Letter Sequence Approval |
---|
EPID:L-2018-LLA-0029, Request for Review and Approval of Relocation of the Reactor Core Isolation Cooling (RCIC) Injection Point from the Reactor Vessel Head Spray Nozzle to the 'A' Feedwater Line Via the 'A' Residual Heat Removal (RHR) Shutdown Cooling (Approved, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARIR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 IR 05000458/20240032024-10-31031 October 2024 Integrated Inspection Report 05000458/2024003 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24066A1802024-03-0707 March 2024 Notification of NRC Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 ML24031A0042024-02-21021 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0052 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000458/LER-2023-006, Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard2024-02-0808 February 2024 Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20230042024-01-30030 January 2024 Integrated Inspection Report 05000458/2023004 IR 05000458/20230402024-01-18018 January 2024 – 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter 05000458/LER-2023-005, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-01-16016 January 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) 05000458/LER-2023-004, Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure2023-12-28028 December 2023 Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment 2024-09-24
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22188A1742022-07-19019 July 2022 Issuance of Amendment No. 211 Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22026A4892022-03-22022 March 2022 Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary ML21162A2112021-07-0202 July 2021 Issuance of Amendment No. 208 to Adopt Generic Letter 86-10 Standard License Condition for Fire Protection ML21146A0182021-06-0808 June 2021 Issuance of Amendments to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML21040A2922021-03-0404 March 2021 Issuance of Amendments Adoption of TSTF 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21011A0682021-02-0202 February 2021 Issuance of Amendments Adoption of TSTF 439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20339A5182021-01-0606 January 2021 Issuance of Amendment No. 203 Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20244A0112020-09-28028 September 2020 Issuance of Amendment No. 202 Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- RITSTF Initiative 5b ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19071A2992019-06-19019 June 2019 Issuance of Amendment No. 198 Removal of Table of Contents from Renewed Operating License Technical Specifications ML19066A0082019-04-29029 April 2019 Issuance of Amendment Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3 ML18360A0252019-01-17017 January 2019 Redacted Version - Issuance of Amendment No. 195 Correction of a Non-Conservative Technical Specification for Pressure-Temperature Limits ML18345A3422018-12-21021 December 2018 Issuance of Amendment No. 194 Relocation of the Reactor Core Isolation Cooling Injection Point to the a Feedwater Line ML18284A3692018-12-20020 December 2018 Renewed Facility Operating License NPF-47 ML18267A3412018-11-0707 November 2018 Issuance of Amendment No. 193 Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML16287A5992016-10-27027 October 2016 Issuance of Amendment No. 191, Revise Technical Specifications for Extension of Containment Leakage Tests Frequency ML16124A6882016-06-21021 June 2016 Issuance of Amendment No. 190 Cyber Security Plan Implementation Schedule ML15265A1162015-10-0101 October 2015 Issuance of Conforming Amendment to Reflect the Transfer of the Facility Operating License No. NPF-47 from Entergy Gulf States Louisiana, LLC to Entergy Louisiana, LLC ML15195A0612015-09-21021 September 2015 Issuance of Amendment No. 188 Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML15187A1272015-07-30030 July 2015 Issuance of Amendment Application for Changes to Technical Specification 3.8.1, AC Sources-Operating ML15117A5752015-06-0202 June 2015 Issuance of Amendment No. 186 Heavy Load Movement Over Fuel Assemblies ML15071A4752015-03-19019 March 2015 Correction to License Amendment No. 185 Adoption of TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A ML14106A1672015-02-27027 February 2015 Issuance of Amendment No. 185, Adopt TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A Using Consolidated Line Item Improvement Process ML14225A4442014-12-12012 December 2014 Issuance of Amendment No. 183, Revise Technical Specification Surveillance Requirements Related to Ventilation Filter Testing Program for Heaters in Safety-Related Charcoal Filter Trains ML14304A1812014-12-12012 December 2014 Issuance of Amendment No. 184, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date ML14192A8312014-12-11011 December 2014 Issuance of Amendment No. 182, Revise Technical Specification 2.1.1, Reactor Core Sls, to Reduce Minimum Reactor Dome Pressure Associated with Critical Power Correlation ML14136A0082014-06-18018 June 2014 Issuance of Amendment No. 181, Revise Technical