MONTHYEARIR 05000458/20240032024-10-31031 October 2024 Integrated Inspection Report 05000458/2024003 IR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 IR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System2024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal 2024-09-09
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22188A1742022-07-19019 July 2022 Issuance of Amendment No. 211 Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22026A4892022-03-22022 March 2022 Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary ML21162A2112021-07-0202 July 2021 Issuance of Amendment No. 208 to Adopt Generic Letter 86-10 Standard License Condition for Fire Protection ML21146A0182021-06-0808 June 2021 Issuance of Amendments to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML21040A2922021-03-0404 March 2021 Issuance of Amendments Adoption of TSTF 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21019A2192021-02-24024 February 2021 Issuance of Amendment No. 227 Extension of Appendix J Integrated Leakage Test Interval ML21011A0682021-02-0202 February 2021 Issuance of Amendments Adoption of TSTF 439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20339A5182021-01-0606 January 2021 Issuance of Amendment No. 203 Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20244A0112020-09-28028 September 2020 Issuance of Amendment No. 202 Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- RITSTF Initiative 5b ML20101G0542020-04-15015 April 2020 Issuance of Amendment No. 224 One Cycle Extension of Appendix J Integrated Leakage Test and Drywell Bypass Test Interval (Exigent Circumstances) ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19071A2992019-06-19019 June 2019 Issuance of Amendment No. 198 Removal of Table of Contents from Renewed Operating License Technical Specifications ML19123A0142019-06-18018 June 2019 Issuance of Amendment No. 220, Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML19094A7992019-06-11011 June 2019 Issuance of Amendment No. 219 to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-425, Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5B ML19084A2182019-05-23023 May 2019 Issuance of Amendment No. 218 to Revise Technical Specification to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control ML19066A0082019-04-29029 April 2019 Issuance of Amendment Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3 ML18215A1962019-03-12012 March 2019 Issuance of Amendment No. 217 to Modify the Updated Safety Analysis Report to Replace Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals ML19025A0232019-03-12012 March 2019 Issuance of Amendment No. 216 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML18360A0252019-01-17017 January 2019 Redacted Version - Issuance of Amendment No. 195 Correction of a Non-Conservative Technical Specification for Pressure-Temperature Limits ML18345A3422018-12-21021 December 2018 Issuance of Amendment No. 194 Relocation of the Reactor Core Isolation Cooling Injection Point to the a Feedwater Line ML18284A3692018-12-20020 December 2018 Renewed Facility Operating License NPF-47 ML18306A5132018-11-30030 November 2018 Issuance of Conforming Amendment Nos. 262, 312 and 215 Transfers of Renewed Facility Operating Licenses ML18267A3412018-11-0707 November 2018 Issuance of Amendment No. 193 Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML17240A2322017-10-0404 October 2017 Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 213 for Administrative Name Change to Licensee South Mississippi Electric Power Association (CAC No. MF9588) ML17116A0322017-06-0707 June 2017 Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 212 to Adopt Technical Specifications Task Force-427, Allowance For Non-Technical Specification Barrier Degradation on Supported System Operability (CAC No. MF8692.) ML16243A0242016-12-0808 December 2016 Record of Decision - License Renewal Application for Grand Gulf Nuclear Station, Unit 1 ML16292A4622016-12-0101 December 2016 Renewed Facility Operating License for Grand Gulf Nuclear Station, Unit 1 ML16287A5992016-10-27027 October 2016 Issuance of Amendment No. 191, Revise Technical Specifications for Extension of Containment Leakage Tests Frequency ML16140A1332016-08-0404 August 2016 Issuance of Amendment Revision of Technical Specifications to Remove Inservice Testing Program and Clarify Surveillance Requirement Usage Rule Application ML16124A6882016-06-21021 June 2016 Issuance of Amendment No. 190 Cyber Security Plan Implementation Schedule ML16132A1942016-05-26026 May 2016 Correction to Amendment No. 207, Request for Changing Five Technical Specifications Allowable Levels ML16119A1482016-05-25025 May 2016 Issuance of Amendment No. 210 Re. Cyber Security Plan Milestone 8 Full Implementation Schedule ML16011A2472016-02-17017 February 2016 Issuance of Amendment No. 209 Revision of Technical Specifications for Containment Leak Rate Testing ML15336A2562015-12-17017 December 2015 Issuance of Amendment No. 208 Adoption of Technical Specification Task Force Traveler TSTF-522 ML15265A1162015-10-0101 October 2015 Issuance of Conforming Amendment to Reflect the Transfer of the Facility Operating License No. NPF-47 from Entergy Gulf States Louisiana, LLC