Category:Meeting Briefing Package/Handouts
MONTHYEARML24129A0672024-05-0808 May 2024 5_8_24 Meeting Handouts - Proposed Change to the PWR ECCS Mode 4 Requirements ML24129A0652024-05-0808 May 2024 5_8_24 Meeting Handouts - Active Traveler Summary Report and Priorities ML24129A0662024-05-0808 May 2024 5_8_24 Meeting Handouts - History of Traveler Adoption ML24044A1402024-02-0808 February 2024 TSTF Handout for 02/08/2024 Quarterly Meeting ML24038A3492024-02-0707 February 2024 NRC Comments for Pre-submittal Meeting TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML23257A1582023-09-18018 September 2023 NRC Staff Feedback Draft TSTF-601, Extend Shield Building Completion Time After Refueling for Pre-submittal Meeting on 9/18/23 ML23033A3842023-02-0202 February 2023 February 9, 2023, Meeting Handout: NRC Staff Comments on TSTF-576 Revision 2 (Draft), SRV Requirements ML22298A2162022-10-25025 October 2022 TSTF Meeting Handout TSTF-585 and the Maintenance Rule ML22298A2172022-10-24024 October 2022 TSTF Meeting Handout Strategic Improvements to TS and TS-Related Processes ML22298A2152022-10-20020 October 2022 TSTF Meeting Handout Natural Phenomena and Operability Workshop ML22056A2942022-02-24024 February 2022 2/24/2022 Meeting Handout - TSTF 2021 in Review ML22056A2932022-02-24024 February 2022 2/24/2022 Meeting Handout - Active Traveler Summary Report ML22038A6032022-02-10010 February 2022 Summary of January 10, 2022, Meeting with the Technical Specifications Task Force Draft Traveler TSTF-589 Eliminate Automatic Diesel Generator Start During Shutdown ML22013B1422022-02-0101 February 2022 TSTF-576 Workshop February 2022 - NRC Presentation ML21217A0692021-08-0505 August 2021 Meeting Handout - Active Traveler Summary Report ML21158A0902021-06-0707 June 2021 Technical Specifications Branch Feedback/Comments on Draft TSTF-585, Revise LCO 3.0.3 ML21126A0722021-05-0606 May 2021 5/6/2021 Meeting Handout - Expected TSTF-577 Submittals ML21126A0732021-05-0606 May 2021 5/6/2021 Meeting Handout - Active Traveler Summary Report ML21126A0712021-05-0606 May 2021 5/6/2021 Meeting Handout - Interaction of Technical Specification Surveillances and 10 CFR 50.69 ML21029A3082021-01-29029 January 2021 Trio Public Meeting Slides (Thursday, February 4, 2021) ML21007A1112021-01-0707 January 2021 TSTF-577, NRC Staff Slides from Public Meeting on 1_7_2021 ML20329A3412020-11-24024 November 2020 TSTF-576 Example Scenarios for 12/7/2020 Meeting ML20287A2632020-10-13013 October 2020 TSTF Presentation Proposal to Improve the Core Operating Limits Report (COLR) ML20125A0922020-05-0404 May 2020 May 4, 2020, Pre-submittal Meeting Handout Staff Comments Draft TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML20065J9342020-03-0505 March 2020 March 5 2020 Meeting Handout, Agenda Item Iia - 2019 in Review ML20065J9332020-03-0505 March 2020 March 5 2020 Meeting Handout, Agenda Item IV - Active Traveler Summary Report and Priorities ML20065J9902020-03-0505 March 2020 March 5 2020 TSTF Quarterly Meeting Handout, Agenda Item Iiib - Generic RAIs for LARs to Adopt TSTF-505 Rict ML20069F2882020-03-0505 March 2020 March 5 2020 TSTF Quarterly Meeting Handout, Agenda Item Iia - 2019 in Review ML20065J9322020-03-0505 March 2020 March 5 2020 Meeting Handout, Agenda Item VA - Proposal to Revise LCO 3.0.3 ML20069F2852020-01-0101 January 2020 March 5 2020 TSTF Quarterly Meeting Handout, Agenda Item Via - TSTF Charter Statement 2020 ML19267A1592019-09-24024 September 2019 TSTF Handout for October 16, 2019, Meeting: TSTF-493 Questions ML19259A2082019-09-12012 September 2019 TSTF Presentation from TSTF-576, S/Rv Requirements Pre-submittal Meeting on September 12, 2019 TSTF-19-07, TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-4932019-06-18018 June 2019 TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-493 