Category:Calculation
MONTHYEARML23135A1942023-05-0808 May 2023 Calculation XX-E-013 Rev. 4, CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1952023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN006, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1972023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN009, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1982023-05-0808 May 2023 Calculation XX-E-013, Rev. 4, CN008, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2002023-05-0808 May 2023 Calculation XX-E-013, Rev. 4, CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2022023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN007, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2032023-05-0808 May 2023 Calculation XX-E-013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2062023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN004, Post-Fire Safe Shutdown (PFSSD) Analysis WO 23-0006, Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) Analysis2023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1922022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN003, Post-Fire Safe Shutdown (PFSSD) Analysis WO 22-0006, Ccn No. XX-E-013, Revision 4, Sequence No. CN002, Post-Fire Safe Shutdown (PFSSD) Analysis2022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A2062022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN006, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A2032022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN005, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A2012022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN004, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1982022-05-18018 May 2022 Calculation No. XX-E-013, Revision 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1972022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN008, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1962022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN007, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1562021-06-0707 June 2021 4 to Updated Safety Analysis Report, E-013, Rev 4_CN008, Post-Fire Safe Shutdown (PFSSD) Analysis ML20290A6162020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Calculation Change Notice XX-E013, Rev. 4, Seq. CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML20290A6132020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Calculation XX-E013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML20290A6142020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Calculation Change Notice XX-E013, Rev. 4, Seq. CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML20290A6172020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Calculation Change Notice XX-E013, Rev 4, Seq. CN004, Post-Fire Safe Shutdown (PFSSD) Analysis ML20290A6182020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Calculation Change Notice XX-E013, Rev 4, Seq. CN005, Post-Fire Safe Shutdown (PFSSD) Analysis ML18121A1372018-04-25025 April 2018 Procedure, AP 078-004, Revision 21, Offsite Dose Calculation Manual (Radiological Environmental Monitoring Program). ML18121A1362018-04-25025 April 2018 Procedure, AP 078-003, Revision 8, Offsite Dose Calculation Manual. ML18093B0042018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Post-Fire Safe Shutdown (Pfssd) Analysis, XX-E-013, Rev 4 ML18093B0102018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Post-Fire Safe Shutdown (Pfssd) Analysis, XX-E-013, Rev 4, Sequence CN004 ML18093B0082018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Post-Fire Safe Shutdown (Pfssd) Analysis, XX-E-013, Rev 4, Sequence CN003 ML18093B0062018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Post-Fire Safe Shutdown (Pfssd) Analysis, XX-E-013, Rev 4, Sequence CN002 ML17151B0422015-10-22022 October 2015 Calculation Change Notice XX-E-013, Rev 4, CN003, Post-Fire Safe Shutdown Analysis ML17151B0402015-10-22022 October 2015 Calculation No. XX-E-013, Rev 4, Post-Fire Safe Shutdown Analysis ML17151B0412015-10-22022 October 2015 Calculation Change Notice XX-E-013-004-CN002, Rev 4, Post-Fire Safe Shutdown Analysis ET 13-0035, Fire Protection Program Re Alternative Shutdown Capability2013-11-21021 November 2013 Fire Protection Program Re Alternative Shutdown Capability ML12129A3852011-08-31031 August 2011 Enclosure I, Wolf Creek Nuclear Operating Corporation Administrative Procedure AP 07B-003, Revision 7, Offsite Dose Calculation Manual. ML12129A3862011-06-22022 June 2011 Enclosure II, Wolf Creek Nuclear Operating Corporation Administrative Procedure AP 07B-004, Revision 18, Offsite Dose Calculation Manual (Radiological Environmental Monitoring Program). ML0712700402007-04-27027 April 2007 Administrative Procedure AP 07B-003, Revision 6, Offsite Dose Calculation Manual. ML0512403512005-04-29029 April 2005 Attachment II, Wolf Creek Generating Station, Administrative Procedure AP 07B-004, Revision 8, Offsite Dose Calculation Manual (Radiological Environmental Monitoring Program). ML0512403482004-09-29029 September 2004 Attachment I, Wolf Creek Generating Station, Administrative Procedure AP 07B-003, Revision 5, Offsite Dose Calculation Manual. ML0429500902004-09-29029 September 2004 Attachment I, Administrative Procedure AP 07B-003, Revision 5, Offsite Dose Calculation Manual. ML0429500942003-05-22022 May 2003 Attachment II, Administrative Procedure AP 07B-004, Revision 5, Offsite Dose Calculation Manual (Radiological Environmental Monitoring Program). 2023-05-08
