MONTHYEARML24289A0342024-08-0808 August 2024 Discussion of NRC Staff Comments on Draft TSTF-585, Revision 3, Revise LCO 3.0.3 to Require Managing Risk ML24129A0662024-05-0808 May 2024 5_8_24 Meeting Handouts - History of Traveler Adoption ML24129A0652024-05-0808 May 2024 5_8_24 Meeting Handouts - Active Traveler Summary Report and Priorities ML24129A0672024-05-0808 May 2024 5_8_24 Meeting Handouts - Proposed Change to the PWR ECCS Mode 4 Requirements ML24044A1402024-02-0808 February 2024 TSTF Handout for 02/08/2024 Quarterly Meeting ML24038A3492024-02-0707 February 2024 NRC Comments for Pre-submittal Meeting TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML23257A1582023-09-18018 September 2023 NRC Staff Feedback Draft TSTF-601, Extend Shield Building Completion Time After Refueling for Pre-submittal Meeting on 9/18/23 ML23033A3842023-02-0202 February 2023 February 9, 2023, Meeting Handout: NRC Staff Comments on TSTF-576 Revision 2 (Draft), SRV Requirements ML22298A2162022-10-25025 October 2022 TSTF Meeting Handout TSTF-585 and the Maintenance Rule ML22298A2172022-10-24024 October 2022 TSTF Meeting Handout Strategic Improvements to TS and TS-Related Processes ML22298A2152022-10-20020 October 2022 TSTF Meeting Handout Natural Phenomena and Operability Workshop ML22056A2932022-02-24024 February 2022 2/24/2022 Meeting Handout - Active Traveler Summary Report ML22056A2942022-02-24024 February 2022 2/24/2022 Meeting Handout - TSTF 2021 in Review ML22038A6032022-02-10010 February 2022 Summary of January 10, 2022, Meeting with the Technical Specifications Task Force Draft Traveler TSTF-589 Eliminate Automatic Diesel Generator Start During Shutdown ML22013B1422022-02-0101 February 2022 TSTF-576 Workshop February 2022 - NRC Presentation ML21217A0692021-08-0505 August 2021 Meeting Handout - Active Traveler Summary Report ML21158A0902021-06-0707 June 2021 Technical Specifications Branch Feedback/Comments on Draft TSTF-585, Revise LCO 3.0.3 ML21126A0712021-05-0606 May 2021 5/6/2021 Meeting Handout - Interaction of Technical Specification Surveillances and 10 CFR 50.69 ML21126A0732021-05-0606 May 2021 5/6/2021 Meeting Handout - Active Traveler Summary Report ML21126A0722021-05-0606 May 2021 5/6/2021 Meeting Handout - Expected TSTF-577 Submittals ML21029A3082021-01-29029 January 2021 Trio Public Meeting Slides (Thursday, February 4, 2021) ML21007A1112021-01-0707 January 2021 TSTF-577, NRC Staff Slides from Public Meeting on 1_7_2021 ML20329A3412020-11-24024 November 2020 TSTF-576 Example Scenarios for 12/7/2020 Meeting ML20287A2632020-10-13013 October 2020 TSTF Presentation Proposal to Improve the Core Operating Limits Report (COLR) ML20125A0922020-05-0404 May 2020 May 4, 2020, Pre-submittal Meeting Handout Staff Comments Draft TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML20065J9322020-03-0505 March 2020 March 5 2020 Meeting Handout, Agenda Item VA - Proposal to Revise LCO 3.0.3 ML20069F2882020-03-0505 March 2020 March 5 2020 TSTF Quarterly Meeting Handout, Agenda Item Iia - 2019 in Review ML20065J9902020-03-0505 March 2020 March 5 2020 TSTF Quarterly Meeting Handout, Agenda Item Iiib - Generic RAIs for LARs to Adopt TSTF-505 Rict ML20065J9332020-03-0505 March 2020 March 5 2020 Meeting Handout, Agenda Item IV - Active Traveler Summary Report and Priorities ML20065J9342020-03-0505 March 2020 March 5 2020 Meeting Handout, Agenda Item Iia - 2019 in Review ML20069F2852020-01-0101 January 2020 March 5 2020 TSTF Quarterly Meeting Handout, Agenda Item Via - TSTF Charter Statement 2020 ML19267A1592019-09-24024 September 2019 TSTF Handout for October 16, 