ML20133M553

From kanterella
Revision as of 22:19, 9 August 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Proposed Tech Specs,Changing Offsite & Onsite Organization Charts
ML20133M553
Person / Time
Site: Rancho Seco
Issue date: 10/18/1985
From:
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To:
Shared Package
ML20133M547 List:
References
TAC-60162, NUDOCS 8510280128
Download: ML20133M553 (6)


Text

.--. .__ _ . . . . _ . __ __ _ _ . _ .. _ . . __ _ _ _ . _ _ _ _ ,

d RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS

, LIST OF FIGURES (Continued) l Figure 3.5.2-7 Core Imbalance vs. Power Level, O to 40 EFPD

! 3.5.2-8 Core Imbalance vs. Power Level, af ter 30 EFPD 1

3.5.2-9 Core Imbalance vs. Power Level, after 300 EFPD with APSRs i Withdrawn j 3.5.2-10 Deleted

, 3.5.2-11 Deleted i 3.5.2-12 Deleted i

3.5.4-1 Incore Instrumentation Specification Axial Imbalance Indication ,

3.5.4-2 Incore Instrumentation Specification Radial Flux Tilt Indication l 3.5.4-3 Incore Instrumentation Specification 3.18-1 Ger.eral Layout of Site

4.13-1 Main Steam Inservice Inspection
4.13-2 Main Feedwater Inservice Inspection I 4.13-3 Main Steam Dump Inservice Inspection L

! 138>< 6.2-1 SMUD Nuclear Safety Organization Chart

6.2-2 Plant Organization Chart l

l 1

I l

l i

l rao2 an $dh" P

e i

! Proposed Amendment No. 138 xit

' _ _ _ _ _ _ _ _ . _ _ _ . . , . _ _ _ _ . _ , . _ . ~ . . . ... _ . _ . _ .__.__ _ . _ _ . _ __.

RANCllO SECO UNIT I

TECIINICAL SPECIFICATIONS Administrative Controls FIGURE 6.2-1 I

BOARD SMUD NUCLEAR SAFETY ORGANIZATION CllART OF DIRECTORS e

GENERAL MANAGER INDEPENHir 03DA,-

MANAGEMENT TNTIS PFR10DIC SAFEIY SAFETY REVIEW AUDIT OF RN U D SEW  ;

COMMITTEE Ol'ERATIGIS I

i

  • ACM NUCLEAR *ACM OPERATIONS *ACM ENGINEERING *ACM SERVICES i

i NUCLEAR DISTRIntITION ENGINEERING PUltCilASES i ENGINEERING CONSTRUCTION & STORES i

I QUALITY DISTRIBUTION SECURITY OPERATIONS ,_

1 l

  • ACM -- Assistant Ceneral Manager
    • NUCLEAR ** Responsible for Fire Protection

.ICENSING OPERATIONS Program Proposed Amendment No. 138

Figure 6.2-2 RANCil0 SECO UNIT 1 Administrative Controls TECilNICAL SPECIFICATIONS l

! PLANT ORGANIZATION CHART

!i MANAGER * -

! NUCLEAR l OPERATIONS i

I ASST MANAGER REGULATORY

  • SCllEDULING ADMINISTRATION NUCLEAR COMPLIANCE l

OPERATIONS SUPERVISOR

! I I INCIDENT REGULATORY

! ANALYSIS COMPLIANCE STAFF TECilNICAL *

  • PLANT SUP N NDENT i

SR POWER PLANT

  • SilIFT TECilNICAL ASSISTANT TO
ENGINEER ADVISORS PLANT j NUCLEAR / MECH /ELEC SUPERVISOR SUPERINTENDENT l

f  !

l NUCLEAR NUCLEAR

  • NUCIEAR NUCLEAR CitEM-RAD
MECilANICAL OPERATIONS ELECTRICAL I&C SUPERINTENDENT SUPERINTENDENT SUPERINTENDENT
l SUPERINTENDENT SUPERINTENDENT i

. ASSISTANT CONTROL ROOM OPERATIONS OPERATIONS SUPERINTENDENT STAFF

. ._ - _ . _ _ - .- - =_. . - _ _ . _ - - - - - . .- -

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Administrative Controls 6.3 FACILITY STAFF QUALIFICATIONS 6.3.1 Each member of the unit staff shall meet or exceed the minimum ,

qualifications of ANSI N18.1-1971 for comparable positions, except for (1) the (Chemical-Radiation Superintendent) who shall meet or exceed the qualifications of Regulatory Guide 1.8 September 1975, and (2) the Shift Technical Advisor who shall have a bachelor's degree or equivalent in a scientific or engineering discipline. The STA shall receive specific training in plant design, and response and analysis of the plant for transients and accidents.

l 6.4 TRAINING l 6.4.1 A retraining and replacement training program for the operating staff shall be maintained under the direction of the Training Superintendent and shall meet or exceed the requirements and

! recommendations of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFR, Part 55.

l 6.4.2 A training program for the Fire Brigade shall be maintained under the

direction of the Safety Technician and shall meet or exceed the requirements of Section 27 of the NFPA Code - 1975, except refresher i classroom training shall be on a quarterly schedule.

