Forwards Updated Interim Organizational Charts for Nuclear Restart Implementation & Nuclear Plant Dept & Tabular Listing of Interim Corporate & Onsite Positions as Compared to Tech Spec Figures 6.2-1 & 6.2-2
ML20211E923
Person / Time
Site: Rancho Seco
Issue date: 10/17/1986
From: Julie Ward
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Miraglia F
Office of Nuclear Reactor Regulation
References
JEW-86-553, TAC-60162, TAC-63084, NUDOCS 8610230249
Download: ML20211E923 (6)


Text

.

$ SMUD SACRAMENTO MUNICIPAL UTluTY DISTRICT C 6201 S Streat, P.O. Box 15830. Sacramento CA 95852 1830.(916)452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA JEW 86-553 October 17, 1986 DIRECTOR OF NUCLEAR REACTOR REGULATION ATTENTION FRANK J MIRAGLIA DIRECTOR PWR-DIVISION U S NUCLEAR REGULATORY COMMISSION WASHINGTON DC 20555 DOCKET N0. 50-312 LICENSE NO. DPR-54 INTERIM (PRE-START) ORGANIZATION Proposed Amendment No. 138 was submitted to the NRC on October 18, 1985 and superseded by Revision 1, submitted on August 13, 1986. Both of these submittals addressed changes to Section 6 of the Rancho Seco Technical Specifications with respect to on-site and corporate organization changes.

These changes resulted from management additions to broaden and augment

. supervision of Rancho Seco activities.

Subsequent to the August 13, 1986 submittal, further organizational restruc-turing has taken place, the most recent to provide for a more efficient focus on the District's restart activities while, at the same time, incor-porating the necessary organizational elements to adhere to all Technical Specification requirements and to facilitate a smooth transition to a l

totally SMUD managed Rancho Seco facility.

The functions and responsibil-ities of this interim organization, titled Nuclear Restart Implementation l

Organization, are presented for NRC information in Attachment I.

In l

addition, the organ'zation of the Nuclear Plant Department, updated August 25, 1986, is submitted as Attachment II for NRC information.

It is the District's intention to utilize this Restart organization until it is phased out in accordance with the Transition Plan to be submitted in Amendment 2 to our Action Plan.

During this interim period, the fundamental requirements of the Rancho Seco Technical Specifications are being met. This is evidenced by the attached tabular listing (Attachment II), which shows the corporate and on-site positions responsible for Rancho Seco as presented in Figures 6.2-1 and 6.2-2 of the technical specifications compared to the corresponding interim positions.

Plant Review Committee (PRC) and Management Safety Review Committee (MSRC) memebers are identified by a single or double asterisk, resrectively.

8610230249 861017 i

PDR ADOCK 05000312 gdl P

PDR I

~

=-

JEW 86-553 October 17,1986 Upon future' determination of SMUD's operating organization, expected at approximately year end, Revision 2 of Proposed Amendment No. 138 will be j

submitted to the NRC for approval. This forthcoming revision will super-sede Proposed Amendment No. 138, Revision 1.

NRC's technical review of-Proposed Amendment No. 138, Revision 1, specifically, Sections 6.5.3 4

and 6.8, is~ request'ed to. continue however, in view of the District's desire to meet with the NRC in late October to discuss all Section 6 issues needing to be resolved in Proposed Amendment No. 138, Revision 2, as well as " interim" organization matters.

Should you require any further information with respect to the Nuclear Restart Implementation Organization, please contact Mr. Ron W. Colombo j

at Rancho Seco Nuclear Ge ting Station Unit No. 1.

1 E. WARD DEPUTY GENERAL MANAGER, 1

NUCLEAR 1

Attachments k

ATTACHMENT I NUCLtAR RESTART IMPLEMENTATION ORGANIZATION DEPUTY GENERAL MANAGER, MGMT. SAFETY NUCLEAR REVIEW COPMITTEE I

I I

I I

I PUBLIC EXECUTIVE QUALITY MANAGEMENT ES E

INFORMATION ASSISTANT ASSURANCE ASSISTANT MANAGER DEPUTY RESTART QA MANAGER IMPLEMENTATION MANAGER DEPUTY RESTART STAFF PRACTICES &

ORGANIZATIONAL IMPLEMENTATION ASSISTANTS PROCEDURES EFFECTIVENESS MAliAGER COORDINATION I

I l

l l

I I

I NUCLEAR SUPPORT PLANT PLANT IMPLEMENTATION TRAINING LICENSING ENG H NG ES MANAGER MODIFICATIONS MANAGER MANAGER MANAGER DEPUTY DEPUTY DEPUTY DEPUTY DEPUTY DEPUTY DEPUTY PLANT PLANT IMPLEMENTATION TRAINING LICENSING ENGINEERING SUPPORT MANAGER MODIFICATIONS MANAGER MANAGER MANAGER MANAGER SERVICES MGR.

