MONTHYEARML24289A0342024-08-0808 August 2024 Discussion of NRC Staff Comments on Draft TSTF-585, Revision 3, Revise LCO 3.0.3 to Require Managing Risk ML24129A0662024-05-0808 May 2024 5_8_24 Meeting Handouts - History of Traveler Adoption ML24129A0652024-05-0808 May 2024 5_8_24 Meeting Handouts - Active Traveler Summary Report and Priorities ML24129A0672024-05-0808 May 2024 5_8_24 Meeting Handouts - Proposed Change to the PWR ECCS Mode 4 Requirements ML24044A1402024-02-0808 February 2024 TSTF Handout for 02/08/2024 Quarterly Meeting ML24038A3492024-02-0707 February 2024 NRC Comments for Pre-submittal Meeting TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML23257A1582023-09-18018 September 2023 NRC Staff Feedback Draft TSTF-601, Extend Shield Building Completion Time After Refueling for Pre-submittal Meeting on 9/18/23 ML23033A3842023-02-0202 February 2023 February 9, 2023, Meeting Handout: NRC Staff Comments on TSTF-576 Revision 2 (Draft), SRV Requirements ML22298A2162022-10-25025 October 2022 TSTF Meeting Handout TSTF-585 and the Maintenance Rule ML22298A2172022-10-24024 October 2022 TSTF Meeting Handout Strategic Improvements to TS and TS-Related Processes ML22298A2152022-10-20020 October 2022 TSTF Meeting Handout Natural Phenomena and Operability Workshop ML22056A2932022-02-24024 February 2022 2/24/2022 Meeting Handout - Active Traveler Summary Report ML22056A2942022-02-24024 February 2022 2/24/2022 Meeting Handout - TSTF 2021 in Review ML22038A6032022-02-10010 February 2022 Summary of January 10, 2022, Meeting with the Technical Specifications Task Force Draft Traveler TSTF-589 Eliminate Automatic Diesel Generator Start During Shutdown ML22013B1422022-02-0101 February 2022 TSTF-576 Workshop February 2022 - NRC Presentation ML21217A0692021-08-0505 August 2021 Meeting Handout - Active Traveler Summary Report ML21158A0902021-06-0707 June 2021 Technical Specifications Branch Feedback/Comments on Draft TSTF-585, Revise LCO 3.0.3 ML21126A0712021-05-0606 May 2021 5/6/2021 Meeting Handout - Interaction of Technical Specification Surveillances and 10 CFR 50.69 ML21126A0732021-05-0606 May 2021 5/6/2021 Meeting Handout - Active Traveler Summary Report ML21126A0722021-05-0606 May 2021 5/6/2021 Meeting Handout - Expected TSTF-577 Submittals ML21029A3082021-01-29029 January 2021 Trio Public Meeting Slides (Thursday, February 4, 2021) ML21007A1112021-01-0707 January 2021 TSTF-577, NRC Staff Slides from Public Meeting on 1_7_2021 ML20329A3412020-11-24024 November 2020 TSTF-576 Example Scenarios for 12/7/2020 Meeting ML20287A2632020-10-13013 October 2020 TSTF Presentation Proposal to Improve the Core Operating Limits Report (COLR) ML20125A0922020-05-0404 May 2020 May 4, 2020, Pre-submittal Meeting Handout Staff Comments Draft TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML20065J9322020-03-0505 March 2020 March 5 2020 Meeting Handout, Agenda Item VA - Proposal to Revise LCO 3.0.3 ML20069F2882020-03-0505 March 2020 March 5 2020 TSTF Quarterly Meeting Handout, Agenda Item Iia - 2019 in Review ML20065J9902020-03-0505 March 2020 March 5 2020 TSTF Quarterly Meeting Handout, Agenda Item Iiib - Generic RAIs for LARs to Adopt TSTF-505 Rict ML20065J9332020-03-0505 March 2020 March 5 2020 Meeting Handout, Agenda Item IV - Active Traveler Summary Report and Priorities ML20065J9342020-03-0505 March 2020 March 5 2020 Meeting Handout, Agenda Item Iia - 2019 in Review ML20069F2852020-01-0101 January 2020 March 5 2020 TSTF Quarterly Meeting Handout, Agenda Item Via - TSTF Charter Statement 2020 ML19267A1592019-09-24024 September 2019 TSTF Handout for October 16, 2019, Meeting: TSTF-493 Questions ML19259A2082019-09-12012 September 2019 TSTF Presentation from TSTF-576, S/Rv Requirements Pre-submittal Meeting on September 12, 2019 TSTF-19-07, TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-4932019-06-18018 June 2019 TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-493 ML19056A4232019-02-21021 February 2019 Meeting Attendees 02/21/2019 ML19056A4242019-02-21021 February 2019 TSTF-568 Proposed Path Forward from 2/21/2019 Meeting ML19056A4262019-02-21021 February 2019 Rewording of TSTF Revision to TSTF-541, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed ML18312A3662018-11-0808 November 2018 Handout from 11/8/2018 TSTF Meeting for Agenda Items V.A and V.B Active Traveler Summary Report and Traveler Review Priorities ML18312A3672018-11-0808 November 2018 Handout from 11/08/2018 TSTF