ML19056A4262019-02-21021 February 2019 Rewording of TSTF Revision to TSTF-541, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed ML19056A4242019-02-21021 February 2019 TSTF-568 Proposed Path Forward from 2/21/2019 Meeting ML19056A4232019-02-21021 February 2019 Meeting Attendees 02/21/2019 ML18312A3672018-11-0808 November 2018 Handout from 11/08/2018 TSTF Meeting for Agenda Item Ii.B.C November 2018 Traveler Review Schedule Changes ML18312A3662018-11-0808 November 2018 Handout from 11/8/2018 TSTF Meeting for Agenda Items V.A and V.B Active Traveler Summary Report and Traveler Review Priorities ML18221A5812018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 5.A.6 NRC Feedback Re TSTF-568 Evaluation of STS 3.6.3.2 ML18221A5772018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 4.C - TSTF-542 Adoption Status ML18221A5752018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 5.A Active Traveler Summary Report ML18221A5742018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 5.A.6 - TSTF-565R1 ML18221A5722018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 3.A - DNP LAR Analysis ML18221A5712018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 4.A TSTF Response TSTF-51 -286 -471 ML18221A5732018-08-0606 August 2018 August 9, 2018, Meeting Agenda Item 7.A - Is the Table of Contents Part of the Technical Specifications? ML18142B0372018-05-17017 May 2018 May 17, 2018, Meeting Agenda Item 2.A - TSTF-563 Coordinated Submittal Pilot ML18142B0352018-05-17017 May 2018 May 17, 2018, Meeting Agenda Item 4.B - TSTF-547 Issue ML18142B0382018-05-17017 May 2018 May 17, 2018, Meeting Agenda Item 5 - Active Traveler Summary Report ML18142B0362018-05-17017 May 2018 May 17, 2018, Meeting Agenda Item 4.A TSTF Response TSTF-51 -286 -471 ML18142B0342018-05-17017 May 2018 May 17, 2018, Meeting Agenda Item 3.A - Traveler Adoption 2024-05-08
[Table view] Category:Slides and Viewgraphs
MONTHYEARML22298A2162022-10-25025 October 2022 TSTF Meeting Handout TSTF-585 and the Maintenance Rule ML22298A2172022-10-24024 October 2022 TSTF Meeting Handout Strategic Improvements to TS and TS-Related Processes ML22013B1422022-02-0101 February 2022 TSTF-576 Workshop February 2022 - NRC Presentation ML21007A1112021-01-0707 January 2021 TSTF-577, NRC Staff Slides from Public Meeting on 1_7_2021 ML20329A3412020-11-24024 November 2020 TSTF-576 Example Scenarios for 12/7/2020 Meeting ML20287A2632020-10-13013 October 2020 TSTF Presentation Proposal to Improve the Core Operating Limits Report (COLR) ML20276A1352020-10-0202 October 2020 TSTF Proposal to Reevaluate Application of 10 CFR 50.36(c)(2)(ii) Criterion 4 ML20125A0922020-05-0404 May 2020 May 4, 2020, Pre-submittal Meeting Handout Staff Comments Draft TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML20065J9322020-03-0505 March 2020 March 5 2020 Meeting Handout, Agenda Item VA - Proposal to Revise LCO 3.0.3 ML19056A4242019-02-21021 February 2019 TSTF-568 Proposed Path Forward from 2/21/2019 Meeting ML19031A5442019-01-29029 January 2019 Attachment - Draft Revision to TSTF-541, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed. ML17033A0352017-01-31031 January 2017 Meeting Handout TSTF-567, GSI-191, Presubmittal Meeting Slides ML16054A5312016-02-18018 February 2016 TSTF Quarterly Meeting Handout Proposed Reactor Coolant Leakage Requirements Traveler ML16054A5272016-02-18018 February 2016 TSTF Quarterly Meeting Handout Addressing Channel Components Calibration Frequency Under the SFCP ML15084A2112013-01-16016 January 2013 TSTF Handout from January 17, 2013, Meeting Relocation of Calculated Peak Containment Internal Pressure (Pa) to Licensee Control ML15084A2132013-01-16016 January 2013 TSTF Handout from January 17, 2013, Meeting Proposed Generic Traveler to Address Inoperable Room Coolers ML13169A3652012-10-18018 