Specification 3.8.4, DC Sources - Operating SRs 3.8.4.2 and 3.8.4.5 to Add Acceptance Criteria to Address Non-conservative Conditions ML13322A4292014-03-0505 March 2014 Issuance of Amendment No. 180, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs Consolidated Line Item Improvement Process ML13060A2102013-03-29029 March 2013 Issuance of Amendment No. 179, Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of Surveillance Requirement 3.3.8.1.3 and Revise Allowable Values of Certain Functions ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML12261A4722012-12-0505 December 2012 Issuance of Amendment No. 177, Revise Physical Protection License Condition Related to Milestone No. 6 of the Cyber Security Plan Implementation ML12277A3082012-12-0505 December 2012 Issuance of Amendment No. 176, Revise Technical Specification 3.8.1, AC Sources - Operating for Testing of Automatic Transfer Function to Offsite Power for Division III Bus ML12240A1802012-09-24024 September 2012 Issuance of Amendment No. 175, Emergency Plan Change to Relocate Alternate Emergency Operations Facility from 23 to 28 Miles from the Technical Support Center ML1210705572012-05-30030 May 2012 Issuance of Amendment No. 174, Revise Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, for Main Steam Tunnel Temperature Function Setpoints ML1200902422012-02-0808 February 2012 Issuance of Amendment No. 173, Adopt Technical Specification Task Force (TSTF)-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML1124303342011-11-21021 November 2011 Issuance of Amendment No. 172, Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML1119402002011-07-29029 July 2011 Issuance of Amendment No. 171, Add License Condition and Approval of Cyber Security Plan and Associated Implementation Schedule ML1027901222011-01-0505 January 2011 Issuance of Amendment No. 170, Revise LCO 3.10.1, Inservice Leak and Hydrostatic Testing Operation, Consistent with TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML1026405472010-10-21021 October 2010 Issuance of Amendment No. 169, Change to Emergency Plan Table 13.3-17, Repair and Corrective Actions to Modify Positions of On-Shift Personnel ML1023502662010-08-31031 August 2010 Issuance of Amendment No. 168, Modify Technical Specification Surveillance Requirement Frequencies from 18- to 24-Month Fuel Cycle Intervals ML1002003142010-03-31031 March 2010 License Amendment, Revise Technical Specification 5.5.6, Inservice Testing Program, to Incorporate References to ASME Code for Operation and Maintenance of Nuclear Power Plants ML0924301452009-09-29029 September 2009 Issuance of Amendment No. 166, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), to Add Reference to Analytical Method ML0920103702009-08-11011 August 2009 License Amendment No. 165, Modify Technical Specifications to Adopt NRC-approved Generic Changes TS Task Force (TSTF)-163, TSTF-220, TSTF-230, and TSTF-306 2024-08-13
[Table view] Category:Safety Evaluation
MONTHYEARML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22265A1802022-09-27027 September 2022 Proposed Alternative to the Requirements of ASME Code of Operation and Maintenance of Nuclear Power Plants for Pressure Isolation Valve Testing Frequency ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22026A4892022-03-22022 March 2022 Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary ML22007A3172022-01-18018 January 2022 1, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML21258A4082021-09-21021 September 2021 Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of Boiling Water Reactor Vessel and Internals Project Guidelines ML21162A2112021-07-0202 July 2021 Issuance of Amendment No. 208 to Adopt Generic Letter 86-10 Standard License Condition for Fire Protection ML21146A0182021-06-0808 June 2021 Issuance of Amendments to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML21040A2922021-03-0404 March 2021 Issuance of Amendments Adoption of TSTF 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21011A0682021-02-0202 February 2021 Issuance of Amendments Adoption of TSTF 439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20339A5182021-01-0606 January 2021 Issuance of Amendment No. 203 Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20244A0112020-09-28028 September 2020 Issuance of Amendment No. 202 Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- RITSTF Initiative 5b ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19071A2992019-06-19019 June 2019 Issuance of Amendment No. 198 Removal of Table of Contents from Renewed Operating License Technical Specifications ML19066A0082019-04-29029 April 2019 Issuance of Amendment Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3 ML18360A0252019-01-17017 January 2019 Redacted Version - Issuance of Amendment No. 195 Correction of a Non-Conservative Technical Specification for Pressure-Temperature Limits ML18345A3422018-12-21021 December 2018 Issuance of Amendment No. 194 Relocation of the Reactor Core Isolation Cooling Injection Point to the a Feedwater Line ML18310A0132018-11-16016 November 2018 Relief from the Requirements of the ASME Code to Use