ML23135A197
Text
FORM APF-05D-001-02, REV. 12 CALCULATION CHANGE NOTICE CCN NO.
XX-E-013 Base Calc No.
- 004 Rev No.
Page 1 CN009 Sequence No.
CALCULATION TITLE - From CALCULATION TITLE field in EIS:
POST-FIRE SAFE SHUTDOWN (PFSSD) ANALYSIS COMPUTER CODE: N/A VERSION:
Administrative?
YES NO ASSOCIATED ENGINEERING CHANGE #: CP020292 R0 REGULATORY REVIEWS:
Attached Attached to:
Not Applicable Evaluation #
CP020292 R0 N/A Only if Administrative USAR STATEMENT:
Requires a change to the USAR:
Does NOT require a change to the USAR ANY DOCUMENTS IMPACTED?
YES If yes, enter: SWO #, or Condition Report #, if applicable.
NO Status:
COMMITTED FINAL VOID SUPERSEDED ORIG DigsigOrg 2.8, 0.7 Greg Yerino (qualified) / Alex Wurtz (non-qualified)
Printed Name
/
Signature QUALIFICATION REQUIRED:
5/25/2022 Date ES9280479 ORIG Printed Name Signature QUALIFICATION REQUIRED:
Date ES9280479 VERF DigsigVer 2.8, 0.7 Brian Fox (qualified)
Printed Name Signature QUALIFICATION REQUIRED:
6/13/2022 Date ES9280479 VERF Printed Name Signature QUALIFICATION REQUIRED:
Date ES9280479 APP DigsigApp 2.8, 0.7 Jeff Suter Printed Name Signature 07/12/2022 Date APP Printed Name Signature Date DigsigCert 3.5 1.75 RPE Certification (For ASME Section III Stress Reports/Design Reports, refer to AP 05D-001 for qualification requirements)
Joseph D.
Helget 2022.07.26 14:04:23
-05'00'
FORM APF-05D-001-02, REV. 12 CALCULATION CHANGE NOTICE CCN NO.
XX-E-013 Base Calc No.
- 004 Rev No.
Page 2 CN009 Sequence No.
CALCULATION SUBJECT (Statement Of Problem) - Enter this in SUBJECT field in EIS:
This change incorporates changes per CP 020292 (Substation Transformers NO. 8, 9, 10 & 11 and Breakers Replacement R25) removes breakers switchyard breakers 13-8 and 13-48 and replaces them with new switchyard breakers 13-49 and 13-50, respectively. This change in breakers is detailed on WIP-KD-7496-073-B-1, R0. XX-E-013 Appendix 3 references the 13-8 and 13-48 breaker numbers. This CCN changes the breaker numbers referenced in Appendix 3 to 13-49 and 13-50.
FORM APF-05D-001-02, REV. 12 CALCULATION DATABASE INPUT CCN NO.
XX-E-013 Base Calc No.
- 004 Rev No.
Page 3 CN009 Sequence No.
Link new systems to the calculation/CCN in EIS.
Systems Affected:
XX Develop relationships between interdependent calculations in EIS.
Additional Calculations Providing Input to this calculation:
NONE Additional Calculations Impacted by this calculation:
NONE Develop relationships between the calculation/CCN and controlled reference documents in EIS.
Additional Controlled Documents Inputs to this calculation:
KD-7496, Rev. 74 Additional Controlled Documents Impacted by this calculation:
NONE The reference documents listed below are those that cannot be linked to the calculation/CCN and shall be entered in the INDUSTRY REFERENCE field in EIS, e.g., ASME Codes, ANSI Standards, letters, etc.
Additional Other Reference Documents:
NONE Link new components to the calculation/CCN in EIS.
Additional Components:
NONE REFER TO DESKTOP GUIDE FOR PROCESSING CALCULATIONS IN EIS
FORM APF-05D-001-02, REV. 12 LIST OF EFFECTIVE PAGES CCN NO.
XX-E-013 Base Calc No.
- 004 Rev No.
Page 4 CN009 Sequence No.
CCN Page No.
Calc.
Page Affected DVR/SCRN/
Other CCN Page No.
Calc.
Page Affected
/DVR/SCRN
/Other CCN Page No.
Calc.
Page Affected
/DVR/SCRN
/Other CCN Page No.
Calc.
Page Affected
/DVR/SCRN
/Other 1-5 None 6
App. 3 Page 116 7
App. 3 Page 118 8
= Calculation Verification Report (if applicable)
SCRN = Regulatory Screening (if applicable)
= Applicability Determination
FORM APF-05D-001-02, REV. 12 CALCULATION SHEET CCN NO.
XX-E-013 Base Calc. No.
- 004 Rev. No.
Page 5 CN009 Sequence No XX-E-013-004-CN009 change summary:
This change incorporates changes per CP 020292 (Substation Transformers NO. 8, 9, 10 & 11 and Breakers Replacement R25) that removes breakers switchyard breakers 13-8 and 13-48 and replaces them with new switchyard breakers 13-49 and 13-50, respectively. The breakers are detailed on KD-7496. XX-E-013 Appendix 3 references the 13-8 and 13-48 breaker numbers. This CCN changes the breaker numbers referenced in Appendix 3 to 13-49 and 13-50.
XX-E-013 impact:
The calculation main body is not affected by this change (there are no changes to Results, Conclusions, Assumptions, Design Inputs, Methodology, Nomenclature, or Computations).
Appendix 1 is not affected by this change.
Appendix 2 is not affected by this change.
Appendix 3 is affected by this change as shown on the following pages.
Appendix 4 is not affected by this change.
Appendix 5 is not affected by this change.
Appendix 6 is not affected by this change. is not affected by this change.
FORM APF-05D-001-02, REV. 12 CALCULATION SHEET CCN NO.
XX-E-013 Base Calc. No.
- 004 Rev. No.
Page 6 CN009 Sequence No or NB02
FORM APF-05D-001-02, REV. 12 CALCULATION SHEET CCN NO.
XX-E-013 Base Calc. No.
- 004 Rev. No.
Page 7 CN009 Sequence No 13-49
FORM APF-05D-001-02, REV. 12 CALCULATION SHEET CCN NO.
XX-E-013 Base Calc. No.
- 004 Rev. No.
Page 8 CN009 Sequence No 13-49 13-50 bus NB01 or NB02.
E-1000-SY13