October 2012 Meeting Handout - SF-SSF Definition Presentation ML1132201642011-11-17017 November 2011 TSTF Presentation Revision to TSTF-523 ML1122000772011-08-31031 August 2011 8/4/2011 - Presentation for Meeting with the Technical Specifications Task Force and the Nuclear Energy Institute Regarding Gas Accumulation Issues and TSTF-523 ML11223A0612011-08-0303 August 2011 NEI Gat Presentation at 8/4/11 Meeting - Purpose of NEI 09-10, Guidelines for Effective Prevention and Management of System Gas Accumulation. ML11223A0622011-08-0303 August 2011 8/4/11 -TSTF Presentation at Meeting with NRC and NEI Regarding Gas Accumulation Issues and TSTF-523, TSTF Response to NRC Letter Dated May 25, 2011. ML11224A1172011-08-0303 August 2011 Meeting Handout - DAEC Proposal to Consolidate Identical SRs After SFCP Adoption ML11224A1192011-08-0303 August 2011 Meeting Handout - TSTF Concerns with the Proposed NFPA-805 License Conditions ML11224A1202011-08-0303 August 2011 Meeting Handout - Compliance and Safety Concerns with Required Actions 3.8.1.B.3.1 and B.3.2 ML1101400552010-01-12012 January 2010 TSTF-523 Meeting Presentation ML0916301772009-06-0404 June 2009 Technical Specification Task Force Presentation for Meeting to Discuss Status of Current and Planned TSTF Travelers, and Process and Administrative Issues of Mutual Interest ML0913903782009-05-19019 May 2009 Proposed Technical Specification Approach in Response to Generic Letter 2008-01 ML0832408252008-11-24024 November 2008 Enclosure 2 - Handout - TSTF Presentation Discussions on Industry Concerns Regarding Technical Specification Branch Positions and TSTF-493, Rev. 3, Clarify Application of Setpoint Methodology for LSSS Functions. 2022-02-01
[Table view] |
Text
Technical Specifications Task Force TSTF A Joint Owners Group Activity Use of Maintenance Rule Risk Assessments in TSTF-585, "Provide an Alternative to the LCO 3.0.3 One-Hour Preparation Time" October 25, 2022 1
Technical Specifications Task Force TSTF A Joint Owners Group Activity TSTF-585 OVERVIEW Kevin Lueshen, Constellation TSTF member 2
Technical Specifications Task Force TSTF A Joint Owners Group Activity
Background
- The TSTF has shared two drafts of TSTF-585 for discussion with the NRC.
- Teleconferences were held on June 10, 2021, and February 3, 2022.
- The NRC has provided three sets of comments on the drafts: June 2021, February 2022, and March 2022.
(Maintenance Rule) tools to assess and manage risk during a proposed extended delay time before initiating a shutdown under LCO 3.0.3.
- Todays workshop is primarily focused on those issues, as well as some related NRC questions and comments on TSTF-585.
3
Technical Specifications Task Force TSTF A Joint Owners Group Activity Overview of TSTF-585
- LCO 3.0.3 requires a plant shutdown under three conditions:
- 1. An LCO is not met and the associated Actions are not met;
- 2. An LCO is not met and an associated Action is not provided; or
- 3. An LCO is not met and LCO 3.0.3 entry is directed by the associated Actions.
- LCO 3.0.3 requires initiation of actions to shut down the plant within one hour if any of the conditions are met without regard to the safety significance of the issue that resulted in LCO 3.0.3 entry.
- The one hour to prepare appeared in the 1980s versions of the standard TS with no explanation.
- GL 87-09 added the following Bases, "One hour is allowed to prepare for an orderly shutdown before initiating a change in plant operation. This time permits the operator to coordinate the reduction in electrical generation with the load dispatcher to ensure the stability and availability of the electrical grid."
4
Technical Specifications Task Force TSTF A Joint Owners Group Activity Overview of TSTF-585
- Based on 40 years of operating experience, the one hour delay period should be extended.