to Entergy Louisiana, LLC ML15195A0612015-09-21021 September 2015 Issuance of Amendment No. 188 Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML15229A2192015-08-31031 August 2015 Redacted, Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus License Amendment Request ML15195A3552015-08-31031 August 2015 Issuance of Amendment Request for Changing Five Technical Specifications Allowable Values ML15180A1702015-08-31031 August 2015 Issuance of Amendment Revision to Technical Specification 5.65.B to Add Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density ML15229A2182015-08-18018 August 2015 Redacted, Issuance of Amendment Adoption of Single Fluence Methodology ML15229A2132015-08-18018 August 2015 Redacted, Issuance of Amendment Regarding Technical Specification 2.1.1.2 of Technical Specification Section 2.1.1.2, Reactor SLs (Safety Limits) 2024-08-13
[Table view] Category:Safety Evaluation
MONTHYEARML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22265A1802022-09-27027 September 2022 Proposed Alternative to the Requirements of ASME Code of Operation and Maintenance of Nuclear Power Plants for Pressure Isolation Valve Testing Frequency ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22026A4892022-03-22022 March 2022 Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary ML22007A3172022-01-18018 January 2022 1, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML21294A0672021-10-28028 October 2021 Inservice Testing Program Relief Request VRR-GGNS-2021-1, Alternative Request for Pressure Isolation Valve Testing Frequency ML21258A4082021-09-21021 September 2021 Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of Boiling Water Reactor Vessel and Internals Project Guidelines ML21162A2112021-07-0202 July 2021 Issuance of Amendment No. 208 to Adopt Generic Letter 86-10 Standard License Condition for Fire Protection ML21146A0182021-06-0808 June 2021 Issuance of Amendments to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML21040A2922021-03-0404 March 2021 Issuance of Amendments Adoption of TSTF 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21019A2192021-02-24024 February 2021 Issuance of Amendment No. 227 Extension of Appendix J Integrated Leakage Test Interval ML21011A0682021-02-0202 February 2021 Issuance of Amendments Adoption of TSTF 439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20339A5182021-01-0606 January 2021 Issuance of Amendment No. 203 Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20244A0112020-09-28028 September 2020 Issuance of Amendment No. 202 Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- RITSTF Initiative 5b ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI ML20101G0542020-04-15015 April 2020 Issuance of Amendment No. 224 One Cycle Extension of Appendix J Integrated Leakage Test and Drywell Bypass Test Interval (Exigent Circumstances) ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19266A5862019-10-11011 October 2019 Relief Request GG-ISI-023, Examination Coverage of Class 1 Piping and Vessel Welds ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19071A2992019-06-19019 June 2019 Issuance of Amendment No. 198 Removal of Table of Contents from Renewed Operating License Technical Specifications ML19123A0142019-06-18018 June 2019 Issuance of Amendment No. 220, Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML19094A7992019-06-11011 June 2019 Issuance of Amendment No. 219 to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-425, Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5B ML19084A2182019-05-23023 May 2019 Issuance of Amendment No. 218 to Revise Technical Specification to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control ML19066A0082019-04-29029 April 2019 Issuance of Amendment Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3 ML19025A0232019-03-12012 March 2019 Issuance of Amendment No. 216 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML19018A2692019-03-12012 March 2019 Safety Evaluation Input for Grand Gulf Nuclear Station Unit 1, License Amendment Request to Implement Technical Specification Task Force-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control ML18215A1962019-03-12012 March 2019 Issuance of Amendment No. 217 to Modify the Updated Safety Analysis Report to Replace Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals ML18360A0252019-01-17017 January 2019 Redacted Version - Issuance of Amendment No. 195 Correction of a Non-Conservative Technical Specification for Pressure-Temperature Limits ML18345A3422018-12-21021 December 2018 Issuance of Amendment No. 194 Relocation of the Reactor Core Isolation Cooling Injection Point to the a Feedwater Line ML18310A0132018-11-16016 November 2018 Relief from the Requirements of the ASME Code to Use Boiling Water Reactor Vessel Internals Guidelines as an Alternative ML18299A2732018-11-0707 November 2018 Request for Relief from Requirements of Asme Code RBS-ISI-016 from the Requirements of the ASME Code for Pressure Retaining Welds in Control Rod Housings (EPID-L-2018-LLR-0042) ML18267A3412018-11-0707 November 2018 Issuance of Amendment No. 193 Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18212A1512018-07-31031 July 2018 License Renewal Safety Evaluation