ML110140055
| ML110140055 | |
| Person / Time | |
|---|---|
| Site: | Technical Specifications Task Force |
| Issue date: | 01/12/2010 |
| From: | Technical Specifications Task Force, PWR Owners Group |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML110140055 (42) | |
Text
Technical Specifications Task Force A Joint Owners Group Activity TSTF DiscussionoftheAppropriateRegulatory M
h i
t C t
th O G i MechanismtoCapturetheOnGoing RequirementsofGenericLetter200801, "M
i G
A l ti i E "ManagingGasAccumulationinEmergency CoreCooling,DecayHeatRemoval,and C
t i t S S
t ContainmentSpraySystems" J
12 2010 January12,2010 1
Technical Specifications Task Force A Joint Owners Group Activity TSTF TSTF523
- The TSTF submitted TSTF523, Revision 0, "Generic TheTSTFsubmittedTSTF 523,Revision0, Generic Letter(GL)200801,ManagingGasAccumulation,"
onJune29,2010.
- TheTravelerproposedto:
- ExpandtheLCOBasesdescribinggasmanagementasan importantaspectofsystemOperability,
- AddaGasManagementProgramtotheFSARwhich describes the ongoing aspects of gas management and describestheongoingaspectsofgasmanagement,and
- ReplacetheexistingSRswiththeGasManagement Programrequirements.
2
Technical Specifications Task Force A Joint Owners Group Activity TSTF i
MeetingPurpose
- The NRC staff is still considering whether to accept TheNRCstaffisstillconsideringwhethertoaccept TSTF523.
- Thestaffisconsideringwhethertheproposedapproachis acceptableorwhetherthesomeactionstakeninresponse totheGLshouldbecapturedintheTechnical Specifications (TS)
Specifications(TS).
- Thepurposeoftoday'smeetingistodiscussthe appropriateregulatorymechanismtocapturethe pp p
g y
p ongoingrequirementstomanagegasaccumulation.
3
Technical Specifications Task Force A Joint Owners Group Activity TSTF h
i d
i h bili TheGLisConcernedwithSystemOperability
- Under "Requested Actions" the GL stated:
Under RequestedActions theGLstated:
"TheNRCrequeststhateachaddresseeevaluateits ECCS,DHRsystem,andcontainmentspraysystem y
p y y licensingbasis,design,testing,andcorrectiveactions toensurethatgasaccumulationismaintainedless thantheamountthatchallengesoperability of thesesystems,andthatappropriateactionistaken when conditions adverse to quality are identified "
whenconditionsadversetoqualityareidentified."
4
Technical Specifications Task Force A Joint Owners Group Activity TSTF There Have Been Many GLs on Aspects of System ThereHaveBeenManyGLsonAspectsofSystem Operability
- GL 0801 is not unique. As discussed in the GL08 01isnotunique.Asdiscussedinthe justificationforTSTF523,theNRChasissuedmany GLsthataddressanaspectofOperability.
- TheNRCstaffhasusedtheinspectionprocessto ensurethelicenseeresponsestotheseGLscontinue tobeimplemented.
- Examininginspectiondatasince2001:
- GL8908,"Erosion/CorrosionInducedPipeWallThinning,
- 18referencesininspectionreports
- GL8712,"LossofResidualHeatRemoval(RHR)WhiletheSystem
(
)
y (RCS)isPartiallyFilled,
- 18referencesininspectionreports 5
Technical Specifications Task Force A Joint Owners Group Activity TSTF There Have Been Many GLs on Aspects of System ThereHaveBeenManyGLsonAspectsofSystem Operability
- GL8817,"LossofDecayHeatRemoval,
- 159referencesininspectionreports,1NCV
- Example:"ProcedureswerereviewedforcommitmentstoGL 8817toverifythatthesecommitmentswereinplace" y
p
- GL8910,"SafetyRelatedMotorOperatedValveTestingand Surveillance,
- 115 references in inspection reports 4 NCVs or Violations 115referencesininspectionreports,4NCVsorViolations
- GL8913,"ServiceWaterSystemProblemsAffectingSafetyRelated Equipment,
- 574 references in inspection reports > 10 NCVs or Violations
- 574referencesininspectionreports,>10NCVsorViolations
- GL9704,"AssuranceofSufficientNetPositiveSuctionHeadfor EmergencyCoreCoolingandContainmentHeatRemovalPumps.
