ML18142B034
ML18142B034 | |
Person / Time | |
---|---|
Site: | Technical Specifications Task Force |
Issue date: | 05/17/2018 |
From: | Technical Specifications Task Force |
To: | Office of Nuclear Reactor Regulation |
Honcharik M | |
Shared Package | |
ML18142B058 | List: |
References | |
Download: ML18142B034 (3) | |
Text
TSTF Number TSTF Title Adoption (Approvals Submittals TSTF-358, Rev. 6 Missed Surveillance Requirements 100%
TSTF-369, Rev. 1 Removal of Monthly Operating Report and Occupational Radiation Exposure Report 100%
TSTF-413, Rev. 0 Elimination of Requirements for a Post Accident Sampling System (PASS) (NEDO-3299) 100%
TSTF-442, Rev. 0 Elimination of Requirements for a Post Accident Sampling System (PASS) 100%
TSTF-449, Rev. 4 Steam Generator Tube Integrity 100%
TSTF-479, Rev, 0 Changes to Reflect Revision of 10CFR50.55a 100%
TSTF-497, Rev, 0 Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less 100%
TSTF-448, Rev. 3 Control Room Habitability 98%
TSTF-366, Rev. 0 Elimination of Requirements for a Post Accident Sampling System (PASS) 97%
TSTF-447, Rev. 1 Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors 97%
TSTF-535, Rev. 0 Revise Shutdown Margin Definition to Address Advanced Fuel Designs 92%
TSTF-404, Rev. 0 SDV Actions 92%
TSTF-460, Rev. 0 Control Rod Scram Time Testing Frequency 88%
TSTF-542,Rev. 2 Reactor Pressure Vessel Water Inventory Control 88%
TSTF-359, Rev. 9 Increase Flexibility in MODE Restraints 84%
TSTF-425, Rev. 3 Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b 84%
TSTF-511, Rev. 0 Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 2 83%
TSTF-510-A, Rev. 2 Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection 80%
TSTF-484, Rev. 0 Use of TS 3.10.1 for Scram Time Testing Activities. 79%
TSTF-426, Rev. 5 Revise or Add Actions to Preclude Entry into LCO 3.0.3 - RITSTF Initiatives 6b & 6c 71%
TSTF-421, Rev. 0 Revision to RCP Flywheel Inspection Program (WCAP-15666) 69%
TSTF-545, Rev. 3 TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing 69%
TSTF-523-A, Rev. 2 Generic Letter 2008-01, Managing Gas Accumulation 63%
TSTF-372, Rev. 4 Addition of LCO 3.0.8, Inoperability of Snubbers 60%
TSTF-370, Rev. 0 Increase accumulator Completion Time from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (WCAP-15049) 60%
TSTF-522, Rev. 0 Revise Ventilation System Surveillance Requirements to Operate for 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> per Month 59%
TSTF-490, Rev. 0 Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec 58%
N/A Elimination of Typical License Condition Requiring Reporting of Violations of Section 2.C 56%
TSTF-476, Rev. 1 Improved BPWS Control Rod Insertion Process (NEDO-33091) 54%
TSTF-477, Rev. 3 Add Action for Two Inoperable Control Room AC Subsystems 50%
TSTF-423, Rev. 1 Technical Specifications End States, NEDC-32988-A 46%
TSTF-514, Rev. 3 Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation 46%
TSTF-374, Rev. 0 Revision to TS 5.5.13 and associated TS Bases for Diesel Fuel Oil 45%
TSTF-486, Rev. 2 Revise MTC Surveillance for Startup Test Activity Reduction (STAR) Program (WCAP-16011) 43%
TSTF-551, Rev. 3 Revise Secondary Containment Surveillance Requirements 42%
TSTF-513, Rev. 3 Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation 40%
TSTF-529, Rev. 4 Clarify Use and Application Rules 38%
TSTF-427, Rev. 2 Allowance for Non Technical Specification Barrier Degradation on Supported System OPERABIL 38%
