ML20290A614

From kanterella
Jump to navigation Jump to search
Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Calculation Change Notice XX-E013, Rev. 4, Seq. CN002, Post-Fire Safe Shutdown (PFSSD) Analysis
ML20290A614
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/23/2020
From: Wilkins W
Wolf Creek
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20290A562 List:
References
WO 20-0041 XX-E013, Rev. 4, Seq. CN002
Download: ML20290A614 (11)


Text

FORM APF-050-001 -02 REV 10 Page 1 o):Jo2._

CALCULATION CHANGE NOTICE CCN NO. XX 01 3 - ~- -~ ~

/Oft Base Cale No . Rev No . Sequence No .

CALCULATION TITLE - Enter this item in CALCULATION TITLE field in EIS :

Post-Fire Safe Shutdown (PFSSD) Analysis COMPUTER CODE: N/A VERSION : N/A Administrative?

I DYES [gj NO I

ASSOCIATED CHANGE #: I DCP 14209 ON/A - only i f Administrative REGULATORY D Attached REVIEWS:

[gJ Attached to: DCP 14209 Eval uation#

USAR STATEMENT: D Requires a change to the USAR:

[8J Does not require a change to the USAR ANY DOCUMENTS D YES I f yes, Condition Report#

IMPACTED? [8J NO I Status: @ C:GMWU'T'~ Q ~ FINAL D VOID D SUPERSEDED f.8, fiiltf DigsigOrg 2. 8, 0. 7 /0/z-1//S' 8FiaR ~gx i{/;/f~t>t $. u!iL_h11s_

ORIG Printed Name ll,lQ,.(;sQ;t Date ORIG Printed Name d(/J- Date 4;., ~-1¥~//14.b Signature QUALIFICATION REQUIRED:

Signature ES9280479 ES9280479 QUALi FiCA TION REQUIRED: .

I ?l'1-:7fJ5 DigsigVer 2.8, 0.7 Date 4i2¥(t

~

VERF P t Name Date

- - ~~ VERF ~ {ed~ame /J;f /M//f7f/it/tJ

~

Signature Signature ES9280479 QUALIFICATION REQUIRED: ES9280479 QUALIFICATION REQUIRED: I I\

/o/ez.( ~.:.Jf' rA.v~ v J DigsigApp 2.8, 0. 7 APP .Jeff S.it~r :seff s~--teo e91'2:n1;n_;. APP __;J Printed Name

~~

Date Date~l~t?

~J ).-1-~ Prirtl1C - v ~ 1

- / /,, _/ ,,/~ ')\~ Signature

. I Sionature / / r

~\\\\\\\llll/1111//111,1.

~~,,~ R ' '11,.

,#~~t~---.:(o~

~ . ,cEN.Ss-_ *. ~

Digitally signed f ~i?.?J{\

~

  • 295 = ~

by Brian R Fox Date:

\ ~\. _.g_J 2013.09.25

,%~-~~~f'

~.% i'ONAL ~,,,,,,~

~--'&'l 18:27:31 -05'00' lff((,rfll lllllll\\\\\\\\\X RPE Certification (For ASME Section III Stress Reports/Design Reports, refer to AP OSD-001 for qualification requirements)

FORM APF-OSD-001-02, REV. JO

!?age 2 CALCULATION CHANGE NOTICE CCN NO. XX-E-013 -~r - G16D2-.

-GNO-Q.i. #&

Base Cale No. Rev No. Sequence No.

CALCULATION SUBJECT (Statement Of Problem) - Enter thi s in SUBJECT field in EIS:

DCP 14209 removes the HMCP breakers from MCC cubicles NG030BF6 and NG040BF6, which were added as PFSSD components in CCN XX-E-013-003-CN004 per DCP 13800. These breaker cubicles provide power and control functions for Train A and B Emergency Diesel Generator Room supply fan motors DCGM01A and DCGM01 B, respectively. Due to breaker coordination issues, DCP 14209 will modify the power supply to supply 480 VAC power to the diesel generator room supply fan motors DCGM01A and DCGM01 B directly from new Load Center breakers NG0308 and NG0408, respectively. Breakers NG0308 and NG0408 will supply power to the fan control functions within NG030BF6 and NG04DBF6, respectively. Therefore, MCC cubicles NG030BF6 and NG040BF6 will remain as PFSSD components.

FORM APF-OS D-001-02 REV 10 Page 3 c ~

CALCULATION DATABASE INPUT CCN NO. XX-E-0 1 3 - ~ - C1001i ~

Sequenc e No .

I~,§;.

Base Cale No . Re v No .

Link systems t o the c alculation/CCN in EIS .