- Given typical shutdown preparations, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is warranted for low-risk situations.
- TSTF-585 revises LCO 3.0.3 to provide an alternative to the one hour provided to prepare for a shutdown:
- If the LCO 3.0.3 entry is unplanned, and
- If risk is assessed and managed, then
- 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is provided initiate the shutdown.
- The conditions for entering LCO 3.0.3 are unchanged.
- The shutdown requirements (e.g., lower Mode entry) in LCO 3.0.3 are unchanged.
5
Technical Specifications Task Force TSTF A Joint Owners Group Activity Overview of TSTF-585
- What is meant by, "risk is assessed and managed"?
- The requirement that risk be assessed and managed appears in:
- LCO 3.0.4 (Mode changes) (TSTF-359),
- LCO 3.0.8 (Nonfunctional Snubbers) (TSTF-372),
- LCO 3.0.9 (Nonfunctional Barriers) (TSTF-427), and
- SR 3.0.3 (Missed Surveillances) (TSTF-358).
- Section 11 of NUMARC 93-01, "Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants,"
- Endorsed by NRC Regulatory Guide 1.160, "Monitoring the Effectiveness of Maintenance at Nuclear Power Plants."
6
Technical Specifications Task Force TSTF A Joint Owners Group Activity Overview of TSTF-585
- In order to use the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> preparation period in LCO 3.0.3.b:
- There may be no more than minimal increase in risk (i.e., the level determined acceptable during normal work control levels ), and
- NUMARC 93-01 describes an activity subject to "normal work controls" as having an incremental core damage probability (ICDP) < 1E-6 and an Incremental Large Early Release Probability (ILERP) of < 1E-7.
- The risk assessment must consider all inoperable TS equipment regardless of whether the equipment is included in the normal MR risk assessment scope.
7
Technical Specifications Task Force TSTF A Joint Owners Group Activity Overview of TSTF-585
- If the situation does not satisfy the risk requirement or is planned, the existing one hour delay period applies.
- The proposed TS and Bases provide guidance when:
- The risk assessment is completed after the one hour delay time has expired, and
- The plant conditions and risk assessment change after the one hour delay time has expired.
8
Technical Specifications Task Force TSTF A Joint Owners Group Activity USE OF THE MAINTENANCE RULE TO ASSESS AND MANAGE RISK WHILE IN LCO 3.0.3 Brad Dolan, TVA PWROG Risk Management Committee Chair 9
Technical Specifications Task Force TSTF A Joint Owners Group Activity How the MR Tools are Used to Assess and Manage Risk
- Schedulers and work week managers plan schedule in advance to be low risk
- Use tools like EOOS, PHOENIX, PARAGON and RISK MONITOR to confirm
- During each execution week Operators keep actual status current in software
- Status is "live" in control room 10
Technical Specifications Task Force TSTF A Joint Owners Group Activity How the MR Tools are Used to Assess and Manage Risk
- Current status of plant is maintained in Configuration Risk Management (CRM) software
- Prior to removing equipment from service (or upon an emergent failure) operators will calculate risk
- Typical calculation time for example plant is on the order of 1-2 minutes
- If risk level is "green," (minimal increase) no RMAs required, but may be implemented if appropriate
- If risk level is "yellow," (slightly elevated) RMAs required
- Sometimes inoperable equipment can be maintained "available"
- Appropriate RMAs chosen by control room operators 11
Technical Specifications Task Force TSTF A Joint Owners Group Activity How the MR Tools are Used to Assess and Manage Risk
- Pre-job brief to heighten awareness
- Walk down/ protect redundant train (or function) equipment
- Plans for prompt restoration
- Minimize work in areas contributing to initiating event frequency (e.g.
switchyards)
- Establish alternate success paths (portable equipment, FLEX equipment, etc.)
12
Technical Specifications Task Force TSTF A Joint Owners Group Activity How the MR Tools are Used to Assess and Manage Risk
- User friendly software
- Model of record
- Plant model is peer reviewed consistent with ASME/ANS standard and RG 1.200
- Plant model contains high level of detail including dependencies, common-cause, etc.
13
Technical Specifications Task Force TSTF A Joint Owners Group Activity Discussion 14