Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20203H750 | 19 August 1997 | Rev 10 to Radiological Environ Monitoring Program Manual | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML20203H735 | 10 February 1997 | Rev 9 to CAP-0002, Off-Site Dose Calculation Manual | Grab sample Process Control Program |
ML20203H723 | 21 January 1997 | Rev 9 to Radiological Environ Monitoring Program Manual | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML20059C186 | 22 December 1993 | Proposed Tech Specs Amend 186,rev 1 Re Nuclear Organizational Changes | |
ML20058L437 | 9 December 1993 | Proposed Tech Specs Amend 187 Including Changes Making PDTS Consistent W/New 10CFR20 Regulations | |
ML20127N367 | 19 January 1993 | Proposed Tech Specs Section D6.0,administrative Controls for Proposed Amend 186 | High Radiation Area Process Control Program Fire Protection Program |
ML20059E019 | 3 August 1990 | Rev 0 to CAP-0002, Odcm | |
ML20059E014 | 31 January 1990 | Rev 0,App a to CAP-0002, Odcm | |
ML20059E024 | 22 November 1989 | Rev 3 to Environ Monitoring & Emergency Preparedness | |
ML20246A408 | 16 August 1989 | Rev 5 to Inservice Testing Program Plan | Safe Shutdown Boric Acid Stroke time Cold shutdown justification Power-Operated Valves Power Operated Valves |
ML20245L728 | 18 July 1989 | Rev 5 to Administrative Procedure RSAP-0101, Nuclear Organization Responsibilities & Authorities | Offsite Dose Calculation Manual Temporary Modification |
ML20246F124 | 5 July 1989 | Proposed Tech Specs,Deleting App B in Entirety | |
ML20246A522 | 30 June 1989 | Closure Plan | |
ML20245H578 | 22 June 1989 | Proposed Tech Specs for Amend 109 to License DPR-54 | |
ML20246E855 | 30 April 1989 | Analysis of Capsule RS1-F Smud Reactor Vessel Matl Surveillance Program | |
ML20245L046 | 27 April 1989 | Proposed Tech Specs for Proposed Suppl 1 to Amend 134 Re Application for Amend to License DPR-54,clarifying Unacceptability of Analysis Allowing Imperfections Greater than 40% of Nominal Tube or Sleeve Wall Thickness | |
ML20235Y607 | 6 March 1989 | Proposed Tech Spec Page 4-17,including one-time Extension for Certain Surveillances Required to Be Performed by 890329 | |
ML20245G194 | 28 February 1989 | Procurement Engineering Assessment Plan Final Rept | Commercial Grade Dedication |
ML20245H891 | 28 February 1989 | Revised Proposed Tech Specs,Including Pages 3-30a,3-30b, 3-40a,3-45,3-46,4-18a & 4-75 Re Addition of Operating Requirements Designed to Provide Proper Limitations & Conditions on Reactor Bldg Pressure Equalization Operations | |
ML20195F770 | 18 November 1988 | Proposed Tech Spec Section 3.4, Steam & Power Conversion Sys | Stroke time |
ML20206F288 | 15 November 1988 | Proposed Tech Specs 4.6.4.f (Page 4-34i) Re Surveillance of Equipment Required to Verify Vital 120 Volt Ac Bus Operability | |
ML20205R868 | 4 November 1988 | Proposed Tech Specs Re Local Leakage Rate Tests & Reactor Bldg Containment Integrity | |
ML20205M897 | 28 October 1988 | Proposed Tech Specs Re Nuclear Svc Battery Operability & Surveillance Requirements | Offsite Circuit |
ML20205L266 | 25 October 1988 | Proposed Tech Spec Table 3.14-3, Carbon Dioxide Suppression Zones | |
ML20155G220 | 7 October 1988 | Proposed Tech Specs Clarifying Operational Mode Applicability of Tech Spec 3.4 & Definition of Auxiliary Feedwater Sys Train | Stroke time |
ML20155B848 | 30 September 1988 | Proposed Tech Specs Re Reactor Protection Sys Trip Setting Limits,Rcs High Point Vents,Leakage & Leak Detection,Reactor Coolant Inventory & Auxiliary Electric Sys | Grab sample Pressure Boundary Leakage Offsite Circuit |