Report ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML17285A7942017-10-30030 October 2017 Grand Gulf Nuclear Station, Unit 1 - Relief Request GG-ISI-021 Proposing An Alternative For Fourth Ten Year Inservice Inspection Program (CAC NO. MF9752; EPID L-2017-LLR-0031) ML17240A2322017-10-0404 October 2017 Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 213 for Administrative Name Change to Licensee South Mississippi Electric Power Association (CAC No. MF9588) ML17235A5332017-08-31031 August 2017 Relief Request GG-ISI-022 to Allow Use of Later Editions and Addenda of American Society of Mechanical Engineers Code for Inservice Inspection ML17116A0322017-06-0707 June 2017 Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 212 to Adopt Technical Specifications Task Force-427, Allowance For Non-Technical Specification Barrier Degradation on Supported System Operability (CAC No. MF8692.) ML17138A1442017-05-24024 May 2017 Relief from the Requirements of the ASME Code ML16287A5992016-10-27027 October 2016 Issuance of Amendment No. 191, Revise Technical Specifications for Extension of Containment Leakage Tests Frequency 2024-08-13
[Table view] Category:Technical Specifications
MONTHYEARML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22073A1752022-03-0808 March 2022 Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21162A2112021-07-0202 July 2021 Issuance of Amendment No. 208 to Adopt Generic Letter 86-10 Standard License Condition for Fire Protection ML21019A2192021-02-24024 February 2021 Issuance of Amendment No. 227 Extension of Appendix J Integrated Leakage Test Interval ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21039A2642021-01-27027 January 2021 Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML21039A3292021-01-27027 January 2021 Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML20244A0112020-09-28028 September 2020 Issuance of Amendment No. 202 Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- RITSTF Initiative 5b ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML18284A3702018-12-20020 December 2018 Renewed Facility Operating License NPF-47 Attachments and Appendices ML17240A2322017-10-0404 October 2017 Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 213 for Administrative Name Change to Licensee South Mississippi Electric Power Association (CAC No. MF9588) ML16224B0752016-09-19019 September 2016 NRC Response to Request for Interpretation of Technical Specifications ML16011A2472016-02-17017 February 2016 Issuance of Amendment No. 209 Revision of Technical Specifications for Containment Leak Rate Testing GNRO-2015/00091, Supplemental Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications for Containment Leak Rate Testing/2015-12-10010 December 2015 Supplemental Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications for Containment Leak Rate Testing/ GNRO-2015/00077, Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF) TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours.2015-11-24024 November 2015 Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF) TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours. RBG-47626, ISFSI - Correction of Technical Specification Typographical Errors2015-10-27027 October 2015 ISFSI - Correction of Technical Specification Typographical Errors ML15195A0612015-09-21021 September 2015 Issuance of Amendment No. 188 Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation GNRO-2015/00037, Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing2015-09-15015 September 2015 Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing ML15229A2192015-08-31031 August 2015 Redacted, Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus License Amendment Request ML15195A3552015-08-31031 August 2015 Issuance of Amendment Request for Changing Five Technical Specifications Allowable Values ML15180A1702015-08-31031 August 2015 Issuance of Amendment Revision to Technical Specification 5.65.B to Add Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density ML15229A2182015-08-18018 August 2015 Redacted, Issuance of Amendment Adoption of Single Fluence Methodology ML15229A2132015-08-18018 August 2015 Redacted, Issuance of Amendment Regarding Technical Specification 2.1.1.2 of Technical Specification Section 2.1.1.2, Reactor SLs (Safety Limits) ML15138A4402015-08-14014 August 2015 Orders Approving Transfer of Facility Operating Licenses and Indirect Transfer, Draft Conforming Amendment, and Safety Evaluation GNRO-2015/00059, Submits Corrected Technical Specification Pages Regarding Maximum Extended Load Line Limit Plus License Amendment Request, Dated 9/25/20132015-08-14014 August 2015 Submits Corrected Technical Specification Pages Regarding Maximum Extended Load Line Limit Plus License Amendment Request, Dated 9/25/2013 RBG-47600, Request for Interpretation of Technical Specifications2015-08-0404 August 2015 Request for Interpretation of Technical Specifications ML15187A1272015-07-30030 July 2015 Issuance of Amendment Application for Changes to Technical Specification 3.8.1, AC Sources-Operating ML15117A5752015-06-0202 June 2015 Issuance of Amendment No. 186 Heavy Load Movement Over Fuel Assemblies GNRO-2015/00026, Application to Revise Technical