[Table view] Category:Fire Protection Plan
MONTHYEARWO 23-0006, Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) Analysis2023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2062023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN004, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2032023-05-0808 May 2023 Calculation XX-E-013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2022023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN007, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2002023-05-0808 May 2023 Calculation XX-E-013, Rev. 4, CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1992023-05-0808 May 2023 Fire Hazard Analysis Report, E-1F9905 Rev 11, Post-Fire Shutdown Operator Manual Actions ML23135A1982023-05-0808 May 2023 Calculation XX-E-013, Rev. 4, CN008, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1972023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN009, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1962023-05-0808 May 2023 Report, E-1F9900 Rev 10, Redacted, Post-Fire Shutdown Operator Manual Actions ML23135A1952023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN006, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1942023-05-0808 May 2023 Calculation XX-E-013 Rev. 4, CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1922023-05-0808 May 2023 Report, E-1F9910 Rev 17, Post-Fire Shutdown Operator Manual Actions ML23135A1902023-05-0808 May 2023 Report, M-6630-00017A, Revision W08, Fire Protection Evaluation for Penetrant Size Exceeding Typical Detail FB-1 Limitation ML23135A1892023-05-0808 May 2023 Report, M-6630-00017A, Revision W08, Structural Steel Fireproofing Data ML23135A1882023-05-0808 May 2023 Report, M-6630-00017A, Revision W08, Fire Protection Evaluation for Unique or Unbounded Fire Wrap Configurations, Attachments C to G3C ML23135A1872023-05-0808 May 2023 Report M-6630-00017A, Revision W08, Fire Protection Evaluation for Unique or Unbounded Fire Barrier Configurations ET 23-0004, Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2023-01-26026 January 2023 Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23135A2042022-11-0909 November 2022 E-1F9915, Rev. 16, Design Basis Document for Ofn RP-017, Control Room Evacuation WO 22-0006, Ccn No. XX-E-013, Revision 4, Sequence No. CN002, Post-Fire Safe Shutdown (PFSSD) Analysis2022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A2062022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN006, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A2032022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN005, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A2022022-05-18018 May 2022 E-IF9900, Post-Fire Safe Shutdown Operator Manual Actions, Rev. 10 ML22152A2012022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN004, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A2002022-05-18018 May 2022 E-1F9915, Revision 15, Design Basis Document for Ofn RP-017, Control Room Evacuation ML22152A1982022-05-18018 May 2022 Calculation No. XX-E-013, Revision 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1972022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN008, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1962022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN007, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1932022-05-18018 May 2022 E-1F9905, Revision 11, Fire Hazard Analysis ML22152A1922022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1852022-05-18018 May 2022 M-6630-00017A, Revision W08, Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configurations, Appendices B7 Though B13 ML22152A1832022-05-18018 May 2022 M-6630-00017A, Appendix G3D to Attachment H, Structural Steel Fireproofing Data, Page G3D-1 of G3D-50 to G5A-63 of G5A-63 ML22152A1822022-05-18018 May 2022 M-6630-00017A, Attachments C to Appendix G3C, Fire Protection Evaluations for Unique or Unbounded Fire Wrap Configurations ML22152A1812022-05-18018 May 2022 M-6630-00017A, Revision W08, Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configurations, Cover Through Appendix B6 WO 21-0011, Fire Hazards Analysis, XX-E013, Rev 4, CN004, Post-Fire Safe Shutdown (PFSSD) Analysis2021-06-0707 June 2021 Fire Hazards Analysis, XX-E013, Rev 4, CN004, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1672021-06-0707 June 2021 Fire Hazards Analysis, XX-E-013, Rev 4_CN005, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1662021-06-0707 June 2021 Fire Hazards Analysis, E-1F9910, Rev 16, CN16-01, Post Fire Safe Shutdown Area Analysis ML21168A1652021-06-0707 June 2021 Fire Hazards Analysis, E-1F9915, Rev 14, Design Basis Document for Procedure Ofn RP-017 ML21168A1632021-06-0707 June 2021 Fire Hazards Analysis, E-1F9905, Rev. 10, Fire Hazard Analysis ML21168A1622021-06-0707 June 2021 Fire Hazards Analysis, XX-E-013, Rev 4_CN006, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1612021-06-0707 June 2021 Fire Hazards Analysis, XX-E013, Rev 4, CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1592021-06-0707 June 2021 Fire Hazards Analysis, XX-E013, Rev 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1552021-06-0707 June 2021 XX-E-013, Rev 4, CN007, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1542021-06-0707 June 2021 XX-E013,Rev 4, CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1532021-06-0707 June 2021 Fire Hazards Analysis E-1F9900, Rev 9 - Redacted, Post Fire Safe Shutdown Operator Manual Actions ML20290A6182020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Calculation Change Notice XX-E013, Rev 4, Seq. CN005, Post-Fire Safe Shutdown (PFSSD) Analysis ML20290A6172020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Calculation Change Notice XX-E013, Rev 4, Seq. CN004, Post-Fire Safe Shutdown (PFSSD) Analysis ML20290A6162020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Calculation Change Notice XX-E013, Rev. 4, Seq. CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML20290A6142020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Calculation Change Notice XX-E013, Rev. 4, Seq. CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML20290A6132020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Calculation XX-E013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML20290A6122020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, E-1F9915, Rev. 13, Design Basis Document for Ofn RP-017, Control Room Evacuation 2023-05-08
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23135A1682023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML23135A1252023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 2, Figures ML23135A1642023-05-0808 May 2023 6 to Updated Safety Analysis Report, Cover Sheet ML23135A1692023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 4, Reactor ML23135A1232023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 11, Figures ML23135A1662023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 2, Site Characteristics ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23135A1212023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 7, Figures ML23135A1762023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23135A1812023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 15, Accident Analysis ML23135A1842023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements - Part 1 of 2 ML23135A1742023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 8, Electric Power ML23135A1822023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 16, Relocated Technical Specifications ML23135A1272023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 12, Figures, Redacted ML23135A1282023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 18, Figures ML23135A1782023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 12, Radiation Protection ML23135A1732023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23135A1802023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML23135A1712023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features ML23135A1672023-05-0808 May 2023 6 to Updated Safety Analysis Report, Figures ML23135A1752023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems ML23135A1242023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 5, Figures ML23135A1652023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant ML23135A1262023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 1, Figures - Redacted ML23135A1772023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management ML23135A1192023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 8, Figures ML23135A1832023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 17, Quality Assurance ML23135A1222023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 10, Figures ML23135A1182023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 6, Figures ML23135A1792023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML23135A1852023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements - Part 2 of 2 ML23135A1202023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 9, Figures, Redacted ML23135A1702023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23135A1862023-05-0808 May 2023 6 to Updated Safety Analysis Report, List of Effective Pages (Loep) ML22152A1732022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 11, Figures ML22151A1432022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML22152A1702022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 9, Figures ML22151A1422022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements - Part 1 of 2 ML22151A1442022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML22152A1782022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 18, Figures ML22152A1692022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 8, Figures ML22151A1462022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 16, Relocated Technical Specifications ML22151A1562022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features ML22152A1752022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 2, Figures ML22152A1722022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 10, Figures ML22151A1452022-05-18018 May 2022 5 to Updated Safety Analysis Report, List of Table of Contents ML22151A1542022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22152A1682022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 6, Figures ML22151A1362022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22152A1772022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 12, Figures - Redacted 2023-05-08
[Table view] |
Text
FORM APF-050-001 -02 REV 10 Page 1 o):Jo2._
CALCULATION CHANGE NOTICE CCN NO. XX 01 3 - ~- -~ ~
/Oft Base Cale No . Rev No . Sequence No .
