ML22231B030

From kanterella
Revision as of 00:13, 16 September 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Enclosure 1: Change to Hermes PSAR Chapter 14
ML22231B030
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 08/19/2022
From:
Kairos Power
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22231B028 List:
References
KP-NRC-2208-008
Download: ML22231B030 (2)


Text

KP-NRC-2208-008 Enclosure 1 Change to Hermes PSAR Chapter 14 (Non-Proprietary)

Preliminary Safety Analysis Report Technical Specifications Section Section Name LCO or Condition Basis Inlet gas system pressure is The objective is to limit the maintained within an upper quantity and pressure of bound limit. spilled Flibe or cover gas to ensure a postulated event does not exceed limits.

Argon purity in the cover gas is The objective is to limit maintained within an upper radionuclides in the Flibe bound limit. below solubility limits where solutesolute interactions can be neglected.

The quantity of materials at risk The objective is to limit the in the gas space of the primary quantity of materials at risk heat transport system and the in the cover gas to ensure a primary heat rejection system is postulated event does not maintained within an upper exceed limits.

bound limit.

3.4 Engineered Safety Decay heat removal system The objective is to specify the Features operability requirement to have an operable decay heat removal system to ensure that the safety limits will not be exceeded.

Reactor vessel integrity The objective is to specify a design operating temperature limit to ensure the safety limit is not exceeded for postulated events.

3.5 Ventilation Systems N/A N/A 3.6 Emergency Power N/A N/A 3.7 Radiation Monitoring Radiation monitoring system is Radiation in plant effluents is Systems and Effluents designed to be available during measured against applicable normal operating conditions as limits.

well as during postulated events.

3.8 Experiments N/A N/A 3.9 Facility Specific LCOs N/A N/A Kairos Power Hermes Reactor 145 Revision 0