15 f
i i i
4 NCV Vi l i
- 15referencesininspectionreports,4NCVsorViolations 6
Technical Specifications Task Force A Joint Owners Group Activity TSTF There Have Been Many GLs on Aspects of System ThereHaveBeenManyGLsonAspectsofSystem Operability
- Licensee responses to GLs have proven to be durable LicenseeresponsestoGLshaveproventobedurable andenforceable.
- Licenseesrespondedtotheseissuesbyperforming p
y p g
testing,makingmodifications,revisingtesting procedures,preventivemaintenancemeasures,etc.,
withouttheadoptionofadditionalTSrequirements.
- GL0801isnomoresafetysignificant,complex,or d
b l h
h h
tiedtoOperabilitythantheotherissues.
- GL0801shouldbetreatedconsistentlywithother GL t
f O bilit GLsonaspectsofOperability.
7
Technical Specifications Task Force A Joint Owners Group Activity TSTF i
ifi f h i i i
SignificanceoftheExistingSRsonVentingGas
- The NRC staff has discussed whether GL 0801 TheNRCstaffhasdiscussedwhetherGL08 01 shouldbetreateddifferentlythanprevious OperabilityissuesthatwerethesubjectofGLs becausethereisanexistingSurveillancethat requiresverifyingthatthesystempipingisfullof t
water.
- ThepresenceoftheexistingSRsshouldnotresultin GL 08 01 being treated differently than the other GLs GL0801beingtreateddifferentlythantheotherGLs regardingOperability.
8
Technical Specifications Task Force A Joint Owners Group Activity TSTF i
ifi f h i i i
SignificanceoftheExistingSRsonVentingGas
- IntheGL,theNRCnotedthattheISTSandmostTScontain SRstoverifythatportionsofthesubjectsystemsarefullof water,butdidnotrelyonTScomplianceastheregulatory basis for the GL basisfortheGL.
- Thescope&frequencyoftheverificationvaries betweendesignsandplants,andsomeplantshaveno similarTSrequirements.
- TheTSrequiresverificationthatpipingisfullofwater, which is subject to interpretation whichissubjecttointerpretation.
9
Technical Specifications Task Force A Joint Owners Group Activity TSTF i
ifi f h i i i
SignificanceoftheExistingSRsonVentingGas
- It is not unique for the NRC staff to determine that ItisnotuniquefortheNRCstafftodeterminethat existingSRsshouldnotbeinTSandtheyhavebeen removed,forexample:
- GL9401,RemovalofAcceleratedTestingandSpecial ReportingRequirementsforEmergencyDieselGenerators h d l
f h
- DuringthedevelopmentoftheISTSmanySRswere relocatedordeleted.
During a recent ITS conversion of an STS plant 10 SRs were
- DuringarecentITSconversionofanSTSplant,10SRswere relocatedtolicenseecontrolinadditiontothemany Specificationsthatwererelocated.
10
Technical Specifications Task Force A Joint Owners Group Activity TSTF i
ifi f h i i i
SignificanceoftheExistingSRsonVentingGas
- The existing SRs do not contribute to the LCO TheexistingSRsdonotcontributetotheLCO requirementthatthesystemsbeOperable.
- InTIA200803response,theNRCstatedtheintentofthe SRmaybemetifthelicenseecanestablishthroughan Operabilitydeterminationthatthereisareasonable expectation that the system in question will perform its expectationthatthesysteminquestionwillperformits specifiedsafetyfunction.
11
Technical Specifications Task Force A Joint Owners Group Activity TSTF i
ifi f h i i i
SignificanceoftheExistingSRsonVentingGas
- Considering all of the above, the existence of the SRs Consideringalloftheabove,theexistenceoftheSRs isnotsignificantandshouldnotbeafactorin determiningtheappropriateregulatorymechanism tocapturetheongoingrequirementsoftheGL.
- Weshouldstartwitha"cleanslate."
12
Technical Specifications Task Force A Joint Owners Group Activity TSTF What are the OnGoing Requirements on Gas WhataretheOn GoingRequirementsonGas Management?