Boiling Water Reactor Vessel Internals Guidelines as an Alternative ML18267A3412018-11-0707 November 2018 Issuance of Amendment No. 193 Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18299A2732018-11-0707 November 2018 Request for Relief from Requirements of Asme Code RBS-ISI-016 from the Requirements of the ASME Code for Pressure Retaining Welds in Control Rod Housings (EPID-L-2018-LLR-0042) ML18212A1512018-07-31031 July 2018 License Renewal Safety Evaluation Report ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML17138A1442017-05-24024 May 2017 Relief from the Requirements of the ASME Code ML16287A5992016-10-27027 October 2016 Issuance of Amendment No. 191, Revise Technical Specifications for Extension of Containment Leakage Tests Frequency ML16251A6202016-09-13013 September 2016 Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) ML15292A5082016-08-11011 August 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16124A6882016-06-21021 June 2016 Issuance of Amendment No. 190 Cyber Security Plan Implementation Schedule ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16093A0282016-05-31031 May 2016 Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 ML15195A0612015-09-21021 September 2015 Issuance of Amendment No. 188 Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML15138A4402015-08-14014 August 2015 Orders Approving Transfer of Facility Operating Licenses and Indirect Transfer, Draft Conforming Amendment, and Safety Evaluation ML15187A1272015-07-30030 July 2015 Issuance of Amendment Application for Changes to Technical Specification 3.8.1, AC Sources-Operating ML15156A8602015-06-30030 June 2015 Safety Evaluation Input - Regarding Application for Change to Technical Specifications 3.8.1, AC Sources - Operating ML15117A5752015-06-0202 June 2015 Issuance of Amendment No. 186 Heavy Load Movement Over Fuel Assemblies ML15114A3512015-05-0404 May 2015 Correction to Relief Request No. VRR-RBS-2014-1 Regarding the Third 10-Year Inservice Testing Interval ML15071A1412015-03-23023 March 2015 Relief Request No. VRR-RBS-2014-1 Regarding the Third 10-Year Inservice Testing Interval ML15071A4752015-03-19019 March 2015 Correction to License Amendment No. 185 Adoption of TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A ML14106A1672015-02-27027 February 2015 Issuance of Amendment No. 185, Adopt TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A Using Consolidated Line Item Improvement Process ML13350A1612015-02-10010 February 2015 Correction to Safety Evaluation Related to Amendment No. 168 Which Modified Techical Specification Surveillance Requirement Frequencies from 18- to 24-Month Fuel Cycle Intervals; Enclosed New SE Section 3.1.7B ML14304A1812014-12-12012 December 2014 Issuance of Amendment No. 184, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date 2024-08-13
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 21, 2018 Vice President, Operations Entergy Operations, Inc.
River Bend Station 5485 US Highway 61 St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION, UNIT 1 - ISSUANCE OF AMENDMENT RE:
RELOCATION OF THE REACTOR CORE ISOLATION COOLING INJECTION POINT TO THE 'A' FEEDWATER LINE (EPID L-2018-LLA-0029)
Dear Sir or Madam:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 194 to Facility Operating License No. NPF-47 for the River Bend Station, Unit 1 (RBS). The amendment consists of changes to the RBS Updated Safety Analysis Report (USAR) in response to your application dated January 29, 2018, as supplemented by letters dated June 21, August 15, and November 13, 2018.
The amendment revises the USAR to reflect the relocation of the reactor core isolation cooling injection point from the reactor vessel head spray nozzle to the 'A' Feedwater line via the 'A' Residual Heat Removal shutdown cooling return line.
A copy of the related safety evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Lisa M. Regner, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458
Enclosures:
- 1. Amendment No. 194 to NPF-47
- 2. Safety Evaluation cc w/enclosures: Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 ENTERGY LOUISIANA LLC AND ENTERGY OPERATIONS, INC.
DOCKET NO. 50-458 RIVER BEND STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 194 License No. NPF-47
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Entergy Operations, Inc. (EOI), dated January 29, 2018, as supplemented by letters dated June 21, August 15, and November 13, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I;
- 8. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, by Amendment No. 194, Facility Operating License No. NPF-47 is hereby amended to authorize revision to the River Bend Station, Unit 1, Updated Safety Analysis Report (USAR), as set forth in the application dated January 29, 2018, as supplemented by letters dated June 21, August 15, and November 13, 2018, and evaluated in the NRC staff's evaluation enclosed with this amendment.
- 3. The license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance. The USAR changes shall be implemented in the next periodic update to the USAR in accordance with 10 CFR 50.71(e).