CALCULATION TITLE - Enter this item in CALCULATION TITLE field in EIS :
Post-Fire Safe Shutdown (PFSSD) Analysis COMPUTER CODE: N/A VERSION : N/A Administrative?
I DYES [gj NO I
ASSOCIATED CHANGE #: I DCP 14209 ON/A - only i f Administrative REGULATORY D Attached REVIEWS:
[gJ Attached to: DCP 14209 Eval uation#
USAR STATEMENT: D Requires a change to the USAR:
[8J Does not require a change to the USAR ANY DOCUMENTS D YES I f yes, Condition Report#
IMPACTED? [8J NO I Status: @ C:GMWU'T'~ Q ~ FINAL D VOID D SUPERSEDED f.8, fiiltf DigsigOrg 2. 8, 0. 7 /0/z-1//S' 8FiaR ~gx i{/;/f~t>t $. u!iL_h11s_
ORIG Printed Name ll,lQ,.(;sQ;t Date ORIG Printed Name d(/J- Date 4;., ~-1¥~//14.b Signature QUALIFICATION REQUIRED:
Signature ES9280479 ES9280479 QUALi FiCA TION REQUIRED: .
I ?l'1-:7fJ5 DigsigVer 2.8, 0.7 Date 4i2¥(t
~
VERF P t Name Date
- - ~~ VERF ~ {ed~ame /J;f /M//f7f/it/tJ
~
Signature Signature ES9280479 QUALIFICATION REQUIRED: ES9280479 QUALIFICATION REQUIRED: I I\
/o/ez.( ~.:.Jf' rA.v~ v J DigsigApp 2.8, 0. 7 APP .Jeff S.it~r :seff s~--teo e91'2:n1;n_;. APP __;J Printed Name
~~
Date Date~l~t?
~J ).-1-~ Prirtl1C - v ~ 1
- / /,, _/ ,,/~ ')\~ Signature
. I Sionature / / r
~\\\\\\\llll/1111//111,1.
~~,,~ R ' '11,.
,#~~t~---.:(o~
~ . ,cEN.Ss-_ *. ~
Digitally signed f ~i?.?J{\
~
by Brian R Fox Date:
\ ~\. _.g_J 2013.09.25
,%~-~~~f'
~.% i'ONAL ~,,,,,,~
- ~--'&'l 18:27:31 -05'00' lff((,rfll lllllll\\\\\\\\\X RPE Certification (For ASME Section III Stress Reports/Design Reports, refer to AP OSD-001 for qualification requirements)
FORM APF-OSD-001-02, REV. JO
!?age 2 CALCULATION CHANGE NOTICE CCN NO. XX-E-013 -~r - G16D2-.
-GNO-Q.i. #&
Base Cale No. Rev No. Sequence No.
CALCULATION SUBJECT (Statement Of Problem) - Enter thi s in SUBJECT field in EIS:
DCP 14209 removes the HMCP breakers from MCC cubicles NG030BF6 and NG040BF6, which were added as PFSSD components in CCN XX-E-013-003-CN004 per DCP 13800. These breaker cubicles provide power and control functions for Train A and B Emergency Diesel Generator Room supply fan motors DCGM01A and DCGM01 B, respectively. Due to breaker coordination issues, DCP 14209 will modify the power supply to supply 480 VAC power to the diesel generator room supply fan motors DCGM01A and DCGM01 B directly from new Load Center breakers NG0308 and NG0408, respectively. Breakers NG0308 and NG0408 will supply power to the fan control functions within NG030BF6 and NG04DBF6, respectively. Therefore, MCC cubicles NG030BF6 and NG040BF6 will remain as PFSSD components.
FORM APF-OS D-001-02 REV 10 Page 3 c ~
CALCULATION DATABASE INPUT CCN NO. XX-E-0 1 3 - ~ - C1001i ~
Sequenc e No .
I~,§;.
Base Cale No . Re v No .
Link systems t o the c alculation/CCN in EIS .