2019, Meeting: TSTF-493 Questions ML19259A2082019-09-12012 September 2019 TSTF Presentation from TSTF-576, S/Rv Requirements Pre-submittal Meeting on September 12, 2019 TSTF-19-07, TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-4932019-06-18018 June 2019 TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-493 ML19056A4232019-02-21021 February 2019 Meeting Attendees 02/21/2019 ML19056A4242019-02-21021 February 2019 TSTF-568 Proposed Path Forward from 2/21/2019 Meeting ML19056A4262019-02-21021 February 2019 Rewording of TSTF Revision to TSTF-541, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed ML18312A3662018-11-0808 November 2018 Handout from 11/8/2018 TSTF Meeting for Agenda Items V.A and V.B Active Traveler Summary Report and Traveler Review Priorities ML18312A3672018-11-0808 November 2018 Handout from 11/08/2018 TSTF Meeting for Agenda Item Ii.B.C November 2018 Traveler Review Schedule Changes ML18221A5712018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 4.A TSTF Response TSTF-51 -286 -471 ML18221A5722018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 3.A - DNP LAR Analysis ML18221A5742018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 5.A.6 - TSTF-565R1 ML18221A5752018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 5.A Active Traveler Summary Report ML18221A5772018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 4.C - TSTF-542 Adoption Status ML18221A5812018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 5.A.6 NRC Feedback Re TSTF-568 Evaluation of STS 3.6.3.2 ML18221A5732018-08-0606 August 2018 August 9, 2018, Meeting Agenda Item 7.A - Is the Table of Contents Part of the Technical Specifications? ML18142B0372018-05-17017 May 2018 May 17, 2018, Meeting Agenda Item 2.A - TSTF-563 Coordinated Submittal Pilot ML18142B0352018-05-17017 May 2018 May 17, 2018, Meeting Agenda Item 4.B - TSTF-547 Issue ML18142B0312018-05-17017 May 2018 May 17, 2018, Meeting Agenda Item 8.A - T Traveler Candidates ML18142B0332018-05-17017 May 2018 May 17, 2018, Meeting Agenda Item 8.A - Approved Unincorporated Travelers 2024-08-08
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24289A0342024-08-0808 August 2024 Discussion of NRC Staff Comments on Draft TSTF-585, Revision 3, Revise LCO 3.0.3 to Require Managing Risk ML22298A2162022-10-25025 October 2022 TSTF Meeting Handout TSTF-585 and the Maintenance Rule ML22298A2172022-10-24024 October 2022 TSTF Meeting Handout Strategic Improvements to TS and TS-Related Processes ML22013B1422022-02-0101 February 2022 TSTF-576 Workshop February 2022 - NRC Presentation ML21007A1112021-01-0707 January 2021 TSTF-577, NRC Staff Slides from Public Meeting on 1_7_2021 ML20329A3412020-11-24024 November 2020 TSTF-576 Example Scenarios for 12/7/2020 Meeting ML20287A2632020-10-13013 October 2020 TSTF Presentation Proposal to Improve the Core Operating Limits Report (COLR) ML20276A1352020-10-0202 October 2020 TSTF Proposal to Reevaluate Application of 10 CFR 50.36(c)(2)(ii) Criterion 4 ML20125A0922020-05-0404 May 2020 May 4, 2020, Pre-submittal Meeting Handout Staff Comments Draft TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML20065J9322020-03-0505 March 2020 March 5 2020 Meeting Handout, Agenda Item VA - Proposal to Revise LCO 3.0.3 ML19056A4242019-02-21021 February 2019 TSTF-568 Proposed Path Forward from 2/21/2019 Meeting ML19031A5442019-01-29029 January 2019 Attachment - Draft Revision to TSTF-541, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed. ML17033A0352017-01-31031 January 2017 Meeting Handout TSTF-567, GSI-191, Presubmittal Meeting Slides ML16054A5312016-02-18018 February 