Systems NG Affected :

Develop relation ships between interdependent ca l culations in EIS .

Additional Calculations Non e Prov i ding Input t o this calc ulatio n :

Additional Calculations None Impa cte d by this c a lculati o n:

Develop relationships be tween the calculation/CCN a n d controlled reference d ocuments in EIS .

Additiona l Contro lled None Documents Inputs t o th i s calculation :

Additional Contro lle d None Do cuments Impacte d by this c a lculation:

The reference docume nts listed below are those that cannot be linked to the calculation /CCN and sha ll be entered in the INDUSTRY RE FERENCE field in EIS , e . g .' ASME Codes , ANSI Standards , letters , etc .

Addi tional Ot her DCP 14209 , Rev . 0 Refe r e nce Documents:

Link c omponents to the calculat i o n /CCN in EIS .

Addition al Compone nts : Non e REFER TO DESKTOP GUIDE FOR PROCESSING CALCULATIONS IN EIS

FORi'vt APF-OSD-001 -02, REV. I 0 Page 4 CO'f c.,.tv.2...

LIST OF EFFECTIVE PAGES CCN NO. XX - E-013 - -G-G - e:rOQ!i Base Cale No. Rev No. Sequence No.

CCN Cale . CCN Cale. CCN Cale. CCN Cale .

Page No. Page Page Page Page Page Page Page Affected No. Affected No . Affected No. Affected DVR/SCRN/ /DVR/SCRN /DVR/SCRN /DVR/SCRN Other /Other /Other /Other 1 N/A 2 N/A 3 N/A 4 N/A 5 N/A 6 App . 3, pgs 62 ,

86 , 87 ,

88 and 90 DVR DVR = Design Verification Report (if applicable)

SCRN Regulatory Screening (if applicable)

AD Applicability Determination

FORM A PF. 05D. 00 1.02 REV 10 Page 5

[:(YI O Va:'.).2....

CALCULATION SHEET CCN NO. XX-E- 01 3 - ~ - GH995 ~

.A Base Cale . No . Rev . No. Seque nce No Changes to XX-E-013 are described in the following pages.

The Calculation Main Body is not affected by this change.

Appendix 1 is not affected by this change.

Appendix 2 is not affected by this change.

Changes to Appendix 3 are shown on the following pages.

Appendix 4 is not affected by this change.

Attachment 1 is not affected by this change.

¥ -~ iris not affected by this change.

~,, IJ!fetfr,: b 1

,Anael=u::i::iei:it ~s not affected by this change.

FORM APF-050-00 1-02, REV 10 Page 6 CALCULATION SHEET ccN NO. XX-E-013 -

aw

~ -

daJ2-Base Cale . No . Sequence No Rev . No .

Revise Appendix 3 as follows (Changes shown in boldface). Also refer to CCN XX-E-013-003-CN004.

R System Component Fire Instrument SSD Sprtd Hot Cold Normal Alt Schematic/

SIG Description Room P&ID Other Drawings Power Source Notes E ID ID Area Location Fun Fun Stdby Shdwn Shdwn Shdwn One line V

GM DCGM01A 1 Train A Diesel Generator 5203 D-1 -- s R. M, H X X X ... M-12GM01 E-13GM01 -* NG0308 . .. 3 Ventilation Supply Fan NG03DBF6 GM GM DCGM01B GMHIS0001A 4 Train B Diesel Generator Ventilation Supply Fan 1 Train A Diesel Generator Ventilation Supply Fan HIS 5201 3601 D-2 C-27 RL020 s

s R. M, H R, M, H X

X X X X X

X M-12GM01 M-12GM01 E-13GM01A E-13GM01

-NG0408 NG0308 NG03DBF6 3

3 GM GMHIS0011A 4 Train B Diesel Generator 3601 C-27 RL020 s R, M, H X X X X M-12GM01 E-13GM01A *- NG0408 ... 3

!Ventilation Supply Fan HIS NG04DBF6 GM GMHS0011B 4 Train 8 Diesel Generator 5201 D-2 - s R, M, H - -* - X M-12GM01 E-13GM01A -- NG0408 - 3 Room Supply Fan HS NG040BF6 NG NG0308 1 Train A Diesel Generator 3301 C-9 ... s R, M,H X X X X M-12GM01 E-11NG01 ... NG03 ... 3 Room Ventilation Supply E-13NG01A Fan (DCGM01A)

NG NG0408 4 Train B Diesel Generator 3302 C-10 ... s R,M, H X X X X M-12GM01 E-11NG02 ... NG03 ... 3 Room Ventilation Supply E-1JNG01A Fan (DCGM01 B)