Systems NG Affected :
Develop relation ships between interdependent ca l culations in EIS .
Additional Calculations Non e Prov i ding Input t o this calc ulatio n :
Additional Calculations None Impa cte d by this c a lculati o n:
Develop relationships be tween the calculation/CCN a n d controlled reference d ocuments in EIS .
Additiona l Contro lled None Documents Inputs t o th i s calculation :
Additional Contro lle d None Do cuments Impacte d by this c a lculation:
The reference docume nts listed below are those that cannot be linked to the calculation /CCN and sha ll be entered in the INDUSTRY RE FERENCE field in EIS , e . g .' ASME Codes , ANSI Standards , letters , etc .
Addi tional Ot her DCP 14209 , Rev . 0 Refe r e nce Documents:
Link c omponents to the calculat i o n /CCN in EIS .
Addition al Compone nts : Non e REFER TO DESKTOP GUIDE FOR PROCESSING CALCULATIONS IN EIS
FORi'vt APF-OSD-001 -02, REV. I 0 Page 4 CO'f c.,.tv.2...
LIST OF EFFECTIVE PAGES CCN NO. XX - E-013 - -G-G - e:rOQ!i Base Cale No. Rev No. Sequence No.
CCN Cale . CCN Cale. CCN Cale. CCN Cale .
Page No. Page Page Page Page Page Page Page Affected No. Affected No . Affected No. Affected DVR/SCRN/ /DVR/SCRN /DVR/SCRN /DVR/SCRN Other /Other /Other /Other 1 N/A 2 N/A 3 N/A 4 N/A 5 N/A 6 App . 3, pgs 62 ,
86 , 87 ,
88 and 90 DVR DVR = Design Verification Report (if applicable)
SCRN Regulatory Screening (if applicable)
AD Applicability Determination
FORM A PF. 05D. 00 1.02 REV 10 Page 5
[:(YI O Va:'.).2....
CALCULATION SHEET CCN NO. XX-E- 01 3 - ~ - GH995 ~
.A Base Cale . No . Rev . No. Seque nce No Changes to XX-E-013 are described in the following pages.
The Calculation Main Body is not affected by this change.
Appendix 1 is not affected by this change.
Appendix 2 is not affected by this change.
Changes to Appendix 3 are shown on the following pages.
Appendix 4 is not affected by this change.
Attachment 1 is not affected by this change.
¥ -~ iris not affected by this change.
~,, IJ!fetfr,: b 1
,Anael=u::i::iei:it ~s not affected by this change.
FORM APF-050-00 1-02, REV 10 Page 6 CALCULATION SHEET ccN NO. XX-E-013 -
aw
~ -
daJ2-Base Cale . No . Sequence No Rev . No .
Revise Appendix 3 as follows (Changes shown in boldface). Also refer to CCN XX-E-013-003-CN004.
R System Component Fire Instrument SSD Sprtd Hot Cold Normal Alt Schematic/
SIG Description Room P&ID Other Drawings Power Source Notes E ID ID Area Location Fun Fun Stdby Shdwn Shdwn Shdwn One line V
GM DCGM01A 1 Train A Diesel Generator 5203 D-1 -- s R. M, H X X X ... M-12GM01 E-13GM01 -* NG0308 . .. 3 Ventilation Supply Fan NG03DBF6 GM GM DCGM01B GMHIS0001A 4 Train B Diesel Generator Ventilation Supply Fan 1 Train A Diesel Generator Ventilation Supply Fan HIS 5201 3601 D-2 C-27 RL020 s
s R. M, H R, M, H X
X X X X X
X M-12GM01 M-12GM01 E-13GM01A E-13GM01
-NG0408 NG0308 NG03DBF6 3
3 GM GMHIS0011A 4 Train B Diesel Generator 3601 C-27 RL020 s R, M, H X X X X M-12GM01 E-13GM01A *- NG0408 ... 3