Specifications for Permanent Extension of Type C Leak Rate Testing Frequency and Reduction of Type B and C Grace Intervals2015-05-27027 May 2015 Application to Revise Technical Specifications for Permanent Extension of Type C Leak Rate Testing Frequency and Reduction of Type B and C Grace Intervals ML15104A6232015-05-12012 May 2015 Issuance of Amendment Adoption of Technical Specifications Task Force Standard Technical Specifications Change Traveler TSTF-523 ML14106A1672015-02-27027 February 2015 Issuance of Amendment No. 185, Adopt TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A Using Consolidated Line Item Improvement Process GNRO-2014/00078, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month2014-12-15015 December 2014 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML14311A4792014-12-12012 December 2014 Issuance of Amendment No. 200, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date ML14192A8312014-12-11011 December 2014 Issuance of Amendment No. 182, Revise Technical Specification 2.1.1, Reactor Core Sls, to Reduce Minimum Reactor Dome Pressure Associated with Critical Power Correlation GNRO-2014/00068, License Amendment Request to Revise Technical Specification 2.1.1.22014-11-21021 November 2014 License Amendment Request to Revise Technical Specification 2.1.1.2 ML14162A3782014-09-25025 September 2014 Redacted, Issuance of Amendment No. 199, Delete Operating License Condition 2.C(32), Partial Feedwater Heating, to Allow Plant to Operate with Final Feedwater Temperature Reduction at End of Fuel Cycle ML14106A1332014-06-30030 June 2014 Issuance of Amendment No. 198, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs, as Part of Consolidated Line Item Improvement Process ML14136A0082014-06-18018 June 2014 Issuance of Amendment No. 181, Revise Technical Specification 3.8.4, DC Sources - Operating SRs 3.8.4.2 and 3.8.4.5 to Add Acceptance Criteria to Address Non-conservative Conditions ML13322A4292014-03-0505 March 2014 Issuance of Amendment No. 180, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs Consolidated Line Item Improvement Process ML13343A1092013-12-26026 December 2013 Issuance of Amendment No. 197, Revise Technical Specifications and Surveillance Requirements to Support Operation with 24-Month Fuel Cycle in Accordance with Generic Letter 91-04 RBG-47380, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases2013-07-25025 July 2013 Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases RBG-47350, License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs2013-05-28028 May 2013 License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs RBG-47345, Supplement to License Amendment Request 2011-052013-03-0808 March 2013 Supplement to License Amendment Request 2011-05 CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications GNRO-2012/00132, License Amendment Request for Revision of Technical Specification Allowable Value for Primary Containment and Drywell Isolation Instrumentation Function 3.c RCIC Steam Supply Line Pressure - Low.2012-11-0909 November 2012 License Amendment Request for Revision of Technical Specification Allowable Value for Primary Containment and Drywell Isolation Instrumentation Function 3.c RCIC Steam Supply Line Pressure - Low. GNRO-2012/00124, Response to NRC Request for Additional Information - GGNS Criticality Safety Analysis License Amendment Request2012-10-22022 October 2012 Response to NRC Request for Additional Information - GGNS Criticality Safety Analysis License Amendment Request 2023-12-14
[Table view] |
Text
December 28, 2022 Mr. Ron Gaston Vice President, Regulatory Assurance Licensing Entergy Services, LLC M-ECH-29 1340 Echelon Parkway Jackson, MS 39213
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1 AND RIVER BEND STATION, UNIT 1 - ISSUANCE OF AMENDMENTS RE: ADOPTION TSTF-580, PROVIDE EXCEPTION FROM ENTERING MODE 4 WITH NO OPERABLE RHR SHUTDOWN COOLING, REVISION 1 (EPID L-2022-LLA-0080)
Dear Mr. Gaston:
The U.S. Nuclear Regulatory Commission has issued amendments consisting of changes to the Technical Specifications (TSs) in response to your application dated May 26, 2022. The following amendments are enclosed:
Amendment No. 232 to Renewed Facility Operating License No. NPF-29 for Grand Gulf Nuclear Station, Unit 1 (Grand Gulf);
Amendment No. 212 to Renewed Facility Operating License No. NPF-47 for River Bend Station, Unit 1 (River Bend);
The amendments would revise Grand Gulf and River Bend TS 3.4.9, Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown, in accordance with Technical Specifications Task Force (TSTF) Traveler TSTF-580, Revision 1, Provide Exception from Entering Mode 4 With No Operable RHR Shutdown Cooling. Specifically, the proposed changes provide a TS exception to entering Mode 4 if both RHR shutdown cooling subsystems are inoperable.
R. Gaston A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions Federal Register notice.
Sincerely,
/RA/
Jason J. Drake, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-416 and 50-458
Enclosures:
- 1. Amendment No. 232 to NPF-29
- 2. Amendment No. 212 to NPF-47
- 3. Safety Evaluation
- 4. Notices and Environmental Findings cc: Listserv
ENTERGY OPERATIONS, INC.
SYSTEM ENERGY RESOURCES, INC.