- In the GL, the NRC identified the following four IntheGL,theNRCidentifiedthefollowingfour principleareastobeaddressed:
- LicensingBasis
- Design
- Testing
- CorrectiveActions
- LicenseesrespondingtotheGLusedtheNEI t
l t hi h dd d th t i
templatewhichaddressedthetopics.
- Thefollowingslidesaddresstheongoing requirements identified in the responses requirementsidentifiedintheresponses.
- ThisinformationisintheTSTF523justification.
13
Technical Specifications Task Force A Joint Owners Group Activity TSTF What are the OnGoing Requirements on Gas WhataretheOn GoingRequirementsonGas Management?
- Licensing Basis Evaluation LicensingBasisEvaluation
- TheCurrentLicensingBasiswasreviewedwithrespecttogas accumulationforthesystemstobeevaluated.
TS requirements such as "Operable flow path" or "Operable
- TSrequirementssuchas Operableflowpath or Operable train/subsystem"wereconfirmedtoinherentlyincludethe requirementthatentrainedgasislimitedsuchthattheflowpathor train/subsystem remains Operable train/subsystemremainsOperable.
- TSTF523addsentrainedgasinformationtothe systemLCOBasestocaptureandreinforcethis y
p requirement.
14
Technical Specifications Task Force A Joint Owners Group Activity TSTF What are the OnGoing Requirements on Gas WhataretheOn GoingRequirementsonGas Management?
- Design Evaluation DesignEvaluation
- DesignBasisDocumentswerereviewedwithrespecttogas accumulationforthesystemstobeevaluatedandthe resultsweredocumentedintheresponsetotheGL.
- Aspartofthedesignreview,theresponseincluded:
- Identify all system vents and high points and use of additional
- Identifyallsystemventsandhighpointsanduseofadditional ventswhereneeded.
- Identificationofprocedurerevisionsornewproceduresrelatedto fill and vent activities fillandventactivities.
- Identificationofpotentialgasintrusionmechanismsintoeach systemforeachpipingsegmentthatisvulnerabletogasintrusion.
- Procedural acceptance criteria on gas volume for each piping
- Proceduralacceptancecriteriaongasvolumeforeachpiping segmentineachsystemwheregascanaccumulate.
15
Technical Specifications Task Force A Joint Owners Group Activity TSTF What are the OnGoing Requirements on Gas WhataretheOn GoingRequirementsonGas Management?
- Design Evaluation DesignEvaluation
- Theseongoingrequirementsrelatedtodesignand proceduresarecapturedintheproposedFSARGas ManagementProgramandinimplementingplant procedures.
16
Technical Specifications Task Force A Joint Owners Group Activity TSTF What are the OnGoing Requirements on Gas WhataretheOn GoingRequirementsonGas Management?
ProposedFSARGasManagementProgram ThepipingsystemsaddressedintheresponsetoNRCGenericLetter200801,"ManagingGas AccumulationinEmergencyCoreCooling,DecayHeatRemoval,andContainmentSpraySystems,"
havethepotentialtodevelopvoidsandpocketsofentrainedgases.Maintainingthepump suctionanddischargepipingsufficientlyfullofwaterisnecessarytoensurethatthesystemwill g p p g y
y y
performproperlyandwillinjecttheflowassumedinthesafetyanalysesintotheRCSupon demand.Thiswillalsopreventpumpcavitation,waterhammer,andpumpingnoncondensable gas(e.g.,air,nitrogen,orhydrogen)intothereactorvesselfollowingaSafetyInjection(SI)signal orduringshutdowncooling.ConsistentwiththeresponsetoGL200801dated[DATE]andthe g
g p
[
]
NRC'sclosureoftheGenericLetteron[DATE],theproceduresimplementingtheGas ManagementProgramaddressthefollowingelements:
a.
Identificationofthesystems/subsystemsforwhichgasaccumulationismanaged; b
Identification of gas void monitoring frequencies and modifications thereto; b.
Identificationofgasvoidmonitoringfrequenciesandmodificationsthereto; c.
Identificationofacceptancecriteria; d.
Identificationofgasvoidmonitoringlocationsinsuctionanddischargepiping; e.
Proceduresfordocumentingandmanagingactivitiesanddata; g
g g f.