!Ventilation Supply Fan HIS NG04DBF6 GM GMHS0011B 4 Train 8 Diesel Generator 5201 D-2 - s R, M, H - -* - X M-12GM01 E-13GM01A -- NG0408 - 3 Room Supply Fan HS NG040BF6 NG NG0308 1 Train A Diesel Generator 3301 C-9 ... s R, M,H X X X X M-12GM01 E-11NG01 ... NG03 ... 3 Room Ventilation Supply E-13NG01A Fan (DCGM01A)
NG NG0408 4 Train B Diesel Generator 3302 C-10 ... s R,M, H X X X X M-12GM01 E-11NG02 ... NG03 ... 3 Room Ventilation Supply E-1JNG01A Fan (DCGM01 B)
NG NG030BF6 1 Train A Diesel Generator Ventilation Supply Fan 5203 D-1 -* s R, M, H X X X -- -- E-13GM01 E-11NG20
-- NG0308 -* 3 NG NG04DBF6 4 Train B Diesel Generator 5201 D-2 -* s R. M, H X X X X - E-13GM01A *- NG0408 - 3 Ventilation Supply Fan
FORM APF OSF-00 1-0 1, REV. 04 PAGE I OF 5 OIi-~
DESIGN VERIFICATION REPORT DOCUMENT NO. XX-E-013-00J GN-005- $ / / ~ ~
DOCUMENT TITLE: Post-Fire Safe Shutdown (PFSSD) Analysis ORIGINATOR: Brian R. Fox
.DESIGN VERIFIED.: .SAFETY CLASSIFICATION.: .VERIFICATION METHOD.:
D PRELIMINARY D SAFETY-RELATED rE:J DESIGN REVIEW
~ FINAL ~ SPECIAL SCOPE D ALTERNATE CALCULATION D REVISION D NON-SAFETY RELATED D TESTING
~ INDIVIDUAL VERIFICATION SIGNATURE: DATE: 9/24/13 QUALIFICATION ~~Iv\~
REQUIRED---
ES9280465 OR ES9280479 D TEAM VERIFICATION SIGNATURE: DATE:
Scope Ver ified :
TEAM LEADER SIGNATURE: DATE:
QUALIFICATION REQUIRED ES9280465 OR ES9280479
- Team leader signature certifies that adeq uate interfaces and overlaps have occurred.
OVERVIEW (PURPOSE AND SCOPE):
The purpose of this CCN is to incorporate the changes to the PFSSD Analysis due to relocating the Train A and B Emergency Diesel Generator Room supply fan power supplies from MCC cubicles NG03DBF6 and NG04BF6 to Load Center Breakers NG0308 and NG0408, respectively.
CRUCIAL AREAS:
- 1. Ensure the Database Input sheet is complete and accurate.
- 2. Ensure all changes shown in Appendix 3 are complete and accurate.
- 3. Determine whether any changes, in addition to Appendix 3, should be made.
ALTERNATE OR INDEPENDENT ITEMS USED FOR VERIFICATION:
- 1. CCN XX-E-013-003-CN004
FOR.i\.1 APF OSF-00 1-01 . REV. 04 PAGE 2 OF 5
-GMV2.
DESIGN VERIFICATION REPORT DOCUMENT NO. XX-E-013-003*N005-,,,y,,r.1(1{~ V. N/A COMMENTS: ORIGINATOR'S RESPONSE:
- 1. p2: A superseded CCN should not be the sole 1. Replaced CCN XX-E-013-002-CN014 with CCN reference in line 2 of the Statement of Problem. XX-E-013-003-CN004.
Suggest that the ending of the first sentence be revised to read as follows: " ... PFSSD components in CCN XX-E-013-002-CN014 (subsequently superseded by CCN XX-E-013-003-CN004) per DCP 13800".
- 2. p3 : DCP 14209 should be added to the "Additional 2. DCP 14209 added.
Other Reference Documents" section .
- 3. p4: It is not clear why the affected pages of Appendix 3 3. Changed the affected pages to 62, 86, 87. 88 and are shown as being 61 , 85, 86 and 89. It seems that 90.
the actual affected pages would be 62, 86 , 87, 88, 90.
51
- 4. p5: It is generally an error trap to repeat detailed 4. Deleted the 1 . paragraph.
information in different areas. Suggest that the first paragraph be deleted as it is an exact duplication of what has already been stated in the Calculation Subject.