6.5 REVIEW AND AUDIT 6.5.1 PLANT REVIEW COMMITTEE (PRC)

FUNCTION 1

6.5.1.1 The Plant Review Committee shall function to advise the Manager of '

Nuclear Operations on all matters related to nuclear safety.

COMPOSITION i

6.5.1.2 The Plant Review Committee shall be composed of the:

Chairman: Regulatory Compliance Supervisor Member: Superintendent Nuclear Operations 138>< Member: Technical Support Superintendent Member: Nuclear Mechanical Maintenance Superintendent 138>< Member: Nuclear I and C Superintendent Member: Chemical and Radiation Superintendent Member: Shif t Technical Advisor Supervisor i

Proposed Amendment No. 138
6-3 3

I

_ . _ - - - , __ ~ . . _ _ _ _ _

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Administrative Controls N

COMPOSITION i

6.5.2.2 The MSRC shall be composed of the:

138>< Assistant General Manager, Nuclear Chairman

Assistant General Manager, Engineering Alternate Chairman Regulatory Compliance Supervisor Manager, Nuclear Engineering Department Manager, Nuclear Operations Department Principal Project Engineer Supervising Licensing Engineer 138>< Manager, Quality Department Quality Assurance Engineer Plant Superintendent Quality Assurance Engineer Secretary (non-voting member) 138> From time to time the General Manager may add additional members when it appears the additional members will strengthen the safety perspectives of the MSRC. The provisions of Section 6.5.2.6 will

< apply.

ALTERNATES 6.5.2.3 A current list of alternates approved by the General Manager shall be maintained by MSRC Secretary. In case of the absence of both the Chairman and the Alternate Chairman as provided in 6.5.2.2, a Temporary Alternate Chairman may be designated in writing by the '

General Manager. No more than two alternates shall participate in MSRC activities at any one time.

d CONSULTANTS I 6.5.2.4 Consultants shall be utilized as determined by the MSRC Chairman to provide expert advice to the MSRC.

MEETING FREQUENCY 6.5.2.5 The MSRC shall meet at least once per calendar quarter during the

, initial year of facility operation following fuel loading and at least once per six months thereaf ter.

QUORUM 6.5.2.6 A quorum of MSRC shall consist of the Chairman or his designated alternate and a majority of the MSRC members including alternates.

No more than a minority of the quorum shall have line responsibility for operation of the facility.

i l

I

! Proposed Amendment No.138 6-7

\_-.--- . _ - , - - . . - _ - - - - _ - . - - - - - . - - - - - . - . - _ .

.. - .. _ =. - ._ - _.

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Administrative Controls AUTHORITY 6.5.2.9 The MSRC shall report to and advise the General Manager on those areas of responsibilty specified in Section 6.5.2.7 and 6.5.2.8.

RECORDS 6.5.2.10 Records of MSRC activities shall be prepared, approved, and

. distributed as indicated below:

I

a. Minutes of each MSRC meeting shall be prepared, approved and forwarded to the General Manager within 14 days following each meeting.
b. Reports of reviews encompassed by Section 6.5.2.7 e, f, g, and h above, shall be prepared, approved, and forwarded to the General Manager within 14 days following completion of the review,
c. Audit reports encompassed by Section 6.5.2.8 above, shall be
forwarded to the General Manager and to the management positions  ;

responsible for the areas audited within 30 days after '

completion of the audit.  !

1 6.6 LICENSEE EVENT REPORT ACTION l 1 r 6.6.1 The following actions shall be taken should an Event require a l Licensee Event Report (LER)* l
a. The Commission shall be notified pursuant to the requirements of Section 73 to 10 CFR Part 50, and i
b. Each event requiring an LER, per Section 73 to 10 CRF Part 50,  !

l shall be reviewed by the PRC and the resulting LER shall be t submitted to the Manager of Nuclear Operations or the Plant 138>< Superintendent, and the Assistant General Manager, Nuclear, or  !

the General Manager prior to its submittal to the Commission.

i l

i 1

Proposed Amendment No. 138 l

l

. _ _ _ _ _ _ - _ . _ _ _ _ _ _ _ - _ . _ . _ _ _ _