  • Licensing
  • Project
  • Materials Operations Modifications Area Coordination Maintenance &

(Construction

  • Planning
  • Compliance
  • Engineering
  • Contracts Facilities Management)

Scheduling

  • Systems Design
  • Budget
  • Technical Services Reporting Engineering
  • Info Systems System Review &

EFIC Project

  • Reliability
  • Purchasing Testing
  • TDI Project Engineering Health Physics
  • Currently studying the method for Compiiance
  • combining with Licensing.

t ATTAOIMENT II I

MANAGER NUCLEAR PLANT l

I ASSISTANT MANAGER QA SPECIALIST COORD A'IUR 1

NUCLEAR PLANT l

NUCLEAR NUCLEAR NUCLEAR NUCLEAR RADIATION MAINTENANCE OPERATIONS TECHNICAL SOIEDULING PROTECTION MANAGER MANAGER MANAGER MANAGER SUPERINTENDENT ASSISTANT TO ASSISTANT TO ASSISTANT 'ID OPS./MAINT.

. RADIATION i

NUCLEAR NUCLEAR NUCLEAR.

OLTTAGE HEALTII MAINTENANCE OPERATIONS TEGINICAL COORDINATOR i

i MANAGER MANAGER MANAGER SUPERVISOR J

ELFLTRICAL UNIT OPER SUPT TECHNICAL MODIFICATION RADIATION MAINTENANCE PROJ/ PROC SUPT SUPPORT OUTAGE TEGI. SUPPORT SUPERINTENDENT SHIFT OPS SUPr SUPERINTENDENT, COORDINATOR SUPERVISOR t

d MEGIANICAL REGULATORY RADIATION i

MAINTENANCE gg.rRY

-- O'IMPLIANCE gg OPERATIONS

]

SUPERINTENDENT SUPERINTENDENT SUPERINTENDENT A

SUPERVISOR

}

)

I AND C FIRE SUPERVISOR RADIATION i

MAINTENANCE PROTECTION NUCIliR WASTE l

SUPERINTENDENT COORDINATOR ADMINISTRATION SUPERVISOR i

}

FACILITIES HP SUPPORT &

SUPERVISOR SUPERINTENDENT i

i

ATTACHMENT III EXISTING POSITIONS / TITLES IN TECH.

INTERIM EQUVALENT POSITIONS /

SPECS. FIGURES 6.2-1 AND 6.2-2 TITLES Note (1)

Executive Director, Nuclear **

Deputy General Manager **

Manager, Nuclear 0perations**

Plant Manager **

Assistant General Manager, Engineering **

Note (2)'

Nuclear Engineering **

Nuclear Engineering Manager **

(Manager. Nuclear Engineering Department)

Nuclear Engineering Licensing Manager **

(Supervising Licensing Engineer)**

AGM, Services (Purchases & Stores)

Support Services Manager Principal Project Engineer **

Executive Assistant **

i AGM, Services (Security)

AGM, Services (Security)

Quality Assurance **

Quality Assurance Manager **

(Manager Quality Assurance Director)

Quality Assurance Engineer **

Manager, Quality **

Engineering & Qual. Control Supervisor

  • Technical Support Superintendent
  • Plant Superintendent **

Operations Manager **

Chemical & Radiation Superintendent

  • Radiation Protection Supt.*;

Chemistry Superintendent Note (3)

STA Supervisor * (Spec. 6.5.1.2)

STA Supervisor

  • Superintendent, Nuclear Operations
  • Operations Superintendent
  • Nuclear Mechanical Maintenance Supt.*

Nuclear Mechanical Maintenance Supt.*

Nuclear Electrical /I & C Supt.*

Nuclear Electrical Maint. Supt.*;

Nuclear I & C Maintenance Suot. Note (3)

Regulatory Compliance Supervisor */**

Compliance Superintendent */**

Training Superintendent (Spec. 6.4.1)

Training Manager Key:

  • - Member of Plant Review Committee
    • - Member of Management Safety Review Committee Notes:

(1) The interim organization shown on Attachment I is a hierarchical representation of senior management of the restart organization. Accordingly, some of the equivalency titles in the technical specifications are not specifically ident-ified on the attachmen t.

(2) AGM, Engineering is not responsible for Nuclear Engineering and, as such, is not an MSRC member in the interim organization.

This represents the removal of only one of the currently identified 10 members.

(3) -The Radiation Protection Superintendent and the Nuclear Electrical Maintenance Superintendent are qualified in the Chemistry and I & C disciplines as well, and provide the necessary PRC reviews during the interim on such matters.

ATTACHMENT III(con't...)

The following additional organization functions and positions have Deen established during this interim period:

Management Assistant Emergency Response Manager Public Information Deputy QA Manager Practices & Procedures Coordination Organizational Effectiveness Restart Implementation Manager Deputy Restart Implementation Manger Staff Assistants Deputy Plant Manager Plant Modifications Deputy Plant Modifications Implementation Manager Deputy Implementation Manager Deputy Training Manager Deputy Engineering Manager Deputy Licensing Manager Deputy Support Services Manager