2016 TSTF Quarterly Meeting Handout Proposed Reactor Coolant Leakage Requirements Traveler ML16054A5272016-02-18018 February 2016 TSTF Quarterly Meeting Handout Addressing Channel Components Calibration Frequency Under the SFCP ML15084A2112013-01-16016 January 2013 TSTF Handout from January 17, 2013, Meeting Relocation of Calculated Peak Containment Internal Pressure (Pa) to Licensee Control ML15084A2132013-01-16016 January 2013 TSTF Handout from January 17, 2013, Meeting Proposed Generic Traveler to Address Inoperable Room Coolers ML13169A3652012-10-18018 October 2012 Meeting Handout - SF-SSF Definition Presentation ML1132201642011-11-17017 November 2011 TSTF Presentation Revision to TSTF-523 ML1122000772011-08-31031 August 2011 8/4/2011 - Presentation for Meeting with the Technical Specifications Task Force and the Nuclear Energy Institute Regarding Gas Accumulation Issues and TSTF-523 ML11223A0612011-08-0303 August 2011 NEI Gat Presentation at 8/4/11 Meeting - Purpose of NEI 09-10, Guidelines for Effective Prevention and Management of System Gas Accumulation. ML11223A0622011-08-0303 August 2011 8/4/11 -TSTF Presentation at Meeting with NRC and NEI Regarding Gas Accumulation Issues and TSTF-523, TSTF Response to NRC Letter Dated May 25, 2011. ML11224A1172011-08-0303 August 2011 Meeting Handout - DAEC Proposal to Consolidate Identical SRs After SFCP Adoption ML11224A1192011-08-0303 August 2011 Meeting Handout - TSTF Concerns with the Proposed NFPA-805 License Conditions ML11224A1202011-08-0303 August 2011 Meeting Handout - Compliance and Safety Concerns with Required Actions 3.8.1.B.3.1 and B.3.2 ML1101400552010-01-12012 January 2010 TSTF-523 Meeting Presentation ML0916301772009-06-0404 June 2009 Technical Specification Task Force Presentation for Meeting to Discuss Status of Current and Planned TSTF Travelers, and Process and Administrative Issues of Mutual Interest ML0913903782009-05-19019 May 2009 Proposed Technical Specification Approach in Response to Generic Letter 2008-01 ML0832408252008-11-24024 November 2008 Enclosure 2 - Handout - TSTF Presentation Discussions on Industry Concerns Regarding Technical Specification Branch Positions and TSTF-493, Rev. 3, Clarify Application of Setpoint Methodology for LSSS Functions. 2024-08-08
[Table view] |
Text
TSTF-577 NRC Review Status 1-7-2021 NRR/DNRL/NCSG
Outline
- Background/TSTF-577 History
- Audit - Alloy 600TT SG Tubing
Objective
- Communicate NRC TSTF-577 Review Status and NRC Staff Position
Steam Generators Safety Significance
- SG tubes form the majority of RCS boundary, relied on to maintain primary system pressure/inventory
- Unique role - remove heat from the primary system
- SGTR DBA - rupture of a single tube
- For every other DBA, SG tube integrity is assumed
- SG tube failures can result in containment bypass
- SG tube integrity is necessary to ensure the tubes are capable of performing their intended safety functions 4
Background
- Public Meeting Dates - February 13, June 27, November 12, and November 14, 2019; and January 22, February 24, May 4, and October 28, 2020
TSTF-577 Proposed Changes Compared to Existing TS Item A600 MA A600TT A690 Inspect Not To 24 EFPM TSTF-510 (48 EFPM) TSTF-510 (72 EFPM)
Exceed No change TSTF-577 (72 EFPM, TSTF-577 (96 EFPM, 4 cycles) 4 or 5 cycles)
Inspect 100% 60 EFPM to 120, 96, 72 EFPM to 144, 120, 96, 72 EFPM tubes within 24 EFPM 72 EFPM to 96 EFPM (Inspection period)
Mid-point inspect Previously Previously Previously requirement eliminated eliminated eliminated Cracking If crack indications are found, then the next inspection for each potentially affected SG shall not exceed 24 EFPM or one RFO, whichever results in more inspections highlight = proposed TSTF-577 changes Page 6