Proceduresdefiningcorrectiveactions;and g.
Identificationofmethodologyusedtodetermineacceptancecriteria.
17
Technical Specifications Task Force A Joint Owners Group Activity TSTF What are the OnGoing Requirements on Gas WhataretheOn GoingRequirementsonGas Management?
- Testing Evaluation TestingEvaluation
- Plantprocedureswerereviewedandrevised,asrequired,andnew proceduresweredeveloped.
Procedures addressed or were modified to address the manual
- Proceduresaddressedorweremodifiedtoaddressthemanual operationoftheRHR/DHRsystemincludingassurancethatthe RHR/DHRsystemissufficientlyfullofwatertoperformitssafety function and how pump operation is monitored by plant personnel functionandhowpumpoperationismonitoredbyplantpersonnel.
- Proceduresweremodifiedasneededtoensuregasintrusiondoesnot occurasaresultofinadvertentdrainingduetosystemrealignmentsor incorrect maintenance procedures incorrectmaintenanceprocedures.
- Proceduresweremodifiedasneededtorequireanydiscoveredgas voidstobedocumented,dispositioned,andtrended.
These on going requirements related to design and procedures are Theseongoingrequirementsrelatedtodesignandproceduresare capturedintheproposedFSARGasManagementProgramandin implementingplantprocedures.
18
Technical Specifications Task Force A Joint Owners Group Activity TSTF What are the OnGoing Requirements on Gas WhataretheOn GoingRequirementsonGas Management?
- Corrective Actions CorrectiveActions
- IntheirresponsetotheGL,licenseesexplainedthethreshold (acceptancecriteria)forentryintotheCorrectiveActionProgram (CAP) and how the CAP addresses disposition and trending (CAP)andhowtheCAPaddressesdispositionandtrending.
- ForgasvoidslessthantheCAPthreshold,licenseesdescribedhow thesegasvoidsaredocumentedandtrendedasameanstodetect system changes that may be indicative of degradation leading to systemchangesthatmaybeindicativeofdegradationleadingto futuregasvoiding.
- TheCAPisinaccordancewiththelicenseesAppendixBQA program.
- Thedocumentationandtrendingrequirementsarecaptured intheproposedFSARGasManagementProgram.
p p
g g
19
Technical Specifications Task Force A Joint Owners Group Activity TSTF What are the OnGoing Requirements on Gas WhataretheOn GoingRequirementsonGas Management?
- All of the ongoing requirements are captured in the Alloftheon goingrequirementsarecapturedinthe changesproposedinTSTF523.
20
Technical Specifications Task Force A Joint Owners Group Activity TSTF What are the OnGoing Requirements on Gas WhataretheOn GoingRequirementsonGas Management?
- There are only a few ongoing actions that resemble Thereareonlyafewon goingactionsthatresemble anyrequirementsinTS:
- EntrainedgasisanaspectofsystemOperability.
- TSTF523capturesthisintheLCOBases.IntheISTS,thedetailsof systemOperabilityarealwaysdescribedintheLCOBases.
- Procedural acceptance criteria on gas volume for each Proceduralacceptancecriteriaongasvolumeforeach pipingsegmentineachsystemwheregascanaccumulate.
- TheFSARChapter6andChapter15analyseswhichformthebasis f th TS LCO d t
ifi t
f t
i d
oftheTSLCOsdonotassumespecificamountsofentrainedgas, onlythatthesystemsperformasrequired.Therefore,thereisno requirementappropriateforTSbeyondtheexistingrequirement that the system be Operable thatthesystembeOperable.
21
Technical Specifications Task Force A Joint Owners Group Activity TSTF What are the OnGoing Requirements on Gas WhataretheOn GoingRequirementsonGas Management?
- Proceduresrelatedtofillandventactivitiesandother systemmanipulationsthatcouldinduceentrainedgasand procedurestorequireanydiscoveredgasvoidstobe documented dispositioned and trended documented,dispositioned,andtrended.
- ProcedurerequirementsarealreadyaddressedinTS5.4.Itreferences RegulatoryGuide1.33whichspecificallyaddressesfillandvent operations.
operations.
- Documentation,dispositionandtrendingofgasvoidsfallsunderthe AppendixBQualityAssuranceProgramasaconditionadversetoquality.
