Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Calculation Change Notice XX-E013, Rev. 4, Seq. CN003, Post-Fire Safe Shutdown (PFSSD) Analysis
ML20290A616
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/23/2020
From: Wilkins W
Wolf Creek
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20290A562 List:
References
WO 20-0041 XX-E013, Rev. 4, Seq. CN003
Download: ML20290A616 (13)


Text

FORM APF-OSD-00 1-02, REV. 11 Page 1 OY/ ~s CALCULATION CHANGE NOTICE CCN NO. XX - E-013 - ,-EH:r.,- - Cl>l09 7


------1 Base Cale No . Rev No . Sequence No .

CALCULATION TITLE - Enter this item in CALCULATION TITLE field in EIS:

Post-Fire Safe Shutdown (PFSSD) Analysis COMPUTER CODE: None VERSION: None Administrative? DYES [gi NO ASSOCIATED CHANGE#: 014658 ON/A - only if Administrative REGULATORY D REVIEWS: Attached

[gJ Attached to: DCP 014658 RO Evaluation#

USAR STATEMENT: D Requires a change to the USAR:

[gJ Does not require a change to the USAR ANY DOCUMENTS DYES If yes, enter: Work Management Tool#, SWO #,

IMPACTED? [gi NO and/or Condition Report#, if applicable Status: [gJ COMMITTED D FINAL D VOID D SUPERSEDED JOh-1//C 5 /1§/ J ~ ORIG Date Printed Name Date Signature QUALIFICATION REQUIRED: ES9280479 VERF VERF Printed Name Date Signature Signature QUALIFICATION REQUIRED: ES9280479 QUALIFICATION REQUIRED: ES9280479 Vik ~anal * ~ ,s.._1~, ,otcz Z"'lj-APP Printed Name 6 / l O/ H, APP Date Printed Name Date Signature Digitally signed by Howard Louis Me Date:1 2014.06J H 10:33: 15 -05'00' RPE Certification (For ASME Section III Stress Reports/Design Reports, refer to AP OSD-001 for ualification re uirements

FORM APF-OSD-001-02, REV. 11 Page 2 CAJ::XP CALCULATION CHANGE NOTICE CCN NO. XX-E - 013 GH8 &'r ,4,. ~4W_r Base Cale No. Rev No. Sequence No.

CALCULATION SUBJECT (Statement Of Problem) - Enter this in SUBJECT field in EIS:

Change package 14658 is replacing cable from EDGs speed signal generators to the EDGs speed switches. Appendices 1, 2 and 3 are updated to reflec t these changes .

FORM APF-OSD-001-02, REV. 11 Page 3 CD/ o/lJD~

CALCULATION DATABASE INPUT CCN NO. XX-E-013 - ~ - -eNe fr'r 1#.

Base Cale No. Rev No. Sequence No.

Link systems to the calculation/CCN in EIS.

Systems KJ Affected:

Develop relationships between interdependent calculations in EIS.

Additional None Calculations Providing Input to this calculation:

Additional None Calculations Impacted by this calculation:

Develop relationships between the calculation/CCN and controlled reference documents in EIS.

Additional None Controlled Documents Inputs to this calculation:

Additional None Controlled Documents Impacted by this calculation:

The reference documents listed below are those that cannot be linked to the calculation/CCN and shall be entered in the INDUSTRY REFERENCE field in EIS, e.g., ASME Codes, ANSI Standards, letters, etc.

Additional DCP 014658 Other Reference Documents:

Link components to the calculation/CCN in EIS.

Additional KJSE0066,KJSE0166,KJSS0066,KJSS0166 Components:

REFER TO DESKTOP GUIDE FOR PROCESSING CALCULATIONS IN EIS

FORM APF-OSD-001-02, REV 11 tJd/

LIST OF EFFECTIVE PAGES CCN NO. XX-E-013 - -etB- -

Base Cale No. Rev No. Sequence No .

CCN Cale. CCN Cale. CCN Cale. CCN Cale.

Page Page Page Page Page Page Page Page No.

Affected No. Affected No. Affected No. Affected DVR/SCRN/ /DVR/SCRN /DVR/SCRN /DVR/SCRN Other /Other /Other /other 5 App 1, pg 60 6 App 2, pgs 4 and 5 7 App 2' pgs 9 and 10 8 App 3, pg 69 9-13 DVR DVR ~ Design Verification Report (if applicable)

SCRN Regulatory Screening (if applicable}

AD Applicability Determination

FORM APF-05D-OOl-02, REV. l 1 Page 5 tZf( c.Wa?3 CALCULATION SHEET CCN NO. _ _ _ xx_-E_-_0_1_3_ _ _ - ..-&8 - -GNG-0-,- ,;P./) ~.Y~1'f-%;

Base Cale. No. Rev. No. sequence No Revise Appendix 1 Table as follows, per change package 14658. (Changes shown in boldface)

Calculation Appendix 1, Page 60 Standby diesel generator speed/frequency is adjusted using a hydraulic actuator controlled remotely from the control room (RL015) or locally in the standby diesel generator rooms on NE106 or NE107. In addition, speed signal generators on the standby diesel generators provide input to speed switches in the diesel engine gauge and control panels (KJ121 and KJ122). Speed/frequency controls required for PFSSD are identified in the following table:

COMPONENT LOCATION 'DESCRIPTION .

