Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000483/2022402
ML21333A157
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/30/2021
From: Sam Graves
NRC/RGN-IV/DRS/EB-2
To: Diya F
Ameren Missouri
References
IR 2022401
Download: ML21333A157 (11)


See also: IR 05000483/2022402

Text

November 30, 2021

Mr. Fadi Diya, Senior Vice President

and Chief Nuclear Officer

Ameren Missouri Callaway Plant

8315 County Road 459

Steedman, MO 65077

SUBJECT: CALLAWAY PLANT - INFORMATION REQUEST FOR THE CYBER- SECURITY

BASELINE INSPECTION, NOTIFICATION TO PERFORM INSPECTION

05000483/2022402

Dear Mr. Diya:

On March 28, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0

at your Callaway Plant. The inspection objectives are to provide assurance that the digital

computer and communication systems and networks associated with safety, security, or

emergency preparedness (SSEP) functions are adequately protected against cyber-attacks in

accordance with Title 10 of the Code of Federal Regulations (10 CFR) 73.54 and your approved

cyber security plan (CSP), and to verify that any CSP changes and reports have been made in

accordance with 10 CFR 50.54(p).

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and licensee staff. In order to minimize the inspection impact on the site and to

ensure a productive inspection for both parties, we have enclosed a request for documents

needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should

be made available via digital media (CD/DVD) or an online document repository and

delivered/available to the regional office no later than January 7, 2022. The inspection team will

review this information and, by January 31, 2022, will request the specific items that should be

provided for review.

The second group of requested documents will assist the inspection team in the evaluation of

the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas

of your cyber security program selected for review. This information will be requested for review

in the regional office prior to the inspection by February 28, 2022, as identified above.

F. Diya 2

The third group of requested documents consists of additional items that the inspection team

will review, or need access to, during the inspection. Please have this information available by

the first day of the onsite inspection, March 28, 2022.

The fourth group of information aids the inspection team in tracking issues identified during the

inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. It is important that all requested documents are

up to date and complete in order to minimize the number of additional documents requested

during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Sam Graves. We understand that our regulatory

contact for this inspection is Anthony Lowry of your organization. If there are any questions

about the inspection or the material requested, please contact the lead inspector

at 817-200-1102 or via e-mail at samuel.graves@nrc.gov

PAPERWORK REDUCTION ACT STATEMENT

This letter contains mandatory information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections (approval number 3150-0011). Send comments

regarding this information collection to the Information Services Branch, Office of the Chief

Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC

20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of

Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and

Budget, Washington, DC 20503.

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct nor sponsor, and a person is not required to respond to, a request

for information or an information collection requirement unless the requesting document

displays a currently valid OMB control number.

F. Diya 3

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRC's Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Signed by Graves, Samuel

on 11/30/21

Sam Graves, Senior Reactor Inspector

Engineering Branch 2

Division of Reactor Safety

Docket No.: 50-483

License No.: NPF-30

Enclosure: Cyber-Security Inspection Document Request

cc w/encl: Distribution via LISTSERV

ML21333A157

X SUNSI ADAMS: Sensitive Non-Publicly Keyword

Review By: Yes No Non-Sensitive Available NRC-002

STG Publicly Available

OFFICE EB2:SRI

NAME S. Graves

SIGNATURE /RA/

DATE 11/30/2021

F. Diya 5

Inspection Report: 05000483/2022401

Inspection Dates: Onsite the week of March 28, 2022

Inspection Procedure: IP 71130.10, Cyber-Security, Revision 0

Reference: Guidance Document for Development of the Request for

Information (RFI) and Notification Letter for Full-Implementation of

the Cyber-Security Inspection. (ML TBD)

NRC Inspectors: Sam Graves, Lead Stella Opara

817-200-1102 301-287-9286

samuel.graves@nrc.gov stella.opara@nrc.gov

NRC Contractors: Alan Konkal Casey Priester

561-989-0210 301-415-7000

alan.konkal@nrc.gov frederick.priester@nrc.gov

I. Information Requested for In-Office Preparation

This initial request for information (i.e., first RFI) concentrates on providing the inspection

team with information necessary to select appropriate components and cyber security

program elements to develop a site-specific inspection plan. The first RFI is used to

identify the critical digital assets or systems to be chosen as the sample set required to

be inspected by the cyber-security IP. The first RFIs requested information is specified

below in Table RFI #1. Please provide the Table RFI #1 to the regional office by

January 7, 2022, or sooner, to facilitate the selection of the specific items for review.