FOR THE NUCLEAR REGULATORY COMMISSION Robert J. Pascarelli, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Date of Issuance: December 21 , 2 O1 8
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 194 TO FACILITY OPERATING LICENSE NO. NPF-47 ENTERGY OPERATIONS, INC.
RIVER BEND STATION, UNIT 1 DOCKET NO. 50-458
1.0 INTRODUCTION
By application dated January 29, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18029A187), as supplemented by letters dated June 21, August 15, and November 13, 2018 (ADAMS Accession Nos. ML18172A142, ML18228A619, and ML18317A392, respectively), Entergy Operations, Inc. (Entergy or the licensee) requested approval of a revision to the Updated Safety Analysis Report (USAR) for Facility Operating License No. NPF-47 for River Bend Station, Unit 1 (RBS).
The proposed changes would revise the RBS USAR to reflect the relocation of the reactor core isolation cooling (RCIC) injection point from the reactor vessel head spray nozzle to the
'A' Feedwater line via the 'A' Residual Heat Removal (RHR) shutdown cooling return line.
The supplemental letters dated June 21, August 15, and November 13, 2018, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the U.S. Nuclear Regulatory Commission (NRC or the Commission) staff's original proposed no significant hazards consideration determination as published in the Federal Register on May 22, 2018 (83 FR 23732).
2.0 REGULATORY EVALUATION
2.1 Background On July 3, 1999, the licensee implemented a design change to the RCIC at RBS. The portion of the design change relevant to this amendment request is the relocation of the RCIC injection point from the reactor vessel head spray nozzle to the 'A' Feedwater line via the 'A' RHR shutdown cooling return line. The change was originally evaluated by the licensee under Title 1O of the Code of Federal Regulations (1 O CFR) Section 50.59, "Changes, tests, and experiments."
Enclosure 2
In October 2015, during the 10 CFR 50.59 and Permanent Plant Modification Inspection by the NRC, the inspector identified a deficiency in the 10 CFR 50.59 evaluation performed in 1998 to support the relocation of the RCIC injection point from the reactor vessel head spray nozzle to the 'A' Feedwater line via the 'A' RHR shutdown cooling return line. Specifically, the inspector found that this plant design change had increased the probability of a loss of feedwater heating (LOFH) accident by more than a minimal amount and was made without requesting prior NRC approval in violation of 10 CFR 50.59 requirements. Therefore, the NRC issued to the licensee a non-cited violation of 10 CFR 50.59 for failure to obtain a license amendment. The NRC inspection report dated June 9, 2017 (ADAMS Accession No. ML17160A401), stated that, because the licensee had failed to restore compliance (i.e., obtain a license amendment pursuant to 10 CFR 50.90) within a reasonable amount of time after the violation was initially identified, the violation had become a cited violation.
Subsequently, the licensee requested an amendment to relocate the RCIC injection point from the reactor vessel head spray nozzle to the 'A' Feedwater line via the 'A' RHR shutdown cooling return line. In its application dated January 29, 2018, the licensee provided that there were two purposes for the reroute:
- 1. Based on a May 5, 1987, General Electric (GE) (now, General Electric Hitachi}
Potentially Reportable Condition (PRC) related to RCIC injection through the reactor head spray, it was reported that the flow injected through the reactor head spray nozzle by the RCIC system can induce water level measurement errors. The cause of the level errors was determined to be water from the RCIC injection being drawn into the line from the vessel to the condensing chamber resulting in an indicated vessel level higher than the actual vessel level. RBS experienced this phenomenon on one of the four narrow range level instruments during the startup test program when a RCIC injection test was performed at a reactor pressure of 150 pounds per square inch gauge. In the evaluation of the GE PRC, RBS Engineering Analysis evaluated several corrective actions for this phenomenon and recommended that the RCIC injection point be rerouted to the feedwater line.
- 2. To eliminate problems associated with the inboard and outboard containment isolation check valves (E51-AOVF065 and E51-AOVF066). These check valves are containment isolation valves needed for RCIC injection to reactor vessel head spray nozzle and are required to undergo a local leak rate test (LLRT) every refueling outage. The check valves had never passed an as-found LLRT and have been reworked to correct the condition during each refueling outage.