KJHS0009 NE107 Diesel qenerator A master transfer hand switch KJHS0001D NE107 Diesel generator A emergency start hand switch NEHS0005 RL015 Diesel generator A unit parallel hand switch KJHS0007A RL015 Diesel qenerator A raise/lower hand switch KJHS0007B NE107 Diesel qenerator A raise/lower hand switch KJHS0109 NE106 Diesel generator B master transfer hand switch KJHS0101D NE106 Diesel qenerator B emerqencv start hand switch NEHS0006 RL015 Diesel generator B unit parallel hand switch KJHS0107A NE106 Diesel generator B raise/lower hand switch KJHS0107B NE106 Diesel generator B raise/lower hand switch KJSE0066 KKJ01A Diesel generator A speed signal generator KJSE0166 KKJ01B Diesel generator B speed signal generator KJSS0066 KJ121 Diesel generator A speed switch KJSS0166 KJ122 Diesel generator 8 speed switch

FORM APF-05 0-00 1-02, REV. 11 Pa g e 6 IJlY-I o.}{)()'3 CALCULATION SHEET CCN NO. _ _ _xx

_ -_E_- 0_1_3_ _ _ - ~ - ~ ~~$~f7!

Base Ca l e . No. Rev. No . Seque nce No Revise Appendix 2 Tabl e A as follows, change cable identification from llKJKOlAM to llKJKOlAQ per change package 14658 . (Changes sho wn in boldface )

TABLE A OFF-SITE POWER AND EMERGENCY DIESEL GENERATOR CABLES ASSOCIATED BUS / DIESEL CABLE DESCRIPTION GENERATOR NB01 I DGA I NB02 I DGB 11 KJK01AQ I X I I Emen:iencv Diesel A Revise Appendix 2 Table A as follows , change cable identification from 14KJK03AM to 14KJK03AQ per change package 14658. (Changes shown in boldface)

TABLE A OFF-SITE POWER AND EMERGENCY DIESEL GENERATOR CABLES ASSOCIATED BUS/ DIESEL CABLE DESCRIPTION GENERATOR NB01 I DGA I NB02 I DGB 14KJK03AQ I I I X Emerqencv Diesel B

FORM APF-OSD-001 -02, REV 11 Page 7 C..Va::6 CALCULATION SHEET CCN NO . XX- E-013 ~ ~~N.tl/,-5' Base Cal c No. Re v No . Sequence No Revise Appendix 2 Table Bas follows , change cable identification from l l KJKOlAM to llKJKOlAQ per change package 14658 . (Changes shown in boldface)

TABLE B OFF-SITE POWER CABLE ROUTING CABLE D A I C 1 I 2 8 I 16 I 27 I 5 I 6 I g 1 10 1 11 1 12 1 15 1 16 1 17 I 18 I 21 I 22 I 23 I 24 I 27 I 30 I 33 : CC1 I T-2 1 TURB I YARD 11KJK01AQ X I I I I I I I I I I I I I I I I I I I I I Revise Appendix 2 Table Bas follows , change cabl e identificat i on f rom 14KJK03AM to 14KJK03AQ per change package 14 658 . ( Changes shown in bol dface)

TABLE B OFF-SITE POWER CABLE ROUTING D A C CABLE 2 8 16 27 5 6 9 10 11 12 15 16 17 18 21 22 23 24 27 30 33 CC1 T-2 TURB YARD 14KJK03AQ X

FORM APf-050-001-02, REV 11 Page 8 cJ/0)3' CALCULATION SHEET CCN NO. XX-E-013 .-etfflfl-1. ~~~ /4d¥.5 Base Cale No. Rev No . Sequence No Revise Appendix 3 as follows to add DG Speed Signa l Generators and Speed Switches to the PFSSD equipment list and to revise the PFSSD equipment list per change package 14658. (Changes shown in boldface)

KJSE0066 Diesel Generalor A Speed 5203 D-1 KKJ01A s R,M,H X X X E-13KJ01A M-018--00106 Signal Generalor M-018-00259/1 KJSE0166 Diesel Generator B Speed 5201 D-2 KKJ01B s R,M,H X X X X E-13KJ03A M-018-00106 4 Signal Generator M-018-00259/2 KJSS0066 Diesel Generator A Speed 5203 D-1 KJ121 s R,M, H X X X E-13KJ01A M-018-00106 Swilch M-018-00259/1 KJSS0166 Diesel Generalor B Speed 5201 0-2 KJ122 s R, M,H X X X X E-13KJ03A M-018-00106 Switch M-018-00259/2

FORM APF 05F-00 1-01, REV. 04 PAGE 9 OF 13 DESIGN VERIFICATION REPORT DOCUMENT TITLE: Post-Fire Safe Shutdown (PFSSD) Analysis ORIGINATOR: Bruce Reed/Howard Meyer DESIGN VERIFIED: SAFETY CLASSIFICATION: VERIFICATION METHOD:

D PRELIMINARY 0 SAFETY-RELATED ~ DESIGN REVIEW

~ FINAL ~ SPECIAL SCOPE 0 ALTERNATE CALCULATION D REVISION 0 NON-SAFETY RELATED D TESTING

~ INDIVIDUAL VERIFICATION SIGNATURE: DATE: 5/20/2014

~R-~

QUALIFICATION REQUIRED---

ES9280465 OR ES9280479 D TEAM VERIFICATION SIGNATURE: DATE:

Scope Verified:

TEAM LEADER SIGNATURE: DATE:

QUALIFICATION REQUIRED ES9280465 OR ES9280479

  • Team leader signature certifies that adequate interfaces and overlaps have occurred.

