Issue date | Title | Topic | |
---|---|---|---|
ML20217N759 | 18 October 1999 | Provides Monthly Update on Progress of Installation of Seismic Upgrade Mods to Bldgs C-331 & C-335 | |
ML20217M386 | 15 October 1999 | Provides Addl Changes to SAR Update Certificate Amend Request,Containing Changes That Resulted from re-evaluation of Autoclave head-to-shell O-ring Leakage Analysis Provided by DOE SAR Repts | |
ML20217M296 | 15 October 1999 | Provides Addl Changes to Updated SAR Certificate Amend Request,Including Changes Made IAW Item 5 of Plan of Action Schedule for Compliance Plan Issue 2 & Changes That Resulted from Reevaluation of Autoclave head-to-shell O-ring | |
ML20217N914 | 15 October 1999 | Forwards Rev 6 of NCS Cap,Providing Addl Details within Subtask 3.3,addl Ncsa/E Reviews & Establishes New Milestone to Conduct Addl Reviews IAW Procedure XP2=EG-NS1037, Review of Non-Priority 1 & 2 | |
ML20217F680 | 12 October 1999 | Forwards Updated Paducah GDP Certificate Amend Requests at NRC for Approval | |
ML20217B612 | 6 October 1999 | Forwards Copy of Security Incident Log for Month of Sept 1999 | |
ML20217A478 | 4 October 1999 | Forwards Revised Event Rept 99-17,for Event Resulting from Determination That Sprinkler Sys Not Capable of Meeting Operability Requirements.Caused by Mineral Deposits.Provided Following Completion of Root Cause Evaluation | |
ML20216J893 | 1 October 1999 | Forwards Copy of Security Incident Log & Associated Info for Sept 1999 | |
ML20216J908 | 30 September 1999 | Forwards Revised Written Event Rept 99-10,rev 3,pertaining to Corroded Fire Sprinkler Heads Affecting Operability of high-pressure Fire Water (HPFW) Sprinkler Sys.No Commitment Contained in Rept | |
ML20217M370 | 29 September 1999 | Submits bi-monthly Update on Progress of Mods to Upgrade Audibility of Criticality Accident Alarm Sys (Caas).Schedule for CAAS Audibility Upgrades Attached | |
ML20212H599 | 27 September 1999 | Responds to Violations Noted in Insp Rept 70-7002/99-09. Corrective Actions:Engineering Evaluated Site Rail Track Insp Process for Improvement | |
ML20216J789 | 27 September 1999 | Provides Required 30-day Event Rept 99-19 for Event That Resulted from Failure of Cascade Automatic Data Processing Data Processing Smoke Detection Sys at Portsmouth Gaseous Diffusion Plant.Encl 2 Is List of Commitments Made in Rept | |
ML20212H380 | 24 September 1999 | Responds to 990723 RAI Re 1999 Annual Update to Certification Applications | |
ML20212H125 | 24 September 1999 | Notifies NRC of Change in Regulatory Commitments Associated with Submittal Date for Update of Application SAR Chapter 3.Specifics of Commitment Changes of Listed | |
ML20212G055 | 23 September 1999 | Provides Revised 30-day Event Rept 99-06 for Emergency Condition That Was Declared Alert at Portsmouth Gaseous Diffusion Plant | |
ML20212H372 | 22 September 1999 | Forwards NRC Form 790 Classification Record Documents for Paducah & Portsmouth GDPs That Were Generated During Month of Aug 1999.Without Encl | |
ML20217J121 | 20 September 1999 | Submits Listed Comments on NRC Proposed Rule, Reporting Requirements for Nuclear Power Reactors | |
ML20212D429 | 17 September 1999 | Forwards Required 30-day Written Event Rept Re Criticality Accident Alarm Sys Response Time in Bldg C-710.Encl 2 Contains Commitments Contained in Submittal | |
ML20212D423 | 16 September 1999 | Informs That Review of Event Rept Er 99-12 Revealed Listed Two Statements Inadvertently Omitted from Document | |
ML20212D236 | 15 September 1999 | Submits Monthly Update on Progress of Installation of Seismic Upgrade Mods to Bldgs C-331 & C-335 | |