- 5. p6: Suggest that the first line above the table be 5. Changed to reference only the current CCN.
revised to not only reference the superseded CCN, but also reference the current superseding CCN .
6 . Final thought: CN005 to XX-E-013 Rev. 3 appears to 6. It is not the intent to revise portions of CN004 with revise portions of CN004 to XX-E-013 Rev. 3. The CN005. CN005 uses the current information in calculation procedure does not allow CCNs to be the parent calculation plus outstanding CCNs, revised, only superseded. Explain how or why this is which are required to be considered when acceptable. preparing a new CCN . Both CCNs need to be worked together when revising the parent calculation following implementation in MC20.
CONCLUSIONS:
The changes accomplished by CCN XX-E-013-003-CN005 are complete and accurate.
FORM APF OSF-001-01 , REV. 04 PAGE30F5
()()1-f- C )tW.Z...
DESIGN VERIFICATION REPORT DOCUMENT NO. XX-E-013-003 GP,669 ,:/hl/P/LY/~ REV. NIA TABLE A (This table is required for change packages, or when required by a Supervisor.) If the answer to the question is yes, then provide a descriptive answer that explains why you came to this conclusion. If the question is not aoolicable, then orovide a descriotive exolanation detailin!!: whv it is not aoolicable.
- 1. Were the design inputs correctly selected and incorporated into the design?
- 2. Are assumptions , necessary to perform the design activity, documented , adequately described and reasonable?
- 3. Are t h e appropriate quality and q u ality assurance requ irements specified?
- 4. Are the applicable codes , standards and regulatory requirements , including issue and addenda , properly identified and are their requirements for design met?
- 5. Has applicable plant and industry construction and operating experience been considered?
- 6. Have the hardwa re interface design requirements been sa tisfied?
- 7. I s the output reasonable compared to input?
- 8. Are the specified parts , equipment and processes suitable for the required application?
- 9. Are the specified materials compatible with each other and the design environmental conditions to which the material wi ll be exposed?
FORM APF OSF-00 1-0 l, REV. 04 PAGE 4 OF 5 DESIGN VE RIFIC ATION REPORT DOCUM ENT NO . XX-E-013-993 N995- ~
~
/4">1'//5 REV. NIA TABLE A (This table is required for change packages, or when required by a Supervisor.) If the ans wer to the question is yes, then provide a descriptive an swer that explains why you came to this conclusion. If the question is not applicable, th en provide a descriptive explanation detai ling why it is not ao olicable.
10 . Have adequate maintenance features and r e quirements been specified?
- 11. Are accessibil i ty and other des i gn p r o vi s i ons adequate for performance of neede d maintenance and repair ?
12 . Has adequate accessibi l ity been provided to per f o r m the in-service inspection e xpected to b e required during the plant life?
13 . Has th e d e s ign prope rl y cons i der e d r adi a t ion exposure to the public a nd p l ant p er s onnel?
14 . Have adequa te pre - operational and subseque nt pe riodic te s t requirement s b een appropriately specif ie d?
15 . Does each document contain the requ i red s i gnatures and date?
16 . If a computer program was used in the ana l ysi s , has the program been verified ?
17 . If a component h a s been added , has a Safety Classification Analysis been completed?
18 . Were the commitments provided in the USAR and the Design Criteria documents correctly incorporated into the design documents?
FORM APF 05F-OOl-0 1, REV. 04 PAGE 5 OF 5 c,v~-c.Na:,:l-.
DESIGN VERIFI CATION R EPORT DOCUMENT NO . XX-E-013-Ge:3 ENoo, ~#~.S- REV. NIA TABLE A (This table is required for change packages, or when required by a Supervisor.) If th e answer to the question is yes, th en provide a descriptive answer that expla ins why you came to this conclusion. If th e question is not aoolicable, then provide a descriptive explanation detailine: why it is not applicable.
19 . Have the appropriate design documents been i dentified and/or updated?
20 . Has warehous e stock been considered fo r modification or retirement ?