COOPERATIVE ENERGY, A MISSISSIPPI ELECTRIC COOPERATIVE ENTERGY MISSISSIPPI, LLC DOCKET NO. 50-416 GRAND GULF NUCLEAR STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 232 Renewed License No. NPF-29
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Entergy Operations, Inc. (the licensee), dated May 26, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-29 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 232 are hereby incorporated into this renewed license. Entergy Operations, Inc. shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 90 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by William William T. T. Orders Date: 2022.12.28 Orders 13:47:22 -05'00' Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to Renewed Facility Operating License No. NPF-29 and the Technical Specifications Date of Issuance: December 28, 2022
ATTACHMENT TO LICENSE AMENDMENT NO. 232 RENEWED FACILITY OPERATING LICENSE NO. NPF-29 GRAND GULF NUCLEAR STATION, UNIT 1 DOCKET NO. 50-416 Replace the following page of Renewed Facility Operating License No. NPF-29 and the Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Facility Operating License REMOVE INSERT Technical Specifications REMOVE INSERT 3.4-21 3.4-21 3.4-22 3.4-22
3.4-22A
amended, are fully applicable to the lessors and any successors in interest to those lessors, as long as the renewed license of GGNS Unit 1 remains in effect.
(b) SERI is required to notify the NRC in writing prior to any change in (i) the terms or conditions of any new or existing sale or lease agreements executed as part of the above authorized financial transactions, (ii) the GGNS Unit 1 operating agreement, (iii) the existing property insurance coverage for GGNS Unit 1 that would materially alter the representations and conditions set forth in the Staff's Safety Evaluation Report dated December 19, 1988 attached to Amendment No. 54. In addition, SERI is required to notify the NRC of any action by a lessor or other successor in interest to SERI that may have an effect on the operation of the facility.
C. The renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level Entergy Operations, Inc. is authorized to operate the facility at reactor core power levels not in excess of 4408 megawatts thermal (100 percent power) in accordance with the conditions specified herein.
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 232 are hereby incorporated into this renewed license. Entergy Operations, Inc. shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
During Cycle 19, GGNS will conduct monitoring of the Oscillation Power Range Monitor (OPRM). During this time, the OPRM Upscale function (Function 2.f of Technical Specification Table 3.3.1.1-1) will be disabled and operated in an indicate only mode and technical specification requirements will not apply to this function. During such time, Backup Stability Protection measures will be implemented via GGNS procedures to provide an alternate method to detect and suppress reactor core thermal hydraulic instability oscillations. Once monitoring has been successfully completed, the OPRM Upscale function will be enabled and technical specification requirements will be applied to the function; no further operating with this function in an indicate only mode will be conducted.
4 Amendment No. 232
RHR Shutdown Cooling System Hot Shutdown 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 Residual Heat Removal (RHR) Shutdown Cooling System Hot Shutdown LCO 3.4.9 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.
NOTES------------------------------------------------
Both RHR shutdown cooling subsystems and recirculation pumps may not be in operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
One RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for performance of Surveillances.
APPLICABILITY: MODE 3 with reactor steam dome pressure less than the RHR cut in permissive pressure.
ACTIONS
NOTE----------------------------------------------------------
Separate Condition entry is allowed for each RHR shutdown cooling subsystem.
CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR shutdown cooling A.1 Verify an alternate 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> subsystem inoperable. method of decay heat removal is available. AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter (continued)
GRAND GULF 3.4-21 Amendment No. 142,, 225
RHR Shutdown Cooling System Hot Shutdown 3.4.9 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. Required Action and B.1 Initiate action to restore Immediately associated Completion RHR shutdown cooling Time of Condition A not subsystem to met. OPERABLE status.
C. Two RHR shutdown C.1 Verify an alternate 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> cooling subsystems method of decay heat AND inoperable. removal is available for each inoperable Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> RHR shutdown cooling thereafter subsystem.
NOTE-----------------
D. Required Action and LCO 3.0.3 and all other LCO associatedCompletion Required Actions requiring a MODE Time of Condition C not change to MODE 4 may be met.
suspended until one RHR shutdown cooling subsystem is restored to OPERABLE status.
D.1 Initiate action to restore Immediately one RHR shutdown cooling subsystem to OPERABLE status.
(continued)
GRAND GULF 3.4-22 Amendment No.
RHR Shutdown Cooling System Hot Shutdown 3.4.9 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. No RHR shutdown cooling E.1 Initiate action to restore Immediately subsystem in operation. one RHR shutdown cooling subsystem or one AND recirculation pump to operation.
No recirculation pump in operation. AND E.2 Verify reactor coolant 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery circulation by an of no reactor coolant alternate method. circulation AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND E.3 Monitor reactor coolant Once per hour temperature and pressure.
GRAND GULF 3.4-2$ Amendment No.
ENTERGY LOUISIANA, LLC AND ENTERGY OPERATIONS, INC.