Alloy 600TT Audit Background
- EPRI Audit - August 17 to September 24, 2020
- Audit Plan and Summary (ML20216A673)
- Gain a better understanding of information supporting the proposed inspection interval for Alloy 600TT SG tubing in TSTF-577
- Identify information that will require docketing to support the basis for a regulatory decision 7
A600TT Audit Key Staff Takeaways
- Substantial industry work supporting Alloy 600TT generic operational assessments (OA)
- Excluding tube end cracking (H* ARC), 205 cracks in fleet, substantial number present in data look back
- Intertek OA - model development continued over the course of audit, final results support 72 EFPM
- Base case (crack growth rates estimated by 600TT fleet eddy current data) and sensitivity study case (EPRI typical default crack growth rates) support different time intervals 8
A600TT Audit Key Takeaways (2)
- Fully probabilistic OAs required to obtain 72 EFPM
- OA process is complex and requires highly experienced tube integrity engineers. OA models contain many available refinements
- Crack growths estimated from eddy current sizing contain large uncertainties
- How does the plant SG inspection POD compare to the eddy current technique POD?
- Margin to accommodate future degradation surprises 9
TSTF-577 Draft RAI Responses Feedback
- RAI #1: 100% inspection past or future (Alloy 600TT)
- RAI #3: AP1000 operating experience reference removed
- RAI #4: inspection with enhanced probes
- No staff comments on the other draft RAI responses 10
Loose Parts Management
- Issue - longer primary inspection intervals may increase tubing susceptibility to loose part damage
- Plant operating experience with loose parts varies
- Design, loose part strainers
- Primary inspection strategy and technique POD
- Secondary inspections (FOSAR) frequency
- Foreign material exclusion program effectiveness
- Basis for inspection approach differences not always clear to NRC staff
- Development of a comprehensive industry strategy based on experience, analysis, and with minimum requirements, seems prudent to NRC staff 11
Staff Alloy 600TT Deliberation Inputs
- Alloy 600TT Audit Materials
- NCSG SG team internal debate
- NRC contractor - former NRC employee SG branch
- PRA Branch - initiating frequency sensitivity consultation
- RES/ANL support - eddy current expertise for data review
- Regional Inspectors feedback
NRC Staff Position
- Alloy 600MA/690TT intervals are acceptable
- Additional interaction needed on loose parts, EPRI Guideline changes, reporting template
- 54 EFPM (adds one cycle) for all plants
- Conditional 72 EFPM (adds two cycles) if:
(1) plants have no cracking history (excludes H* ARC) and (2) 100% enhanced probe inspections are performed
- If cracks detected, inspect next outage.
- Conditional relaxation to inspect at 2nd RFO if:
(1) 100% enhanced probe inspections are performed 13
Enhanced Inspections
- Tube end to tube end (except below H* distance) with probes equivalent to or better than array probe technology
- For regions where array probe technology is not possible, tube inspection techniques applied shall be capable of detecting all forms of existing and potential degradation in that region 14
Next Steps
- NRC staff requesting additional near term meeting to discuss SGTIR reporting template, loose parts strategy, and EPRI Guidelines revision
- A TSTF-577 revision will be needed to align with NRC staff position
- Staff will be drafting safety evaluation in parallel 15