The licensee further stated in the application that an additional benefit of rerouting the RCIC injection point is that the main turbine trip that is initiated when RCIC injects to the vessel would no longer be required. In the previous design, the main turbine was tripped by automatic protective signals on a RCIC initiation to protect the turbine from damage. The trip was to prevent damage to the turbine by RCIC system water that could become entrained in the steam from the reactor to the turbine. With the RCIC system injecting into the feedwater line, carryover from this source was no longer a concern and the main turbine trip was deleted. This eliminated the possibility of a turbine trip and reactor scram should a spurious initiation of RCIC occur.
2.2 Proposed Changes The licensee requested NRC approval of changes to the RBS USAR and Technical Requirements Manual (TRM) describing the relocation of the RCIC injection point from the reactor vessel head spray nozzle to the 'A' Feedwater line via the 'A' RHR shutdown cooling return line. The licensee also provided changes to the TS Bases, a licensee-controlled document. Pursuant to 10 CFR 50.36(a)(1), TS Bases are not part of the technical specifications.
2.3 Regulatory Requirements The regulatory requirements and guidance documents that the NRC staff considered in its review of the proposed amendment included the following:
GDC 10, "Reactor design," which establishes requirements that the reactor core and associated coolant, control, and protection system be designed with appropriate margin to assure that specified acceptable fuel design limits are not exceeded during any condition of normal operation, including the effects of anticipated operational occurrences (AOOs). The LOFH and spurious RCIC injection events are analyzed AOOs in the RBS USAR.
- 10 CFR 50.55a, "Codes and standards," which, in part, establishes the standards required for piping systems, pipe supports, and components. In particular, pursuant to 10 CFR 50.55a(c)(1 ), the reactor coolant pressure boundary components must meet the requirements for Class 1 components in Section Ill of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code. Additionally, pursuant to 10 CFR 50.55a( d)( 1), Quality Group B components must meet the requirements for Class 2 components in Section Ill of the ASME BPV Code.
- NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR [Light-Water Reactor] Edition" (SRP). Relevant sections used for the review of the proposed amendment are as follows:
o Section 5.4.6, "Reactor Core Isolation Cooling System (BWR [Boiling-Water Reactor])," Revision 4, dated March 2007 (ADAMS Accession No. ML070540102).
o Section 3.12, "ASME Code Class 1, 2, and 3 Piping Systems, Piping Components and their Associated Supports," Revision 1, dated April 2014 (ADAMS Accession No. ML14042A513).
o Branch Technical Position (BTP) 3-4, "Postulated Rupture Locations in Fluid System Piping Inside and Outside Containment," Revision 3, dated December 2016 (ADAMS Accession No. ML16085A315).
o Section 15.0, "Introduction - Transient and Accident Analyses," Revision 3, dated March 2007 (ADAMS Accession No. ML070710376).
3.0 TECHNICAL EVALUATION
The RCIC system function is to respond to transient events by providing makeup coolant to the reactor. The RCIC system is designed to operate either automatically or manually following reactor pressure vessel (RPV) isolation accompanied by a loss-of-coolant flow from the feedwater system to provide adequate core cooling and control of RPV water level. Under these conditions, the high pressure core spray (HPCS) and RCIC systems perform similar functions.
The licensee provided the following description of the RCIC system in its application dated January 29, 2018:
The RCIC system consists of a steam driven turbine pump unit, piping, and valves to provide steam to the turbine, as well as piping and valves to transfer water from the suction source to the core. Suction piping is provided from the Condensate Storage Tank (CST) and the suppression pool. Pump suction is normally aligned to the CST to minimize injection of suppression pool water into the RPV. However, if the CST water supply is low, or the suppression pool level is high, an automatic transfer to the suppression pool water source ensures a water supply for continuous operation of the RCIC System. The steam supply to the turbine is piped from main steam line A, upstream of the inboard main steam line isolation valve.
In the application, the licensee stated that three systems were considered that could introduce a cold-water perturbation: RCIC, HPCS, and the feedwater system. The RBS analysis showed that improper startup of HPCS or RCIC events would produce no significant power transients.
These events were considered as Chapter 15.1 events in the USAR, but the licensee analysis demonstrated that they were bounded by the LOFH accident and, therefore, they were not evaluated every refueling outage as Chapter 15.1 events due to the limited power transient.