DOCKET NO. 50-458 RIVER BEND STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 212 Renewed License No. NPF-47
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Entergy Operations, Inc. (EOI, the licensee),
dated May 26, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 2
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-47 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 212 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. The license amendment is effective as of its date of issuance and shall be implemented within 90 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by William T. William T. Orders Date: 2022.12.28 Orders 14:23:04 -05'00' Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to Renewed Facility Operating License No. NPF-47 and the Technical Specifications Date of Issuance: December 28, 2022
ATTACHMENT TO LICENSE AMENDMENT NO. 212 RENEWED FACILITY OPERATING LICENSE NO. NPF-47 RIVER BEND STATION, UNIT 1 DOCKET NO. 50-458 Replace the following pages of Renewed Facility Operating License No. NPF-47 and the Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by Amendment number and contain marginal lines indicating the areas of change.
Facility Operating License Remove Insert Technical Specifications Remove Insert 3.4-22 3.4-22 3.4-23 3.4-23
3.4-23A
(2) EOI, pursuant to Section 103 of the Act and 10 CFR Part 50, to possess, use and operate the facility at the above designated location in accordance with the procedures and limitations set forth in this renewed license; (3) EOI, pursuant to Section 103 of the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) EOI, pursuant to Section 103 of the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) EOI, pursuant to Section 103 of the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) EOI, pursuant to Section 103 of the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
(7) EOI, pursuant to the Act and 10 CFR Part 30, 40, and 70 to receive, possess and use, in amounts as required, such byproduct and special nuclear materials as may be produced by the operation of Arkansas Nuclear One, Units 1 and 2, Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit 3, without restriction to chemical or physical form for the purposes of sample analysis, equipment calibration, or equipment repair.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level EOI is authorized to operate the facility at reactor core power levels not in excess of 3091 megawatts thermal (100% rated power) in accordance with the conditions specified herein.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 212 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Amendment No. 212
RHR Shutdown Cooling System - Hot Shutdown 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 Residual Heat Removal (RHR) Shutdown Cooling SystemHot Shutdown LCO 3.4.9 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.
NOTES--------------------------------------------
- 1. Both RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
- 2. One RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for performance of Surveillances.
APPLICABILITY: MODE 3 with reactor steam dome pressure less than the RHR cut in permissive pressure.
ACTIONS
NOTE---------------------------------------------------------------
Separate Condition entry is allowed for each RHR shutdown cooling subsystem.
CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR shutdown A.1 Verify an alternate 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> cooling subsystem method of decay heat inoperable. removal is available. AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter (continued)
RIVER BEND 3.4-22 Amendment No. 81, 156, 204, 212
RHR Shutdown Cooling System - Hot Shutdown 3.4.9 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. Required Action and B.1 Initiate action to restore Immediately associated Completion RHR shutdown cooling Time of Condition A not subsystem to met. OPERABLE status.
C. Two RHR shutdown C.1 Verify an alternate 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> cooling subsystems method of decay heat inoperable. removal is available for AND each inoperable RHR shutdown cooling Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> subsystem. thereafter D. Required Action and --------------------NOTE-----------------
associated Completion LCO 3.0.3 and all other LCO Time of Condition C not Required Actions requiring a met. MODE change to MODE 4 may be suspended until one RHR shutdown cooling subsystem is restored to OPERABLE status.
D.1 Initiate action to restore Immediately one RHR shutdown cooling subsystem to OPERABLE status.
(continued)
RIVER BEND 3.4-23 Amendment No. 81, 204, 212
RHR Shutdown Cooling System - Hot Shutdown 3.4.9 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME E. No RHR shutdown cooling E.1 Initiate action to restore Immediately subsystem in operation. one RHR shutdown cooling subsystem or AND one recirculation pump to operation.
No recirculation pump in operation. AND E.2 Verify reactor coolant 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from circulation by an discovery of no alternate method. reactor coolant circulation AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND E.3 Monitor reactor coolant Once per hour temperature and pressure.
RIVER BEND 3.4-23A Amendment No. 212
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 232 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-29 AND AMENDMENT NO. 212 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-47 ENTERGY OPERATIONS, INC.