- AppendixB,CriteriaVandXIrequireprocedures"appropriatetothe pp q
p pp p
circumstances,"andincluding"appropriatequantitativeorqualitative acceptancecriteria."
- Weidentifiednoongoinggasmanagementrequirements g
g g g
q thatarenotadequatelyaddressedbyexistingrequirements ortherequirementsproposedinTSTF523.
22
Technical Specifications Task Force A Joint Owners Group Activity TSTF h
h i
i
?
WhyNotPuttheRequirementsinTS?
- ItwouldbecontrarytoNRCpolicy("FinalPolicyStatement y
p y (
y forTechnicalSpecificationImprovementsforNuclear PowerPlants"):
since 1969 there has been a trend towards including in since1969therehasbeenatrendtowardsincludingin technicalspecificationsnotonlythoserequirementsderivedfrom theanalysesandevaluationincludedintheplant'ssafetyanalysis report but also essentially all other NRC requirements governing reportbutalsoessentiallyallotherNRCrequirementsgoverning theoperationofnuclearpowerplants.IntheCommission's view,thishasdivertedbothNRCstaffandlicenseeattentionfrom themoreimportantrequirementsinthesedocumentstothe p
q extentthatithasresultedinanadversebutunquantifiableimpact onsafety."
23
Technical Specifications Task Force A Joint Owners Group Activity TSTF h
h i
i
?
WhyNotPuttheRequirementsinTS?
- TheFinalPolicyStatementalsostates:
y
- "ThepurposeofTechnicalSpecificationsistoimposethose conditionsorlimitationsuponreactoroperationnecessaryto obviatethepossibilityofanabnormalsituationoreventgivingrise p
y g
g toanimmediatethreattothepublichealthandsafetyby identifyingthosefeaturesthatareofcontrollingimportanceto safetyandestablishingonthemcertainconditionsofoperation whichcannotbechangedwithoutpriorCommissionapproval.
- TheISTS,whichweredevelopedinresponsetotheFinalPolicy Statement,retainedintheTechSpecsthoseparametersthatcanbe tiedbacktospecificsafetyanalysisassumptions,suchassetpoints, tankvolumes,pumpflowrates,etc.
- Gasmanagementissimplyoneofamyriadoffactorsthatsupport systemOperability.Itisnotof"controllingimportance"andthereare nospecificsafetyanalysisassumptionsonwhichtobaseaTS requirement.
24
Technical Specifications Task Force A Joint Owners Group Activity TSTF h
h i
i
?
WhyNotPuttheRequirementsinTS?
- We determined a Surveillance is not appropriate for WedeterminedaSurveillanceisnotappropriatefor thisapplication:
- Surveillancesrequireperformanceofspecificverificationstomeet d
h f
d statedacceptancecriteriawithinfixedFrequencies.
- ImpositionofanSRwithspecificmethods,scope,andacceptance criteriawouldlikelyresultinsubstantialoverperformanceofsome i i i d
d f
f h
d di l
activitiesandunderperformanceofothers,dependingonplant design,andfuturemodificationasmoreislearned,bothgenerically andplantspecifically.
25
Technical Specifications Task Force A Joint Owners Group Activity TSTF h
h i
i
?
WhyNotPuttheRequirementsinTS?
- We determined a Surveillance is not appropriate for WedeterminedaSurveillanceisnotappropriatefor thisapplication:
- AspecificSRisnotnecessarytomeettherequirementsof10CFR (d)( ) b h
f d
b dd d h
50.36(d)(3),becausethespecificconsiderationsareembeddedinthe LCO,whichsatisfiestherequirementsforLCOsin10CFR50.36(d)(2)(i) and(d)(2)(ii)(C).
(d)(3)
S ill i
i l
i
- (d)(3)states:Surveillancerequirementsarerequirementsrelating totest,calibration,orinspectiontoassurethatthenecessary qualityofsystemsandcomponentsismaintained,thatfacility operation will be within safety limits and that the limiting operationwillbewithinsafetylimits,andthatthelimiting conditionsforoperationwillbemet.
- ThisisconsistentwithsimilarOperabilityconsiderations(seismic, lubrication EQ cooling etc )
lubrication,EQ,cooling,etc.)
