Text
NRC Staff Comments Draft TSTF-577 Pre-Submittal Review NRR/DNRL/NCSG Public Meeting May 4, 2020
Background:
- The Steam Generator Task Force (SGTF) initially discussed modifying steam generator (SG) Technical Specifications (TS) during February 2019 and June 2019 public meetings
- Public meetings related to draft TSTF-577:
- November 2019
- February 2020 2
Background:
SG TS History
- Original SG TS
- Prescriptive surveillance requirements
- Mill-annealed (MA) Alloy 600 degradation -
inspections beyond TS requirements to maintain tube integrity
- TSTF-449 (2005)
- Performance based TS framework
- Changed regulatory focus to tube integrity
- TSTF-510 (2011)
- Extended inspection periods and eliminated mid-point requirements 3
NRC Staff Perspective
- The existing licensee SG programs and NRC regulatory framework are effective - good operating experience
- No cracking in thermally-treated (TT) Alloy 690 tubing
- Alloy 600TT tubing performance shows improvement compared to Alloy 600MA
-Not clear to NRC staff if cracking susceptibility will be limited to a small percentage of tubes 4
Staff Discussion - Alloy 600TT
- The proposed maximum 72 Effective Full Power Months (EFPM) between inspections:
- Recent cracking in non-high stress Alloy 600TT tubes at two plants Fall 2019 - Top of tube support plate (TSP) (deposits)
Spring 2020 - Upper TSP (dent locations)
- Consistent operating experience or indicative of a larger susceptible population size?
5
Staff Discussion - Alloy 600TT
- The proposed maximum 72 EFPM between inspections:
- Staff needs to improve understanding of how Alloy 600TT operating experience was used to develop the crack initiation/growth technical basis presented in February 24, 2020, SGTF slides
- For example, which cracks were used in the trending and details of flaw comparisons 6
Staff Discussion - Inspection
- The TSTF proposes longer times between inspections for Alloys 600TT and 690TT
- If plants were permitted to go beyond current TS maximum intervals between inspections:
- Robust inspection with advanced probes needed for improved probability of detection
- A requirement for minimum advanced probe inspections in the EPRI Guidelines seems appropriate to NRC staff 7
Staff Comments on Draft TSTF-577 (Pre-submittal Review)
- Higher-level comments in this presentation
- Additional NRC staff comments will be provided in writing to TSTF 8