GRAND GULF NUCLEAR STATION, UNIT 1 RIVER BEND STATION, UNIT 1 DOCKET NOS. 50-416 AND 50-458 Application (i.e., initial and supplements) Safety Evaluation Date May 26, 2022, ML22146A189 December 28, 2022 Principal Contributors to Safety Evaluation Ravi Grover, NRR/DSS/STSB
1.0 PROPOSED CHANGE
S Entergy Operations, Inc. (Entergy, the licensee) requested changes to the technical specifications (TSs) for Grand Gulf Nuclear Station, Unit 1 (Grand Gulf) and River Bend Station, Unit 1 (River Bend) by license amendment request (LAR, application) dated May 26, 2022. In its application, the licensee requested that the U.S. Nuclear Regulatory Commission (NRC, the Commission) process the proposed amendments under the Consolidated Line Item Improvement Process (CLIIP). The proposed changes would revise the Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown, TS based on Technical Specifications Task Force (TSTF) Traveler TSTF-580, Revision 1, Provide Exception from Entering Mode 4 With No Operable RHR Shutdown Cooling (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21025A232), and the associated NRC staff safety evaluation (SE) for TSTF-580 (ML21188A227).
Irradiated fuel in the shutdown reactor core generates heat during the decay of fission products and increases the temperature of the reactor coolant. This decay heat must be removed to reduce the temperature of the reactor coolant to less than or equal to 212 degrees Fahrenheit.
This decay heat is removed by the RHR shutdown cooling system in preparation for performing refueling or maintenance operations, or for keeping the reactor in the hot shutdown condition or cold shutdown condition.
The reactor coolant system design for Grand Gulf and River Bend consists of two redundant, manually controlled shutdown cooling subsystems of the RHR system to provide decay heat removal. Each loop consists of motor-driven pumps, a heat exchanger, and associated piping Enclosure 3
and valves. The RHR heat exchangers transfer heat to the RHR service water system. Some piping and heat exchangers that are passive components may be common to both subsystems.
The Grand Gulf and River Bend TS 3.4.9, Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown, is applicable in Mode 3, with the reactor steam dome pressure less than the RHR shutdown cooling isolation pressure. The limiting condition for operation (LCO) requires two operable RHR shutdown cooling subsystems and, if no recirculation pump is in operation, then at least one RHR shutdown cooling subsystem needs to be in operation.
1.1 Proposed TS Changes to Adopt TSTF-580 In accordance with NRC staff approved TSTF-580, the licensee proposed changes that would revise TS 3.4.9, for Grand Gulf and River Bend. Specifically, the licensee proposed the following changes to adopt TSTF-580:
Condition A is changed to be limited to a single inoperable subsystem by revising it to state: One RHR shutdown cooling subsystem inoperable with a Required Action to Verify an alternate method of decay heat removal is available.
Condition B addresses situations when Required Action A.1 and associated completion time (CT) are not met. The plural (s) is deleted in Required Action B.1 as a conforming change to Condition A, which now addresses a single inoperable RHR shutdown cooling subsystem.
A new Condition C is added, which addresses two RHR shutdown cooling subsystems inoperable with a Required Action C.1 to verify an alternate method of decay heat removal is available for each inoperable RHR shutdown cooling subsystem. The new Condition C Required Action has a CT of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter.
A new Condition D is added to address situations when new Required Action C.1 and associated CT are not met. New Required Action D.1 requires action be initiated to restore one RHR shutdown cooling subsystem to operable status immediately. Required Action D.1 is modified by a note that states that LCO 3.0.3 and all other LCO Required Actions requiring a mode change to Mode 4 may be suspended until one RHR shutdown cooling subsystem is restored to operable status.
Existing Condition C and associated Required Actions are renumbered as Condition E due to the new Conditions C and D.
1.2 Additional Proposed TS Changes The application states that Entergy is not proposing any variations from the TS changes described in TSTF-580 or the applicable parts of the NRC SE dated July 11, 2021.
2.0 REGULATORY EVALUATION
The regulation at paragraph 50.36(c)(2) of Title 10 of the Code of Federal Regulations (10 CFR) requires that TSs include LCOs. Per 10 CFR 50.36(c)(2)(i), LCOs are the lowest functional capability or performance levels of equipment required for safe operation of the facility. The regulation also requires that when an LCO of a nuclear reactor is not met, the licensee shall
shut down the reactor or follow any remedial action permitted by the TSs until the condition can be met.
The NRC staffs guidance for the review of TSs is in Chapter 16.0, Technical Specifications, of NUREG-0800, Revision 3, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR [Light-Water Reactor] Edition (SRP), March 2010 (ADAMS Accession No. ML100351425). As described therein, as part of the regulatory standardization effort, the NRC staff has prepared Standard TSs (STSs) for each of the LWR nuclear designs.
Accordingly, the NRC staffs review includes consideration of whether the proposed changes are consistent with the STSs, as modified by NRC approved travelers.
Traveler TSTF-580 revised the STSs related to RHR shutdown cooling system. The NRC approved TSTF-580 under the CLIIP on July 11, 2021 (ADAMS Package Accession No. ML21188A283).