Meeting for Agenda Item Ii.B.C November 2018 Traveler Review Schedule Changes ML18221A5712018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 4.A TSTF Response TSTF-51 -286 -471 ML18221A5722018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 3.A - DNP LAR Analysis ML18221A5742018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 5.A.6 - TSTF-565R1 ML18221A5752018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 5.A Active Traveler Summary Report ML18221A5772018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 4.C - TSTF-542 Adoption Status ML18221A5812018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 5.A.6 NRC Feedback Re TSTF-568 Evaluation of STS 3.6.3.2 ML18221A5732018-08-0606 August 2018 August 9, 2018, Meeting Agenda Item 7.A - Is the Table of Contents Part of the Technical Specifications? ML18142B0372018-05-17017 May 2018 May 17, 2018, Meeting Agenda Item 2.A - TSTF-563 Coordinated Submittal Pilot ML18142B0352018-05-17017 May 2018 May 17, 2018, Meeting Agenda Item 4.B - TSTF-547 Issue ML18142B0312018-05-17017 May 2018 May 17, 2018, Meeting Agenda Item 8.A - T Traveler Candidates ML18142B0332018-05-17017 May 2018 May 17, 2018, Meeting Agenda Item 8.A - Approved Unincorporated Travelers 2024-08-08
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24289A0342024-08-0808 August 2024 Discussion of NRC Staff Comments on Draft TSTF-585, Revision 3, Revise LCO 3.0.3 to Require Managing Risk ML22298A2162022-10-25025 October 2022 TSTF Meeting Handout TSTF-585 and the Maintenance Rule ML22298A2172022-10-24024 October 2022 TSTF Meeting Handout Strategic Improvements to TS and TS-Related Processes ML22013B1422022-02-0101 February 2022 TSTF-576 Workshop February 2022 - NRC Presentation ML21007A1112021-01-0707 January 2021 TSTF-577, NRC Staff Slides from Public Meeting on 1_7_2021 ML20329A3412020-11-24024 November 2020 TSTF-576 Example Scenarios for 12/7/2020 Meeting ML20287A2632020-10-13013 October 2020 TSTF Presentation Proposal to Improve the Core Operating Limits Report (COLR) ML20276A1352020-10-0202 October 2020 TSTF Proposal to Reevaluate Application of 10 CFR 50.36(c)(2)(ii) Criterion 4 ML20125A0922020-05-0404 May 2020 May 4, 2020, Pre-submittal Meeting Handout Staff Comments Draft TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML20065J9322020-03-0505 March 2020 March 5 2020 Meeting Handout, Agenda Item VA - Proposal to Revise LCO 3.0.3 ML19056A4242019-02-21021 February 2019 TSTF-568 Proposed Path Forward from 2/21/2019 Meeting ML19031A5442019-01-29029 January 2019 Attachment - Draft Revision to TSTF-541, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed. ML17033A0352017-01-31031 January 2017 Meeting Handout TSTF-567, GSI-191, Presubmittal Meeting Slides ML16054A5312016-02-18018 February 2016 TSTF Quarterly Meeting Handout Proposed Reactor Coolant Leakage Requirements Traveler ML16054A5272016-02-18018 February 2016 TSTF Quarterly Meeting Handout Addressing Channel Components Calibration Frequency Under the SFCP ML15084A2112013-01-16016 January 2013 TSTF Handout from January 17, 2013, Meeting Relocation of Calculated Peak Containment Internal Pressure (Pa) to Licensee Control ML15084A2132013-01-16016 January 2013 TSTF Handout from January 17, 2013, Meeting Proposed Generic Traveler to Address Inoperable Room Coolers ML13169A3652012-10-18018 October 2012 Meeting Handout - SF-SSF Definition Presentation ML1132201642011-11-17017 November 2011 TSTF Presentation Revision to TSTF-523 ML1122000772011-08-31031 August 2011 8/4/2011 - Presentation for Meeting with the Technical Specifications Task Force and the Nuclear Energy Institute Regarding Gas Accumulation Issues and TSTF-523 ML11223A0612011-08-0303 August 2011 NEI Gat Presentation at 8/4/11 Meeting - Purpose of NEI 09-10, Guidelines for Effective Prevention and Management of System Gas Accumulation. ML11223A0622011-08-0303 August 2011 8/4/11 -TSTF Presentation at Meeting with NRC and NEI Regarding Gas Accumulation Issues and TSTF-523, TSTF Response to NRC Letter Dated May 25, 2011. ML11224A1172011-08-0303 August 2011 Meeting Handout - DAEC Proposal to Consolidate Identical SRs After SFCP Adoption ML11224A1192011-08-0303 August 2011 Meeting Handout - TSTF Concerns with the Proposed NFPA-805 License Conditions ML11224A1202011-08-0303 August 2011 Meeting Handout - Compliance and Safety Concerns with Required Actions 3.8.1.B.3.1 and B.3.2 ML1101400552010-01-12012 January 2010 TSTF-523 Meeting Presentation ML0916301772009-06-0404 June 2009 Technical Specification Task Force Presentation for Meeting to Discuss Status of Current and Planned TSTF Travelers, and Process and Administrative Issues of Mutual Interest ML0913903782009-05-19019 May 2009 Proposed Technical Specification Approach in Response to Generic Letter 2008-01 ML0832408252008-11-24024 November 2008 Enclosure 2 - Handout - TSTF Presentation Discussions on Industry Concerns Regarding Technical Specification Branch Positions and TSTF-493, Rev. 3, Clarify Application of Setpoint Methodology for LSSS Functions. 2024-08-08