The inspection team will examine the documentation from the first RFI and select

specific systems and equipment to provide a more focused follow-up request to develop

the second RFI. The inspection team will submit the specific systems and equipment list

to your staff by January 31, 2022, which will be utilized to evaluate the equipment,

defensive architecture, and the areas of the licensees cyber security program for review.

Please provide the information requested by the second RFI to the regional office by

February 28, 2022. All requests for information shall follow the guidance document

referenced above. For information requests that have more than ten (10) documents,

please provide a compressed (i.e., Zip) file of the documents.

The required Table RFI 1 information shall be provided on digital media (CD/DVD)) or an

online document repository to the lead inspector by January 7, 2022. Please provide

four copies of each media submitted (i.e., one for each inspector/contactor). The

preferred file format for all lists is a searchable Excel spreadsheet file. The media

(CDs/DVDs) should be indexed and hyper-linked to facilitate ease of use. If you have

any questions regarding this information, please call the inspection team leader as soon

as possible.

Table RFI #1

Section 3,

Paragraph Number/Title: IP Ref

A list of all Identified Critical Systems and Critical Digital Assets, and

non-CDA digital assets used in the cyber defensive architecture,

(e.g., firewalls, SIEM, NIDS/NIPS, kiosks, access authorization, 10

1 CFR 73.55 equipment not part of the security system) - Overall

highlight/note any changes (e.g., additions, deletions,

reclassifications) since the last cyber security inspection, including

changes to boundary devices

2 A list of CDA and DA wireless Industrial networks Overall

A list of EP and Security onsite and offsite digital communication

3 Overall

systems

4 Network Topology Diagrams Overall

5 Ongoing Monitoring and Assessment program documentation 03.01(a)

The most recent effectiveness analysis of the Cyber Security

6 03.01(b)

Program

Vulnerability screening/assessment and scan program

7 03.01(c)

documentation

Cyber Security Incident response documentation, including incident

detection, response, and recovery documentation as well as 03.02(a)

8 contingency plan development, implementation and including any and

program documentation that requires testing of security boundary 03.04(b)

device functionality

List of all network security boundary devices for EP networks and all

9 03.02(b)

network security boundary devices for levels 3 and 4

10 Device Access and Key Control documentation 03.02(c)

11 Password/Authenticator documentation 03.02(c)

12 User Account/Credential documentation 03.02(d)

6

Enclosure

Table RFI #1

Section 3,

Paragraph Number/Title: IP Ref

Portable Media and Mobile Device control documentation, including

13 03.02(e)

kiosk security control assessment/documentation

List of all design changes completed since the last inspection,

14 including 50.59 documentation and the design 03.03(a)

changes/modifications program documentation

03.03(a),

Supply Chain Management documentation including any security

15 (b) and

impact analysis for new acquisitions

(c)

Configuration Management documentation including any security

03.03(a)

16 impact analysis performed due to configuration changes since the

and (b)

last inspection

Cyber Security Plan and any 50.54(p) analysis to support changes

17 03.04(a)

to the plan since the last inspection

Cyber Security Assessment team documentation to include any

18 training documentation (both general cyber security training and any 03.04(c)

specialized training

19 Cyber Security Metrics tracked (if applicable) 03.05(b)

Provide a list of all procedures and policies provided to the NRC

21 Overall

with their descriptive name and associated number

In addition to the above information please provide the following:

(1) Electronic copy of the UFSAR and technical specifications.

(2) Name(s) and phone numbers for the regulatory and technical contacts.

(3) Current management and engineering organizational charts.

(4) Implementing and program procedures in a single folder.

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

submit a list of specific systems and equipment to your staff by January 31, 2022, for the

second RFI (i.e., RFI #2).