TSTF-475, Rev. 1 Control Rod Notch Testing Frequency and SRM Insert Control Rod Action 38%
TSTF-491, Rev. 2 Removal of Main Steam and Main Feedwater Valve Isolation Times From Technical Specificatio 38%
TSTF-422, Rev. 2 Change in Technical Specifications End States (CE NPSD-1186) 29%
TSTF-487, Rev. 1 Relocate DNB Parameters to the COLR 29%
TSTF-501, Rev. 1 Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control 28%
TSTF-547, Rev. 1 Clarification of Rod Position Requirements 28%
TSTF-412, Rev. 3 Provide Actions for One Steam Supply to Turbine Driven AFW/EFW Pump Inoperable 26%
TSTF-430, Rev. 0 AOT Extension to 7 Days for LPI and Containment Spray (BAW-2295-A, Rev. 1) 25%
TSTF-431, Rev. 3 Change in Technical Specifications End States (BAW-2441) 25%
TSTF-432, Rev.1 Change in Technical Specifications End States (WCAP-16294) 21%
TSTF-500-A, Rev. 2 DC Electrical Rewrite - Update to TSTF-360 20%
TSTF-493, Rev. 4 Clarify Application of Setpoint Methodology for LSSS Functions 16%
TSTF-478, Rev. 2 BWR Technical Specification Changes that Implement the Revised Rule for Combustible Gas Co 13%
TSTF-505-A, Rev. 1 Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b 9%
TSTF-446, Rev. 3 Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791) 7%
TSTF-546, Rev. 0 Revise APRM Channel Adjustment Surveillance Requirement 4%
TSTF-409, Rev. 2 Containment Spray System Completion Time Extension (CE NPSD-1045-A) 0%
TSTF-454, Rev. 1 Increase PCIV Completion Times from 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days (NEDC-33046) 0%
TSTF-498, Rev. 1 Risk-Informed Containment Isolation Valve Completion Times (BAW-2461) 0%
Green Underline - Risk Informed Red Underline - NRC Initiated or Requirement
Examination of Traveler Review Time 2016-2018 160 approved LARs to adopt travelers Average review time (Submittal to Approval): 308 days (< 10 months)
Excluding Vogtle TSTF-505 review (1,565 days)
- 35 (22%) review time over 1 year (Average 480 days, 15.8 months)
- 16 (10%) review over 13 months (Average 525 days, 17.25 months)
Traveler Adoption Review Time > 13 months Plant Name TSTF Number Approval Submittal Review Date Date Time Hatch 1 & 2 TSTF-500-A, 08/29/17 08/11/15 749 Rev. 2 Cook 1 & 2 TSTF-490, Rev. 10/20/16 11/14/14 706 0
Perry TSTF-425, Rev. 02/23/16 03/25/14 700 3
Columbia TSTF-425, Rev. 11/02/16 03/17/15 596 3
Susquehanna 1 & 2 TSTF-425, Rev. 05/20/16 10/26/14 572 3
Columbia TSTF-423, Rev. 02/03/16 08/12/14 540 1
Brunswick 1 & 2 TSTF-425, Rev. 05/24/17 12/21/15 520 3
Fermi TSTF-545, Rev. 11/29/17 07/25/16 492 3
Cook 1 & 2 TSTF-425, Rev. 03/31/17 12/14/15 473 3
Harris TSTF-425, Rev. 11/29/16 08/18/15 469 3
Hatch 1 & 2 TSTF-523-A, 04/16/16 01/13/15 459 Rev. 2 Watts Bar Unit 2 TSTF-547, Rev. 02/13/18 11/23/16 447 1
Nine Mile Point 1 TSTF-425, Rev. 05/31/16 03/26/15 432 3
Farley 1 & 2 TSTF-432, 06/10/16 04/13/15 424 Rev.1 Surry 1 & 2 TSTF-523-A, 02/29/16 01/14/15 411 Rev. 2 Waterford 3 TSTF-425, Rev. 07/26/16 06/17/15 405 3
Page 1 EXCEL Services Corporation
Examination of Traveler Review Time 2016-2018 TSTF-425, 10 submittals, average of 493 days (16 months)
TSTF-425 Review Time vs. Approval Date 800 700 600 500 400 300 200 100 0
Examining the three TSTF-425 approvals in 2017:
- Brunswick submitted 3 supplements and 5 RAI responses
- D.C. Cook submitted 2 supplements and 4 RAI responses
- Cooper had no supplements and one RAI response Page 2 EXCEL Services Corporation