[Table view] |
Text
Technical Specifications Task Force TSTF A Joint Owners Group Activity Proposed Path Forward on TSTF-568, "Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2" 1
Technical Specifications Task Force TSTF A Joint Owners Group Activity TSTF-568 Background
- Applicable to BWR plants with Mark I and Mark II containments (BWR/2, /3, /4, and /5 plants)
- Submitted December 19, 2017
- NRC issued acceptance letter and review schedule on March 8, 2018 2
Technical Specifications Task Force TSTF A Joint Owners Group Activity TSTF-568 Status
- At the August 9, 2018 TSTF/NRC public meeting, the NRC stated that they support the change to TS 3.6.2.5, Drywell-to-Suppression Chamber Differential Pressure
- Only applicable to three BWR plants (Dresden, Fitzpatrick, and Quad Cities) 3
Technical Specifications Task Force TSTF A Joint Owners Group Activity TSTF-568 Status
- Applicable to all BWR/2, BWR/3, BWR/4, and BWR/5 units
- The NRC does not agree with the existing justification of "As long as reactor power is < 15% RTP, the potential for an event that generates significant hydrogen is low and the primary containment need not be inert."
- While the risk to the public is too small to warrant a backfit on the issue, the NRC staff is not comfortable with issuing a change to the TS that relies on that justification.
- The TSTF was unable to find supporting analysis for the statement and accepts the NRC position.
4
Technical Specifications Task Force TSTF A Joint Owners Group Activity TSTF-568 Proposed Revision
- The TSTF has revised the traveler to address the staff concerns:
- Revise the TS 3.6.2.5, "Drywell-to-Suppression Chamber Differential Pressure," Applicability to Mode 1 with thermal power > [15]%
- Supported by the analysis referenced in TSTF-568.
- Revise the TS 3.6.3.2, "Primary Containment Oxygen Concentration," Applicability to Mode 1.
- Addresses the NRC staff concern.
- TS 3.6.3.2 Required Action B.1 is revised to require being in Mode 2 in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 5
Technical Specifications Task Force TSTF A Joint Owners Group Activity TSTF-568 Proposed Revision
- For both TS:
- The existing Applicability exceptions are eliminated.
- Required Action A.1 (restore the value to within limit) is changed from 8 and 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
- A Note is applied to Required Action A.1 permitting the use of LCO 3.0.4.c to enter the Applicability with the LCO not met.
- The Required Action A.1 and the Note will be used instead of the existing Applicability exceptions to permit entering the Applicability with the limit not met during a startup, and to enter the action prior to exiting the Applicability on a shutdown
- The Bases will state that entering Required Action A.1 prior to a shutdown without intention to restore compliance prior to exiting the Applicability is acceptable in this case.
6
Technical Specifications Task Force TSTF A Joint Owners Group Activity TSTF-568 Proposed Revision
- The Required Action A.1 Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is based on:
- The time to perform on-line maintenance at low power (typically
< 15% RTP) requiring primary containment or suppression pool entry.
- De-inert the primary containment and suppression pool while reducing power to permit containment entry (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)
(existing allowance),
- Perform on-line maintenance in containment (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />), and
- Re-inert the primary containment and suppression pool while increasing to full power (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) (existing allowance).
7
Technical Specifications Task Force TSTF A Joint Owners Group Activity 8
Technical Specifications Task Force TSTF A Joint Owners Group Activity TSTF-568 Proposed Revision Discussion 9