ML20155B459 | 30 September 1988 | Proposed Tech Spec Sections 1,3,4,5 & 6,reflecting Numerous Editorial Corrections & Administrative Changes | Safe Shutdown Boric Acid Shutdown Margin Packing leak Offsite Dose Calculation Manual Time to boil Hydrostatic Annual Radiological Environmental Operating Report Process Control Program Pressure Boundary Leakage Unidentified leakage |
ML20206A815 | 28 September 1988 | Rev 0 to, Effluents & Water Mgt Project Action Plan | |
ML20154J561 | 19 September 1988 | Proposed Tech Specs,Changing Local Leak Rate Test Requirements for Containment Penetrations | |
ML20154D759 | 8 September 1988 | Proposed Tech Specs Re Administrative Controls,Onsite & Offsite Organizations & Facility Staff | Safe Shutdown Offsite Dose Calculation Manual Process Control Program |
ML20153E648 | 31 August 1988 | Proposed Tech Specs on Limiting Condition for Operation Re Containment Isolation Valves | |
ML20151K104 | 28 July 1988 | Rev 0 to Special Test Procedure STP.668, EFIC High/Medium Decay Heat Test | Coast down |
ML20207C083 | 27 July 1988 | Revised Proposed Tech Specs,Consisting of Rev 1 to Proposed Amend 102,deleting App B | |
ML20151H613 | 15 July 1988 | Rev 0 to Matl Control Dept Action Plan for Rancho Seco Nuclear Generating Station | |
ML20196A228 | 21 June 1988 | Proposed Tech Specs Providing Proper Limitations & Conditions on Reactor Bldg Pressure Equalization Operations During Power Operation & Modifying Existing Purge Sys Operation Requirement | Grab sample |
ML20155K097 | 14 June 1988 | Proposed Tech Specs Making Minor Corrections to Table 3.5.5-1, Accident Monitoring Instrumentation,Items 5 & 14 & Table 4.1-1 Items 65 & 92 & Adding Second Note to Table 4.1-1,Item 80 | |
ML20195J492 | 10 June 1988 | Proposed Tech Spec Pages 4-69 Through 4-85a,modifying Radiological Effluent Tech Specs to Reduce Count Time Required for prebatch-release Sample Analysis | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
ML20151R064 | 15 April 1988 | Rev 0 to STP.1154, Remote Shutdown Panel Test | Coast down |
ML20151X321 | 6 April 1988 | Rev 1 to Procedure Development Project Action Plan for Temporary & Interim Procedure Change Incorporation as Procedure Rev | |
ML20151V587 | 2 April 1988 | Rev 1 to Sys Engineering Action Plan SYSTEM-012, CRD Breaker Action Plan | |
ML20151X287 | 31 March 1988 | Rev 0 to Sys Engineering Action Plan SYSTEM-009, Letdown Cooler Thermal & Hydraulic Shock Prevention | |
ML20150D186 | 17 March 1988 | Proposed Tech Specs,Correcting Typos & Making Further Editorial Changes to Proposed Amend 139,dtd 860129 | Safe Shutdown Boric Acid Shutdown Margin Time to boil |
ML20196G513 | 1 March 1988 | Proposed Tech Specs,Revising Tech Spec 4.1-1,Item 44.c & Tech Spec 4.10.1.E.2 Re Total Quantity of Gaseous Chlorine in Restricted Area | |
ML20147F077 | 25 February 1988 | Revised Proposed Tech Spec Table 4.1-1 & Tech Spec 4.10.1.E.2,requiring Performance of Surveillances Only When Gaseous Chlorine Onsite | |
ML20147B176 | 15 February 1988 | Rev 0 to RECM-6878, Radiological Effluent Control Manual | Offsite Dose Calculation Manual Process Control Program |
ML20148D993 | 12 February 1988 | Post-Trip Transient Investigation,Assessment & Reporting | |
ML20149K862 | 12 February 1988 | Proposed Tech Spec 6.5.1.6.d,identifying Items Not Requiring Plant Review Committee Review | |
ML20196D909 | 11 February 1988 | Proposed Tech Specs,Adding Term Dewatering to Process Control Program | Annual Radiological Environmental Operating Report Process Control Program |
ML20149G178 | 8 February 1988 | Proposed Page 3-19 to Tech Spec 3.3, Emergency Core Cooling,Reactor Bldg Emergency Cooling & Reactor Bldg Spray Sys | |
ML20196B807 | 1 February 1988 | Proposed Tech Spec Figure 6.2-2, Nuclear Organization Chart |