MONTHYEARML24144A0922024-05-23023 May 2024 Enclosure 1: Hermes 2 Preliminary Safety Analysis Report ML24144A0942024-05-23023 May 2024 Enclosure 3: KP-TR-022-NP Hermes 2 Postulated Event Methodology Revision 1 ML24138A2132024-05-16016 May 2024 Enclosure 1: Changes to Hermes 2 PSAR Chapters 3, 5 and 13 (non-proprietary) ML24136A2552024-05-15015 May 2024 Enclosure 1: Changes to Hermes 2 PSAR Chapter 9 ML24073A3192024-03-13013 March 2024 Enclosure 1: Changes to Hermes 2 PSAR Chapter 13 ML24072A2992024-03-12012 March 2024 Enclosure 1 - Changes to Hermes 2 PSAR Chapter 7 ML24039A1912024-02-0808 February 2024 Kairos Power LLC, Changes to Hermes 2 PSAR Chapter 2 ML24031A1392024-01-30030 January 2024 Kairos Power LLC, Changes to Hermes 2 Preliminary Safety Analysis Report (PSAR) Chapter 3 ML24026A3012024-01-26026 January 2024 Kairos Power, LLC, Changes to Hermes 2 Preliminary Safety Analysis Report (PSAR) Chapter 7 ML24025C6872024-01-24024 January 2024 Kairos Power LLC, Changes to PSAR Chapter 3 and 9 ML24011A2922024-01-11011 January 2024 Kairos Power LLC, Preliminary Safety Analysis Report, Chapter 9 ML24009A2492024-01-0909 January 2024 Kairos Power LLC, Changes to Hermes 2 Preliminary Safety Analysis Report (PSAR) Chapter 9 ML24003A7672024-01-0303 January 2024 Kairos Power LLC, Changes to Hermes 2 Construction Permit Application (PSAR) Chapters 4, 5, 7, and 13 ML23356A0802023-12-22022 December 2023 Enclosure 1: Kairos Power, LLC, Changes to Preliminary Safety Analysis Report (PSAR) Chapter 13 ML23355A1632023-12-21021 December 2023 Enclosure 1: Changes to Hermes 2 PSAR Chapter 4 ML23355A1942023-12-21021 December 2023 Kairos Power LLC, Changes to Preliminary Safety Analysis Report (PSAR) Chapter 3 and Chapter 5 ML23349A1492023-12-15015 December 2023 Kairos Power LLC, Changes to Preliminary Safety Analysis Report (PSAR) Chapter 2 ML23151A7452023-05-31031 May 2023 Enclosure 1 - Preliminary Safety Analysis Report ML23115A3952023-04-25025 April 2023 Kairos Power, LLC - Enclosure 1, Changes to Hermes PSAR Chapters 2, 3, 4, 7, 8, 9, 13, and 14 ML23034A2142023-02-0303 February 2023 Kairos Power LLC, Changes to Preliminary Safety Analysis Report (Psar), Revision 1, Chapter 2 ML22353A6252022-12-19019 December 2022 Kairos Power LLC, Transmittal of Changes to Preliminary Safety Analysis Report Chapter 6 and Response to NRC Question on Dhrs Testing ML22286A2432022-10-13013 October 2022 Kairos Power, LLC - Preliminary Safety Analysis Report ML22285A2292022-10-12012 October 2022 Enclosure 1: Changes to PSAR Chapter 4 ML22284A1532022-10-11011 October 2022 Kairos Power LLC, Changes to Preliminary Safety Analysis Report Chapter 13 ML22284A1562022-10-11011 October 2022 Enclosure 1: Changes to Hermes PSAR Chapters 3, 4, 6, and 14 ML22279B0642022-10-0606 October 2022 Enclosure 1: Changes to Hermes PSAR Chapters 3 and 7 ML22272A5952022-09-29029 September 2022 Enclosure 1: HER-PSAR-001, Preliminary Safety Analysis Report, Rev. 1 ML22263A0352022-09-19019 September 2022 Kairos Power, LLC - Transmittal of Changes to Construction Permit Application - Exemptions Enclosure, PSAR Chapter 1, PSAR Chapter 3, and PSAR Chapter 14S ML22263A0342022-09-19019 September 2022 Enclosure 2 - Changes to PSAR Chapter 15 (Non-Proprietary) ML22259A1412022-09-16016 September 2022 Kairos Power, LLC, Changes to Preliminary Safety Analysis Report (PSAR) Chapters 3 and 4 ML22256A3012022-09-13013 September 2022 Enclosure 1: Changes to Hermes PSAR Chapters 3, 4, and 6 ML22250A6802022-09-0707 September 2022 Enclosure 1: Changes to PSAR Chapters 4 and 5 ML22242A1682022-08-30030 August 2022 Kairos Power LLC, Changes to Construction Permit Application - PSAR Chapters 3, 4, 8, and 13 ML22237A3262022-08-25025 August 2022 Kairos Power LLC, Changes to Preliminary Safety Analysis Report Chapters 3, 4, 5, 9 and 14 ML22236A5952022-08-24024 August 2022 Kairos Power, LLC, Preliminary Safety Analysis Report, Chapter 6 ML22231B0302022-08-19019 August 2022 Enclosure 1: Change to Hermes PSAR Chapter 14 ML22230D0492022-08-18018 August 2022 Kairos Power LLC, Changes to Preliminary Safety Analysis Report (PSAR) Chapter 4.2 ML22252A2592022-08-18018 August 2022 Kairos Power LLC, Changes to Preliminary Safety Analysis Report Table 4.2-5 ML22230D0532022-08-18018 August 2022 Enclosure 1 - Changes