26
Technical Specifications Task Force A Joint Owners Group Activity TSTF h
h i
i
?
WhyNotPuttheRequirementsinTS?
- The industry considered creating a TS Administrative TheindustryconsideredcreatingaTSAdministrative Controlsprogramthatstatedtheminimum requirementsforthelicensee'sprogramtomanage entrainedgas.
27
Technical Specifications Task Force A Joint Owners Group Activity TSTF h
h i
i
?
WhyNotPuttheRequirementsinTS?
- Aprogramforsafetysystemgasmanagementwouldnotmeet p
g y y g
g thedefinitionofAdministrativeControlsprovidedin10CFR 50.36(d)(5).
"Ad i i t ti t
l th i i l ti t
- "Administrativecontrolsaretheprovisionsrelatingto organizationandmanagement,procedures, recordkeeping,reviewandaudit,andreportingnecessary toassureoperationofthefacilityinasafemanner."
- Gasmanagementdoesnotmeetanyofthosecriteriaother than "procedures" which is already addressed by the TS than procedures whichisalreadyaddressedbytheTS Section5.4,"Procedures,"referencetoRegulatoryGuide1.33 whichrequiresproceduresforfillandventoperations.
28
Technical Specifications Task Force A Joint Owners Group Activity TSTF h
h i
i
?
WhyNotPuttheRequirementsinTS?
- A TS Administrative Controls program is not ATSAdministrativeControlsprogramisnot appropriateforthisapplication:
- EntrainedgasisoneofmanyaspectsofOperability,mostof whicharenotexplicitlystatedinTS,suchascoolingwater, flowbalancing,recirculationflow,componentintegrity,and lubrication.
Justlikeentrainedgas,theseotheraspectsofOperabilityare establishedandverifiedbylicenseedesigncontrol, operations and maintenance programs all of which are operationsandmaintenanceprograms,allofwhichare subjecttotheQualityAssurancerequirementsestablishedin 10CFR50,AppendixBandthedefinitionofOperability.
f h
f b l
- CreatingaTSprogramforthisoneaspectofOperability wouldbeinconsistentwithNRCprioractionsandtheTS format.
29
Technical Specifications Task Force A Joint Owners Group Activity TSTF h
h i
i
?
WhyNotPuttheRequirementsinTS?
- In the Standard Technical Specifications, the LCO IntheStandardTechnicalSpecifications,theLCO Bases describethespecificrequirementsforasystem tobeOperable.
- TSTF523proposestoexpandtheLCOBaseswitha statementsimilarto:
- "Managementofgasvoidsisimportantto[systemname]
OPERABILITY.Gasvoidsaremanagedbyplantprocedures and processes as described in the Final Safety Analysis andprocesses,asdescribedintheFinalSafetyAnalysis Report(Ref.X)."
30
Technical Specifications Task Force A Joint Owners Group Activity TSTF Placing the Gas Management Program in the FSAR PlacingtheGasManagementProgramintheFSAR ProvidesDurableGuidance
- InresponsestomostGLslicenseesmakecommitmentsto p
takecertainactions.Thesecommitmentscanbemanaged underNEI9904.
We have demonstrated it has been effective for over 20 years for
- Wehavedemonstratedithasbeeneffectiveforover20yearsfor manyGLs.
- InTSTF523,theindustryisproposingtoplacethedetailsof theGasManagementProgramintheFSARtoensure the durabilityoftherequirements.
- Changes to the Gas Management Program would be ChangestotheGasManagementProgramwouldbe evaluatedunder10CFR50.59.
- Theprovisions10CFR50.59areappropriatetoensurean adequatereviewofanychangestotheGasManagement Programwillbeperformed.
31
Technical Specifications Task Force A Joint Owners Group Activity TSTF Placing the Gas Management Program in the FSAR PlacingtheGasManagementProgramintheFSAR ProvidesDurableGuidance
- Example:
Example:
- AplanthasincorporatedtheGasManagementProgramproposedin TSTF523intheirFSAR.
- These are the essential elements of a program that manages gas
- Thesearetheessentialelementsofaprogramthatmanagesgas accumulationsuchthattheaffectedsystemsremainOperable.
