999Forwards 30-day Written Event Rept 99-09,rev 1,for Event Involving Actuation of Brake Sys on Liquid U Hexafluoride Handling Crane at Plant.Revised Rept Includes Root Cause & Corrective Actions.List of Commitments,Included
ML20211M3551 September 1999Forwards Copy of Security Incident Log & Associated Info for Month of Aug 1999,IAW 10CFR95.57(b)
ML20211K40431 August 1999Forwards Responses to Remaining NRC Questions/Comments from 980601 & 0709 NRC RAIs Re SAR Update
ML20211G99726 August 1999Forwards Rev 2 to Written Rept Er 99-10,re Corroded Fire Sprinkler Sys in Bldg C-337 & C-333.Analysis of Root Cause Has Not Been Completed.Statistically Based Sprinkler head- Sampling Plan Has Been Completed & Approved
ML20211D93123 August 1999Forwards Required 30-day Written Event Rept 99-16 Re Event Involving Autoclave High Condensate Level Shutoff Actuation at Portsmouth Gaseous Diffusion Plant.List of Commitments, Included
ML20211F17620 August 1999Requests That Paducah GDP facility,C-709 Lab Annex Bldg Be Added to List of Facilities to Be Exempted from CAAS Detection Coverage
ML20211D97520 August 1999Forwards Rev 1 to Final Written Event Rept Er 99-11,re Unplanned Actuation of C-333-A Autoclave 1 North Autoclave Steam Pressure Control Sys (Aspcs) on 990623
ML20211C59517 August 1999Submits Changes to Authorized Derivative Classifier List for Portsmouth Gdp.Changes Are Current as of 990806
ML20211D23516 August 1999Replaces Ltr Forwarding Proprietary Followup to Submittal Re Holdup of U Enriched Greater than or Equal to 10 Weight Percent U-235 in Process Equipment
ML20211D58116 August 1999Submits Monthly Update on Progress of Installation of Seismic Upgrade Mods to Bldgs C-331 & C-335
ML20211D57716 August 1999Submits Rev 1 to Event Rept 99-12,to Clarify That Only One of 50 Ball Lock Pins on Packages Used in Shipment Was Unfastened When Shipment Was Received.Cause Has Not Been Determined.Usec Revised Procedure XP4-TE-UH2400
ML20211C39413 August 1999Forwards Proprietary Followup to Submittal Re Holdup of U Enriched Greater than or Equal to 10 Weight Percent U-235 in Process Equipment.Encls Withheld
ML20211C80313 August 1999Forwards Proprietary Versions of Rev 33 Changes to Fundamental Nuclear Matls Control Plan & Transportation Security Plan.Proprietary Encl Withheld