HL-5079, Forwards Rev 2 to Ei Hatch Nuclear Plant Unit 1,Cycle 16 COLR & Rev 0 to Ei Hatch Nuclear Plant Unit 2,Cycle 13 Colr

From kanterella
Revision as of 17:55, 24 September 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 2 to Ei Hatch Nuclear Plant Unit 1,Cycle 16 COLR & Rev 0 to Ei Hatch Nuclear Plant Unit 2,Cycle 13 Colr
ML20094R530
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/28/1995
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20094R533 List:
References
HL-5079, NUDOCS 9512050011
Download: ML20094R530 (2)


Text

- -

. r. ._ -.

r

-g.. s- . . Georgia P:wer Company ..

. . 40 invemess Cent r P:rkwry

.- Port Office Box 1295 Birmingham, Alabama 35201 Telephone 205 877-7279 l

J. T. Beckham, Jr. GeorgiaPower Vice President - Nuclear -

tesmvan m syswn l

Hatch Project .

November 28, 1995 Docket Nos. 321 HL-5079 50-366 U.S. Nuclear Regulatory Commission ATTN:- Document Control Desk

-Washington, D,C. 20555 i

Edwin I. Hatch Nuclear Plant Unit 1 Cycle 16 Core Operating Limits Report, Revision 2 ,

Unit 2 Cycle 13 Core Operatinz Limits Report i Gentlemen:

By Amendment 168 to the Unit 1 Technical S' pecifications, and Amendment 106 to the Unit 2 Technical Specifications, the NRC authorized relocation of certain fuel-related limits from the Technical Specifications to the adjunct Core Operating Limits Report (COLR). This letter transmits an information copy ofRevision 2 to the COLR for Hatch Unit 1 Cycle 16. Revision 2 consists of changes to Figure 4-3 as a result of a mid-cycle ,

evaluation performed by the fuel vendor. Additionally, this letter transmits an information copy of the COLR for Hatch Unit 2 Cycle 13.

Should you have any questions in this regard, please contact this office.

Sincerely,

.h J. T. Beckham, Jr.

DLP/eb

Enclosures:

Unit 1 Cycle 16 Core Operating Limits Report, Revision 2 Unit 2 Cycle 13 Core Operating Limits Report cc: (See next page.).

050112

~

9512050011 951128 PDR ADOCK 05000321 .

(i

..- P _ _-_ _,_ PDR.~,,__ \

i j

h Qfh ,

U. S. Nuclear Regulatory Commission- - Page 2  ;

e November 28 1995 i l

4 i

cc: Georgia Power Comrxmv i

. Mr. II. L'. Sumner, Nuclear Plant General Manager l LNORMS- .

4 l).S. Nuclear Regulatorv Commission. Washineton. D.C.

Mr. K. Jabbour, Licensing Project Manager - Hatch  ;

,c. p

- U.S. Nuclear Rerulatory Commission. Washineton. D.C.  :

Mr. S. D. Ebneter, Regional Administrator  !

Mr. B. L. Holbrook, Senior Resident Inspector - Hatch -l l

l.

i l

t- ,

1. $

4-1 I

l e

?

+

D FIL-5079 i

-, - . - , -_,