- TheNRCcaninspectthelicenseesimplementationofthisprogramin plant procedures as was shown for other Generic Letters plantprocedures,aswasshownforotherGenericLetters.
- Supposethelicenseedesirestochangetheattribute:
"b.Identificationofgasvoidmonitoringlocationsinsuctionand discharge piping;"
dischargepiping; suchthatthedischargepipingisremovedfromthescopeofthe monitoringlocations.
32
Technical Specifications Task Force A Joint Owners Group Activity TSTF Placing the Gas Management Program in the FSAR PlacingtheGasManagementProgramintheFSAR ProvidesDurableGuidance
- Taking each of the criteria of 10 CFR 50.59 in order:
Takingeachofthecriteriaof10CFR50.59inorder:
- (i)Resultinmorethanaminimalincreaseinthefrequencyof occurrenceofanaccidentpreviouslyevaluatedinthefinalsafety analysis report (as updated) analysisreport(asupdated).
- Voidsindischargepipingwouldhavenobearingonthelikelihood ofadesignbasisaccident(DBA)occurring.
33
Technical Specifications Task Force A Joint Owners Group Activity TSTF Placing the Gas Management Program in the FSAR PlacingtheGasManagementProgramintheFSAR ProvidesDurableGuidance
- Taking each of the criteria of 10 CFR 50.59 in order:
Takingeachofthecriteriaof10CFR50.59inorder:
- (ii)Resultinmorethanaminimalincreaseinthelikelihoodofoccurrenceofa malfunctionofastructure,system,orcomponent(SSC)importanttosafety previouslyevaluatedinthefinalsafetyanalysisreport(asupdated);
- Voidsindischargepipingcertainlycouldresultinmorethanaminimal increaseinthelikelihoodofoccurrenceofamalfunctionoftheaffected system(s).Thelicenseewouldhavetohavedonesomethingconclusiveto t
id i th di h
i i h
d i
difi ti t
preventvoidsinthedischargepiping,suchasdesignmodifications,to allowthisquestiontobeanswered"no."Evenso,thelicenseecannot precludethosetimeswhenthesystemhasbeenopenedformaintenance, andfailuretofollowproperfillandventprocedures,intheabsenceof p
p p
monitoringthedischargepipingafterfillandvent,wouldprobablyresult inmorethanaminimalincreaseinthelikelihoodofmalfunctiondueto undetectedvoids.
34
Technical Specifications Task Force A Joint Owners Group Activity TSTF Placing the Gas Management Program in the FSAR PlacingtheGasManagementProgramintheFSAR ProvidesDurableGuidance
- Taking each of the criteria of 10 CFR 50.59 in order:
Takingeachofthecriteriaof10CFR50.59inorder:
- (iii)Resultinmorethanaminimalincreaseintheconsequencesofan accidentpreviouslyevaluatedinthefinalsafetyanalysisreport(as updated);
updated);
- IfCriterioniicannotbeansweredas"no,"thiscriterionwouldalso requireNRCpriorreview.FailureoftheECCStoperformas designed due to gas voids in discharge piping would almost designedduetogasvoidsindischargepipingwouldalmost certainlyresultinmorethanaminimalincreaseinconsequences (radiologicaldosetothegeneralpublicandcontrolroom operators).
p
)
35
Technical Specifications Task Force A Joint Owners Group Activity TSTF Placing the Gas Management Program in the FSAR PlacingtheGasManagementProgramintheFSAR ProvidesDurableGuidance
- Taking each of the criteria of 10 CFR 50.59 in order:
Takingeachofthecriteriaof10CFR50.59inorder:
- (iv)Resultinmorethanaminimalincreaseintheconsequencesofa malfunctionofanSSCimportanttosafetypreviouslyevaluatedinthe final safety analysis report (as updated);
finalsafetyanalysisreport(asupdated);
- Theconsequencesoffailureofasafetysystemarenotdirectly evaluatedintheaccidentanalysis.Itistheconsequencesofthe DBA that are evaluated and the failure of a system important to DBAthatareevaluated,andthefailureofasystemimportantto safetycontributestothoseconsequences,whichisaddressedin Criterion(iii).