to PSAR Table 4.2-5 ML22224A2022022-08-12012 August 2022 Enclosure 2: Changes to Preliminary Safety Analysis Report Chapter 13 ML22210A3192022-07-29029 July 2022 Enclosure 1: Changes to PSAR Chapter 4 and Chapter 6 ML22209A1392022-07-27027 July 2022 Enclosure 1: Change to Hermes PSAR Chapter 5 ML22181B0562022-06-30030 June 2022 Enclosure 1: Changes to PSAR Chapter 7 ML22181B1592022-06-30030 June 2022 Enclosure 1 - Changes to PSAR Chapters 3, 4, and 6 (Non-Proprietary) ML22181B1762022-06-30030 June 2022 Enclosure 1 - Changes to PSAR Chapter 4.2 ML22181B1132022-06-27027 June 2022 Enclosure 1: Changes to PSAR Chapter 3 ML22178A2382022-06-27027 June 2022 Enclosure 1: Changes to PSAR Chapter 9 ML22171A0172022-06-20020 June 2022 Kairos Power, LLC Preliminary Safety Analysis Report ML22167A1922022-06-16016 June 2022 Kairos Power LLC, Changes to Construction Permit Application - PSAR Chapter 14 ML22161B0142022-06-10010 June 2022 Kairos Power LLC, Changes to Preliminary Safety Analysis Report Chapter 7 2024-05-23
[Table view] |
Text
PreliminarySafetyAnalysisReport AuxiliarySystems
9.6 POSSESSIONANDUSEOFBYPRODUCT,SOURCE,ANDSPECIALNUCLEARMATERIAL Specialnuclearmaterial(SNM),source,andbyproductmaterialwillbepresentatthereactorfacility.
Theapplicablerequirementsin10CFRPart30,10CFRPart40,and10CFRPart70maybesatisfiedusing contentcontainedwithinthisConstructionPermitApplication.However,materiallicense(s)arenot beingrequestedatthistimeandnecessarylicenseapplication(s)oramendmentswillbesubmittedata futuredate.ThissectiondescribesthesystemsthatinteractwithSNM,source,orbyproductmaterial, andthedesignbasisforthosesystemstopreventuncontrolledreleaseofradioactivematerialsandto maintainpersonnelexposurelimitswithin10CFRPart20doselimitsandaslowasreasonably achievable(ALARA)objectives.AdditionalinformationonALARApracticesisdiscussedinChapter11.
Spacesinwhichthematerialsarehandledandequipmentusedtohandlethematerial,aresubjectto administrativecontrolstominimizecontamination,topreventradiologicalsabotage,theftordiversion, andtopreventuncontrolledreleaseofthematerials.Adescriptionoftheadministrativeprocedures relatedtouseofbyproduct,source,andspecialnuclearmaterialwillbeprovidedintheapplicationfor anOperatingLicense.
WastefromSNM,sourcematerial,orbyproductmaterialishandledthroughtheradioactivewaste managementprogramdescribedinSection11.2.1.Theradioactivewastehandlingsystemalsohandles drainsandventsforthefacilityincludinghandlingofcontaminatedliquidscollectedbythedrainsystem (seeSection11.2.2).
9.6.1 SpecialNuclearMaterial SNMisreceivedandusedatthefacilityintheformoffreshfuelparticlescontainedinpebbles(see Section9.3).FuelpebblescontainingSNMusehighassay,lowenricheduranium(lessthan20%
enrichment)atdifferentenrichmentlevels.
SNMishandledinthefuelintakearea,thePHSS,andthereactorvessel.Intheintakearea,SNMis managedbycompliancewith10CFRPart70,bytheuseoffreshfuelcanistersandbythenatureofthe pebbledesign,inwhichtheSNMisencapsulatedinagraphitesubstrate.Section9.3andChapter4 describehowthePHSSandthereactorvessel,respectively,preventuncontrolledreleasesofradioactive material.Ofthesystemsdescribedinthisparagraph,onlythefreshfuelhandlingareashavethe potentialfordirectcontactwiththeSNMduringnormaloperation.Atthislocation,theactivityofthe freshfuelisverylowandadministrativeproceduresthatminimizecontactwiththefreshfuelare sufficientinsupportofALARApractices.InthePHSS,spentfuelishandledincanistersandshieldingis usedtosupportALARApractices.
9.6.2 SourceMaterial Sourcematerialthatcontainsunenricheduraniumisalsoreceivedandusedatthefacilityintheformof unenrichedfuelparticlescontainedinfuelpebbles.Handlingoffuelpebblescontainingsourcematerial iswithinthesamesystemsasthepebblesthatcontainSNM.Sourcematerialismanagedbycompliance with10CFRPart40,byuseoffreshandspentfuelcanisters,andbythenatureofthepebbledesign,in whichthesourcematerialisencapsulatedinagraphitesubstrate.
9.6.3 ByproductMaterial ByproductmaterialsarebothusedinandgeneratedtosupportoperationoftheKPFHR.
Tritiumisgeneratedatthefacilityandisclassifiedasbyproductmaterial.Tritiumisgeneratedasaresult ofthenuclearreactioninthecore.ItispossiblefortTritiumtobeispresentthroughouttheprimary, intermediate,andpowergenerationsystems,andinthegraphitecoreoffuelpebbles.Becausethe
KairosPowerHermes2,Units1and2 939 Revision0