The licensee stated that the inadvertent initiation of a RCIC event is bounded by the inadvertent HPCS startup event, as discussed in Chapter 15.5.1 of the USAR. Additionally, in the application, the licensee stated that changing the injection point of the RCIC does not increase the probability or consequences of an inadvertent RCIC injection because all of the affected piping, fittings, and valve pressure boundaries are qualified to the appropriate fluid transients and operational conditions in accordance with the design and licensing basis. The licensee further noted that no instrument setpoints were changed as a result of this modification and that the RCIC system modes of operation were not changed or affected by this modification. Based on the above, the licensee concluded that there was no change in the probability of an inadvertent initiation of RCIC by this modification, and that there was no impact to the probability or consequences of any previously evaluated accident.
The NRC inspection report dated June 9, 2017, stated, in part:
the licensee's evaluation for this modification was inadequate because the licensee had failed to correctly evaluate that a spurious [RCIC] actuation injecting through the feedwater line would also result in the same characteristics, (and therefore increase the probability of occurrence) of another accident previously evaluated ([LOFH]) and that this would be more than a minimal increase in frequency.
The NRC staff stated that the spurious RCIC injection to feedwater line has similar thermal-hydraulic characteristics as that of the LOFH transient. Upon reviewing the license amendment request and related documentation, including the licensee's analysis, plant technical specifications, USAR, and TRM, the NRC staff determined, however, that the probability of occurrence of an LOFH event or its consequences will not increase as a result of the RCIC relocation because:
- 1. While the thermal-hydraulic characteristics for LOFH and spurious RCIC injection into the feedwater line are similar, these are two distinct and isolated events, independent and separate from one another, and that these two transients are caused by different failure mechanisms. As such, initiation of one of these events need not necessarily increase the probability of initiating the other event, or its consequences.
- 2. The licensee's analysis demonstrated that the acceptable fuel design limits in GDC 1O are not exceeded and that a spurious RCIC event is bounded by the LOFH.
Based on the above, the NRC staff concludes that neither the probability nor the consequences of the LOFH event, as currently analyzed in the RBS USAR, increases due to relocating the RCIC injection point from the reactor vessel head spray nozzle to the 'A' Feedwater line via the
'A' RHR shutdown cooling return line. The staff further concludes that the relocation continues to satisfy the fuel design limits of GDC 10. The staff, therefore, finds that the changes to the RBS USAR are acceptable.
The NRC staff also reviewed the licensee's submittals related to the piping stress analysis model, thermal transient curves and cycles, and the stress result summary. To evaluate the piping stress, fluid transient information, and cumulative usage factor (CUF), the licensee's piping analysis applied the ASME Code Case N-411 damping value to reduce the seismic and dynamic analysis stress results. The licensee determined that the high energy line break locations were not increased based on the lower ASME Code Section Ill, Piping Stress Equation, in accordance with Section B.1.(ii)(1 )(c) of BTP 3-4 of the SRP. The stress calculation result demonstrated that all the stresses were within ASME Code Class 1 and 2 allowable limits. The NRC staff reviewed the summary of these analyses and found them acceptable since they continue to meet the ASME Code acceptance criteria as specified in 10 CFR 50.55a.
The licensee stated in the application that the RCIC piping reroute added a new transient since 40 degree Fahrenheit RCIC water would inject into the feedwater piping during an accident condition with no feedwater flowing. The licensee's feedwater piping fatigue evaluation included this new transient and the resultant maximum CUF is below the ASME Class 1 CUF allowable value of 1.0. Based on the above discussion, the NRC staff finds that the licensee's CUFs are acceptable and that there is no change to the postulated high energy line break locations.
The licensee's application, as supplemented by letters dated June 21, August 15, and November 13, 2018, was evaluated by the NRC staff. The NRC staff determined that the applicable regulatory requirements contained in GDC 10 and 10 CFR 50.55a will continue to be met since the acceptance criteria for GDC 10 and the ASME Code for Class 1 and 2 allowable dynamic stress limits will continue to be met. Thus, the NRC staff concludes that the change is acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Louisiana State official was notified of the proposed issuance of the amendment on December 11, 2018. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes requirements with respect to the installation or use of facility components located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts and no significant change in the types of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding published in the Federal Register on May 22, 2018 (83 FR 23732). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b ), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: M. Razzaque K. Hsu Date: December 21, 2018
ML18345A342 *b memo **b email OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DSS/SRXB/BC* NRR/DE/EMIB/BC*
NAME LRegner PBlechman JWhitman SBailey DATE 12/13/2018 12/13/2018 9/10/2018 9/16/2018 OFFICE OGC (NLO)** NRR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME JWachutka RPascarelli LRegner DATE 12/20/2018 12/21/2018 12/21/2018 . ***
--- -~