36
Technical Specifications Task Force A Joint Owners Group Activity TSTF Placing the Gas Management Program in the FSAR PlacingtheGasManagementProgramintheFSAR ProvidesDurableGuidance
- Taking each of the criteria of 10 CFR 50.59 in order:
Takingeachofthecriteriaof10CFR50.59inorder:
- (v)Createapossibilityforanaccidentofadifferenttypethanany previouslyevaluatedinthefinalsafetyanalysisreport(asupdated);
- The proposed change to remove the discharge piping from the
- Theproposedchangetoremovethedischargepipingfromthe monitoringlocationswouldnotcreateanewtypeofaccident.
37
Technical Specifications Task Force A Joint Owners Group Activity TSTF Placing the Gas Management Program in the FSAR PlacingtheGasManagementProgramintheFSAR ProvidesDurableGuidance
- Taking each of the criteria of 10 CFR 50.59 in order:
Takingeachofthecriteriaof10CFR50.59inorder:
- (vi)CreateapossibilityforamalfunctionofanSSCimportanttosafety withadifferentresultthananypreviouslyevaluatedinthefinalsafety analysis report (as updated);
analysisreport(asupdated);
- Theresultofconcernisradiologicaldosestothegeneralpublic andcontrolroomoperators.Theeffectsoftheproposedchange to remove the discharge piping from monitoring do not create a toremovethedischargepipingfrommonitoringdonotcreatea newresult,butratheraffectthemagnitudeofthepreviously evaluatedresult,whichisaddressedinCriterionii.
38
Technical Specifications Task Force A Joint Owners Group Activity TSTF Placing the Gas Management Program in the FSAR PlacingtheGasManagementProgramintheFSAR ProvidesDurableGuidance
- Taking each of the criteria of 10 CFR 50.59 in order:
Takingeachofthecriteriaof10CFR50.59inorder:
- (vii)Resultinadesignbasislimitforafissionproductbarrieras describedintheFSAR(asupdated)beingexceededoraltered;or
- Unless the licensee can conclusively rule out the potential for
- Unlessthelicenseecanconclusivelyruleoutthepotentialfor voidsindischargepiping,thiscriterionisnotmet.Failureofthe ECCSduetovoidsinthedischargepipingwouldcertainlyadversely impact calculated peak clad temperatures It would be well within impactcalculatedpeakcladtemperatures.Itwouldbewellwithin therealmofpossibilitythatthecriteriaof10CFR50.46mightbe exceeded.
39
Technical Specifications Task Force A Joint Owners Group Activity TSTF Placing the Gas Management Program in the FSAR PlacingtheGasManagementProgramintheFSAR ProvidesDurableGuidance
- Taking each of the criteria of 10 CFR 50.59 in order:
Takingeachofthecriteriaof10CFR50.59inorder:
- (viii)Resultinadeparturefromamethodofevaluationdescribedin theFSAR(asupdated)usedinestablishingthedesignbasesorinthe safety analyses safetyanalyses.
- TheproposedGasManagementProgramdoesnotreferenceany methodologies.
40
Technical Specifications Task Force A Joint Owners Group Activity TSTF Placing the Gas Management Program in the FSAR PlacingtheGasManagementProgramintheFSAR ProvidesDurableGuidance
- Therefore, placing the Gas Management Program in Therefore,placingtheGasManagementProgramin theFSARprovidesdurableguidance.
- ChangestotheGasManagementProgramwouldbe g
g g
evaluatedunder10CFR50.59whichwillensurean adequatereviewofanychangeswillbeperformed, whichmayincludeNRCpriorreviewandapproval per10CFR50.90.
41
Technical Specifications Task Force A Joint Owners Group Activity TSTF What is the Appropriate Regulatory Mechanism to WhatistheAppropriateRegulatoryMechanismto CapturetheOngoingRequirementsfromtheGL?
- Therefore, the appropriate regulatory mechanisms to Therefore,theappropriateregulatorymechanismsto capturetheongoingrequirementsfromtheGLare:
- Reinforcementthatgasmanagementisanimportant aspectofOperabilityintheTSBases,
- Capturingtheongoingaspectsofthelicenseeresponseto the GL in a Gas Management Program in the FSAR theGLinaGasManagementProgramintheFSAR.
- ReplacetheexistingSRswiththeGasManagement Programrequirements.
42