3.0 TECHNICAL EVALUATION
3.1 Proposed TS Changes to Adopt TSTF-580 The NRC staff compared the licensees proposed TS changes in section 1.1 of this SE against the changes approved in TSTF-580. In accordance with the SRP, chapter 16.0, the NRC staff determined that the STS changes approved in TSTF-580 are applicable because the Grand Gulf and River Bend units are boiling-water reactor (BWR) design plants, and the NRC staff approved the TSTF-580 changes for BWR designs. The NRC staff finds that the licensees proposed changes to the Grand Gulf and River Bend TSs in section 1.1 of this SE are consistent with those found acceptable in TSTF-580.
In the SE of TSTF-580, the NRC staff concluded that TSTF-580 changes to STS 3.4.9, Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown, Condition A, Required Actions A.1 and B.1, and new Condition C, Required Action C.1 and associated CTs were acceptable because these changes preserve the existing requirements and do not alter the way the TSs are implemented. Therefore, the NRC staff finds these continue to meet the requirements of 10 CFR 50.36(c)(2)(i) by providing remedial actions for when the LCO is not met.
The NRC staff also concluded that the TSTF-580 proposed addition of new Condition D to STS 3.4.9 is acceptable, because, without an operable RHR shutdown cooling subsystem and in a period of high decay heat load, it may not be possible to reduce the RCS temperature to the Mode 4 entry condition within the CT. Under this condition, remaining in Mode 3 allows fission product decay heat and other residual heat from the reactor core to be transferred at a rate such that specified acceptable fuel design limits and the design conditions of the reactor coolant pressure boundary will not be exceeded. The CT reflects the importance of restoring a normal path for heat removal. The NRC staff finds that proposed new Condition D and associated Required Action D.1 and the CT, are acceptable because they provide appropriate remedial actions if the LCO is not met and, therefore, continue to meet the requirements of 10 CFR 50.36(c)(2)(i).
3.2 Conclusion The NRC staff finds that the proposed changes to Grand Gulf and River Bend TS LCO 3.4.9 are acceptable because the remedial actions continue to be required when the LCO is not met and
provide adequate protection of the health and safety of the public. Thus, the proposed changes continue to meet the requirements of 10 CFR 50.36(c)(2)(i) as discussed in section 3.0 of the NRC staffs SE for TSTF-580.
3.3 TS Change Consistency The NRC staff reviewed the proposed TS changes for technical clarity and consistency with the existing requirements for customary terminology and formatting. The NRC staff finds that the proposed changes are consistent with Chapter 16.0 of the SRP and are therefore acceptable.
4.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
NOTICES AND ENVIRONMENTAL FINDINGS RELATED TO AMENDMENT NO. 232 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-29 AND AMENDMENT NO. 212 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-47 ENTERGY OPERATIONS, INC.
GRAND GULF NUCLEAR STATION, UNIT 1 RIVER BEND STATION, UNIT 1 DOCKET NOS. 50-416 AND 50-458 Application (i.e., initial and supplements) Safety Evaluation Date May 26, 2022, ML22146A189 December 28, 2022
1.0 INTRODUCTION
Entergy Operations, Inc. (Entergy, the licensee) requested changes to the technical specifications (TSs) for Grand Gulf Nuclear Station, Unit 1 (Grand Gulf) and River Bend Station, Unit 1 (River Bend) by license amendment request (LAR, application), dated May 26, 2022. In its application, the licensee requested that the U.S. Nuclear Regulatory Commission (NRC, the Commission) process the proposed amendments under the Consolidated Line Item Improvement Process (CLIIP). The proposed changes would revise the Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown, TS based on Technical Specifications Task Force (TSTF) Traveler TSTF-580, Revision 1, Provide Exception from Entering Mode 4 With No Operable RHR Shutdown Cooling (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21025A232), and the associated NRC staff safety evaluation (SE) for TSTF-580 (ML21188A227).
2.0 STATE CONSULTATION
In accordance with the Commissions regulations, State officials for Mississippi and Louisiana were notified of the proposed issuance of the amendment on December 22, 2022. The State officials had no comments.
3.0 ENVIRONMENTAL CONSIDERATION
The amendments change requirements with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change Enclosure 4
in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, published in the Federal Register on July 15, 2022 (87 FR 42509), and there has been no public comment on such finding. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
ML22342B280 *by email OFFICE NRR/DORL/LPL4/PM* NRR/DORL/LPL4/LA* NRR/DSS/STSB/BC* OGC*
NAME JDrake PBlechman VCusumano STurk DATE 12/1/22 12/8/22 10/31/22 12/14/22 OFFICE NRR/DORL/LPL4/BC* NRR/DORL/LPL/PM*
NAME JDixon-Herrity (WOrders for) JDrake DATE 12/28/22 12/28/22