Annual Assessment Meeting for Millstone Power Station - Meeting Summary
ML20121A108
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/30/2020
From: Daniel Schroeder
Reactor Projects Branch 2
To:
Schroeder D
References
MN 20-001
Download: ML20121A108 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSLYVANIA 19406-2713 April 30, 2020 MEETING

SUMMARY

LICENSEE: DOMINION NUCLEAR CONNECTICUT, INC.

FACILITY: MILLSTONE POWER STATION

SUBJECT:

SUMMARY

OF PUBLIC WEBINAR MEETING On April 21, 2020, at 4:00 p.m., the U.S. Nuclear Regulatory Commission (NRC) held a two-part public webinar with the Connecticut Nuclear Energy Advisory Council (NEAC). During the first part of the webinar, the NRC staff presented the Agencys assessment of the safety performance at Millstone Power Station for the period of January 1 through December 31, 2019, as described in the annual assessment letter dated March 3, 2020. A copy of the letter can be accessed through the NRCs Agencywide Document Access and Management System (ADAMS), Accession Number ML20059M272. Following the presentation, an opportunity was provided to the members of the Connecticut NEAC for questions. The second part of the webinar provided members of the public with an opportunity to submit questions verbally or in writing on topics discussed during the first part of the webinar and the NRCs role in ensuring safe plant operations. The following NRC staff provided presentations during the webinar:

Daniel Schroeder (Chief, Division of Reactor Projects), Justin Fuller (Senior Resident Inspector, Millstone), Rich Guzman (Project Manager, Office of Nuclear Reactor Regulation), David Rudland (Senior Technical Advisor, Office of Nuclear Reactor Regulation), and Jonathan Ortega-Luciano (Reactor Operations Engineer, Office of Nuclear Reactor Regulation).

Copies of the slides used by the NRC staff during the webinar can be accessed through ADAMS, Accession Number ML20111A035. A notice of the NRC and NEAC meeting was issued on April 8, 2020, and was posted on the NRCs external (public) Web page (ADAMS Accession Number ML20099B073). ADAMS is accessible from the NRC Web page at:

http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at:

https://www.nrc.gov/reactors/operating/oversight.html.

X /RA/

Signed by: Daniel L. Schroeder Daniel L. Schroeder, Chief Projects Branch 2 Division of Reactor Projects