ML20216E691 | 13 September 1999 | Forwards 30-day Written Rept Er 99-18,re Actuation of Cascade ADP Smokehead in X-333 Bldg Low Assay Withdrawal Station.Caused by UF6 Release from Law A/B Compressor Shaft Seal Area.Planned C/As Will Be Provided in Revised Rept | |
ML20211Q995 | 10 September 1999 | Forwards 30-day Written Rept ER-99-12,re Loss of Power to Autoclave Position 1 North & 1 South Process Gas Leak Detection (Pgld) in Bldg C-333-A.Caused by Electrical Short Circuit.Submitted Work Request 501636 for PI SEX-4 | |
ML20216E489 | 9 September 1999 | Responds to Violations Noted in Insp Rept 70-7001/99-08. Corrective Actions:On 990602 Responsible Organization Manager Met with FP Engineer Performing Bldg Reappraisal & Made Clear Expectation for Prompt Reporting of Deficiencies | |
ML20211Q717 | 8 September 1999 | Forwards Required 30-day Written Event Rept 99-14,rev 1,re 990628 Event Involving Actuation of Brake Sys on Liquid U Hexafluoride Handling Crane at Plant.Revised Rept Includes Corrective Actions.Commitments in Rept Also Encl | |
ML20211N895 | 7 September 1999 | Forwards Required 30 Day Event Rept 99-17,for Event That Resulted from Determination That 13 Sprinkler Sys Associated with High Pressure Fire Water Sys in Process Buildings Were Not Capable of Meeting Operability Requirements | |
ML20211M640 | 3 September 1999 | Forwards Security Incident Log for Month of Aug 1999,per Requirements of 10CFR95.57(b) | |
ML20211M694 | 2 September 1999 | Forwards 30-day Written Event Rept 99-09,rev 1,for Event Involving Actuation of Brake Sys on Liquid U Hexafluoride Handling Crane at Plant.Revised Rept Includes Root Cause & Corrective Actions.List of Commitments,Included | |
ML20211M355 | 1 September 1999 | Forwards Copy of Security Incident Log & Associated Info for Month of Aug 1999,IAW 10CFR95.57(b) | |
ML20211K404 | 31 August 1999 | Forwards Responses to Remaining NRC Questions/Comments from 980601 & 0709 NRC RAIs Re SAR Update | |
ML20211G997 | 26 August 1999 | Forwards Rev 2 to Written Rept Er 99-10,re Corroded Fire Sprinkler Sys in Bldg C-337 & C-333.Analysis of Root Cause Has Not Been Completed.Statistically Based Sprinkler head- Sampling Plan Has Been Completed & Approved | |
ML20211D931 | 23 August 1999 | Forwards Required 30-day Written Event Rept 99-16 Re Event Involving Autoclave High Condensate Level Shutoff Actuation at Portsmouth Gaseous Diffusion Plant.List of Commitments, Included | |
ML20211F176 | 20 August 1999 | Requests That Paducah GDP facility,C-709 Lab Annex Bldg Be Added to List of Facilities to Be Exempted from CAAS Detection Coverage | |
ML20211D975 | 20 August 1999 | Forwards Rev 1 to Final Written Event Rept Er 99-11,re Unplanned Actuation of C-333-A Autoclave 1 North Autoclave Steam Pressure Control Sys (Aspcs) on 990623 | |
ML20211C595 | 17 August 1999 | Submits Changes to Authorized Derivative Classifier List for Portsmouth Gdp.Changes Are Current as of 990806 | |
ML20211D235 | 16 August 1999 | Replaces Ltr Forwarding Proprietary Followup to Submittal Re Holdup of U Enriched Greater than or Equal to 10 Weight Percent U-235 in Process Equipment | |
ML20211D581 | 16 August 1999 | Submits Monthly Update on Progress of Installation of Seismic Upgrade Mods to Bldgs C-331 & C-335 | |
ML20211D577 | 16 August 1999 | Submits Rev 1 to Event Rept 99-12,to Clarify That Only One of 50 Ball Lock Pins on Packages Used in Shipment Was Unfastened When Shipment Was Received.Cause Has Not Been Determined.Usec Revised Procedure XP4-TE-UH2400 | |
ML20211C394 | 13 August 1999 | Forwards Proprietary Followup to Submittal Re Holdup of U Enriched Greater than or Equal to 10 Weight Percent U-235 in Process Equipment.Encls Withheld | |
ML20211C803 | 13 August 1999 | Forwards Proprietary Versions of Rev 33 Changes to Fundamental Nuclear Matls Control Plan & Transportation Security Plan.Proprietary Encl Withheld |