OVERVIEW (PURPOSE AND SCOPE):

Change package 14658 is replacing cable from EDGs speed s ignal generators to the EDGs speed switches. Appendices 1, 2 and 3 of Calculation XX-E-0 13 are updated to reflect these changes. The EDG speed signal generators and the EOG speed switches are being added as PFSSD components.

CRUCIAL AREAS:

I . Verify that the new components and cable numbers are accurately depicted.

2. Verify the Database Input sheet is filled out correctly.
3. Verify the assumptions and methodology of the parent calculation are maintained.

ALTERNATE OR INDEPENDENT ITEMS USED FOR VERIFICATION:

l. Calculation XX-E-01 3, Rev. 3
2. DCP 14658 and associated drawings.

FORM APF05F-OOI -O l , REV. 04 DESIGN VERIFICATION REPORT DOCUMENT NO. REV. 0 COMMENTS: ORIGINATOR'S RESPONSE:

I. Delete E-1 F99 l Ofrom the Additional Controlled Documents Deleted E-1F9910 from the Additional Controll ed on page 3 of the CCN. E-1F99 l O is not used as an input to Documents.

XX-E-01 3.

2. On Page 3, Additional Components the components are Corrected Asset numbers.

dup licated. Two of the components should be ' SS' instead of

'SE'.

3. On Page 5, In the new wording in the paragraph above the Corrected Asset number.

table replace KJ 12 with KJI 22.

4. On Page 8, add instrument locations for the four new Added instrument locations and appropriate sheet components consistent with the table on page 5. Also in the numbers to drawings.

Other Drawings column, add the applicable sheet number fo llowing drawing M-0 18-00259.

CONCLUSIONS:

Following incorporation of the above comments, the calculation change notice accurately reflects the crucial areas selelected fo r review and is acceptable.

FORM APF 05F-OOI-Ol , REV. 04 DESIGN VERIFICATION REPORT REV.O TABLE A (This table is required for change packages, or when required by a Supervisor.) If the answer to the question is yes, then provide a descriptive answer that explains why you came to this conclusion. If the question is not a licable, then rovide a descri tive ex la nation detailin wh it is not a licable.

1. Were the design inputs correctly selected and incorporated into the design?

2 . Are assumptions , necessary to perform the design activity ,

documented, adequately described and reasonable?

3. Are the appropriate quality and quality assuran ce requirements specified?
4. Are the appl icabl e codes , standards and regulatory requi remen ts, including issue a n d addenda , properly identified and are thei r requirements f or design met?
5. Has applicable plant and industry construction and operating experience been considered?
6. Have the hardware interface design requirements been satisfied?
7. Is the output reasonable compared to input?
8. Are the specified parts , equipment and processes suitable for the required application?
9. Are the spec i fied materials compatible with each other and the design environmenta l conditions to which the material will be exposed?

FORM APF OSF-001-01 , REV. 04 DESIGN VERIFICATION REPORT TABLE A (This table is required for change packages, or when required by a Supervisor.) lfthe answer to the question is yes, then provide a descriptive answer that expla ins why you came to this conclusion. If the question is not a licable, then rovide a descri tive ex lanation detailin wh it is not a licable.

10 . Have adequate maintenance features and requirements been specified?

11. Are accessibility and other design provisions adequate for performance of needed maintenance and repair?
12. Has adequate accessibility been provided to perform the in-service inspect i on expected t o be requi red during the plant life?

13 . Has the design properly considered radiation exposure to the public a n d plant personne l ?

14. Have adequate pre-operational and subsequent periodic test requirements been appropriately specified?
15. Does each docu ment contain the required signatures and date?

16 . If a computer program was used in the analysis, has the program been verified?

17. If a component has been added, has a Safety Classification Analysis been completed?
18. Were the commitments provided in the USAR and the Design Criteria documents correctly incorporated into the design documents?

FORM APF OSF-001-01 , REV. 04 PAGE 13 OF 13

~~ <'

DESIGN VERIFICATION REPORT DOCUMENT NO. XX-E-013 99~ E?*99? # 4/.Jtl, ,o~_s- REV.O TABLE A (This table is required for change packages, or when required by a Supervisor.) If the answer to the question is yes, then provide a descriptive a nswer that explains why you came to this conclusion. If the question is not aoolicable, then provide a descriptive explanation detailing why it is not annlicable.

19. Have the appropriate design documents been identified and/or updated?
20. Has warehouse stock been considered for modification or retirement?