7

Enclosure

II. Additional Information Requested to be Available Prior to Inspection.

As stated in Section I above, the inspection team will examine the returned

documentation requested from Table RFI #1 and submit the list of specific systems and

equipment to your staff by January 31, 2022 for the second RFI (i.e., RFI #2). The

second RFI will request additional information required to evaluate the CSs/CDAs,

defensive architecture, and the areas of the licensees CSP selected for the cyber-

security inspection. The additional information requested for the specific systems and

equipment is identified in Table RFI #2. All requested information shall follow the

guidance document referenced above.

The Table RFI 2 information shall be provided on digital media (CD/DVD) or an online

document repository to the lead inspector by February 28, 2022. Please provide four

copies of each media (CD/DVD) submitted (i.e., one for each inspector/contactor). The

preferred file format for all lists is a searchable Excel spreadsheet file. The digital media

(CDs/DVDs) should be indexed and hyper-linked to facilitate ease of use. If you have

any questions regarding this information, please call the inspection team leader as soon

as possible.

Table RFI #2

Section 3,

Paragraph Number/Title: Items

For the system(s) chosen for inspection provide:

Ongoing Monitoring and Assessment activity performed on the

1 03.01(a)

system(s)

2 All Security Control Assessments for the selected system(s) 03.01(a)

Any effectiveness analysis for the security controls that have been

3 03.01(b)

performed on the system(s)

All vulnerability screenings/assessments associated with or scans

4 03.01(c)

performed on the selected system(s) since the last inspection

Documentation (including configuration files and rules sets) for

Network-based Intrusion Detection/Protection Systems

5 (NIDS/NIPS), Host-based Intrusion Detection Systems (HIDS), and 03.02(b)

Security Information and Event Management (SIEM) systems for

system(s) chosen for inspection)

Documentation (including configuration files and rule sets) for intra-

6 security level firewalls and boundary devices used to protect the 03.02(c)

selected system(s)

Copies of all periodic reviews of the access authorization list for the

7 03.02(d)

selected systems since the last inspection

8

Enclosure

Table RFI #2

Section 3,

Paragraph Number/Title: Items

8 Baseline configuration data sheets for the selected system(s) 03.03(a)

Documentation on any changes, including Security Impact

9 Analyses, performed on the selected system(s) since the last 03.03(b)

inspection

Copies of the purchase order documentation for any new

10 equipment purchased for the selected systems since the last 03.03(c)

inspection

Copies of any cyber security drills performed since the last 03.02(a)

11

inspection 03.04(b)

Copy of the individual recovery plan(s) for the selected system(s)

03.02(a)

12 including documentation of the results the last time the backups

03.04(b)

were executed.

Corrective actions taken because of cyber security incidents/issues

13 to include previous NRC violations and Licensee Identified 03.04(d)

Violations since the last cyber security inspection

9

Enclosure

III. Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the

following RFI (i.e., Table 1ST Week Onsite) on digital media (CD/DVD) or an online

document repository by March 28, 2022, the first day of the inspection. All requested

information shall follow the guidance document referenced above.

Please provide four copies of each digital media (CD/DVD) submitted (i.e., one for each

inspector/contactor). The preferred file format for all lists is a searchable Excel

spreadsheet file. The digital media (CDs/DVDs) should be indexed and hyper-linked to

facilitate ease of use. If you have any questions regarding this information, please call

the inspection team leader as soon as possible.

Table 1ST Week Onsite

Section 3,

Paragraph Number/Title: Items

Any cyber security event reports submitted in accordance with 10

1 03.04(a)

CFR 73.77 since the last cyber security inspection

Updated Copies of corrective actions taken as a result of cyber

security incidents/issues, to include previous NRC violations and

2 03.04(d)

Licensee Identified Violations since the last cyber security

inspection, as well as vulnerability-related corrective actions

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access to

them.

a. Updated Final Safety Analysis Report, if not previously provided;

b. Original FSAR Volumes;

c. Original SER and Supplements;

d. FSAR Question and Answers;

e. Quality Assurance Plan;

f. Technical Specifications, if not previously provided;

g. Latest IPE/PRA Report; and

(2) Vendor Manuals, Assessment and Corrective Actions:

a. The most recent Cyber-Security Quality Assurance (QA) audit and/or

self-assessment; and

10

Enclosure

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generate because of the most recent Cyber-Security

Quality Assurance (QA) audit and/or self-assessment.

IV. Information Requested To Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated because of the inspection

teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.

11