NG NG030BF6 1 Train A Diesel Generator Ventilation Supply Fan 5203 D-1 -* s R, M, H X X X -- -- E-13GM01 E-11NG20

-- NG0308 -* 3 NG NG04DBF6 4 Train B Diesel Generator 5201 D-2 -* s R. M, H X X X X - E-13GM01A *- NG0408 - 3 Ventilation Supply Fan

FORM APF OSF-00 1-0 1, REV. 04 PAGE I OF 5 OIi-~

DESIGN VERIFICATION REPORT DOCUMENT NO. XX-E-013-00J GN-005- $ / / ~ ~

DOCUMENT TITLE: Post-Fire Safe Shutdown (PFSSD) Analysis ORIGINATOR: Brian R. Fox

.DESIGN VERIFIED.: .SAFETY CLASSIFICATION.: .VERIFICATION METHOD.:

D PRELIMINARY D SAFETY-RELATED rE:J DESIGN REVIEW

~ FINAL ~ SPECIAL SCOPE D ALTERNATE CALCULATION D REVISION D NON-SAFETY RELATED D TESTING

~ INDIVIDUAL VERIFICATION SIGNATURE: DATE: 9/24/13 QUALIFICATION ~~Iv\~

REQUIRED---

ES9280465 OR ES9280479 D TEAM VERIFICATION SIGNATURE: DATE:

Scope Ver ified :

TEAM LEADER SIGNATURE: DATE:

QUALIFICATION REQUIRED ES9280465 OR ES9280479

  • Team leader signature certifies that adeq uate interfaces and overlaps have occurred.

OVERVIEW (PURPOSE AND SCOPE):

The purpose of this CCN is to incorporate the changes to the PFSSD Analysis due to relocating the Train A and B Emergency Diesel Generator Room supply fan power supplies from MCC cubicles NG03DBF6 and NG04BF6 to Load Center Breakers NG0308 and NG0408, respectively.

CRUCIAL AREAS:

1. Ensure the Database Input sheet is complete and accurate.
2. Ensure all changes shown in Appendix 3 are complete and accurate.
3. Determine whether any changes, in addition to Appendix 3, should be made.

ALTERNATE OR INDEPENDENT ITEMS USED FOR VERIFICATION:

1. CCN XX-E-013-003-CN004

FOR.i\.1 APF OSF-00 1-01 . REV. 04 PAGE 2 OF 5

-GMV2.

DESIGN VERIFICATION REPORT DOCUMENT NO. XX-E-013-003*N005-,,,y,,r.1(1{~ V. N/A COMMENTS: ORIGINATOR'S RESPONSE:

1. p2: A superseded CCN should not be the sole 1. Replaced CCN XX-E-013-002-CN014 with CCN reference in line 2 of the Statement of Problem. XX-E-013-003-CN004.

Suggest that the ending of the first sentence be revised to read as follows: " ... PFSSD components in CCN XX-E-013-002-CN014 (subsequently superseded by CCN XX-E-013-003-CN004) per DCP 13800".

2. p3 : DCP 14209 should be added to the "Additional 2. DCP 14209 added.

Other Reference Documents" section .

3. p4: It is not clear why the affected pages of Appendix 3 3. Changed the affected pages to 62, 86, 87. 88 and are shown as being 61 , 85, 86 and 89. It seems that 90.

the actual affected pages would be 62, 86 , 87, 88, 90.

51

4. p5: It is generally an error trap to repeat detailed 4. Deleted the 1 . paragraph.

information in different areas. Suggest that the first paragraph be deleted as it is an exact duplication of what has already been stated in the Calculation Subject.

5. p6: Suggest that the first line above the table be 5. Changed to reference only the current CCN.

revised to not only reference the superseded CCN, but also reference the current superseding CCN .

6 . Final thought: CN005 to XX-E-013 Rev. 3 appears to 6. It is not the intent to revise portions of CN004 with revise portions of CN004 to XX-E-013 Rev. 3. The CN005. CN005 uses the current information in calculation procedure does not allow CCNs to be the parent calculation plus outstanding CCNs, revised, only superseded. Explain how or why this is which are required to be considered when acceptable. preparing a new CCN . Both CCNs need to be worked together when revising the parent calculation following implementation in MC20.

CONCLUSIONS:

The changes accomplished by CCN XX-E-013-003-CN005 are complete and accurate.

FORM APF OSF-001-01 , REV. 04 PAGE30F5

()()1-f- C )tW.Z...

DESIGN VERIFICATION REPORT DOCUMENT NO. XX-E-013-003 GP,669 ,:/hl/P/LY/~ REV. NIA TABLE A (This table is required for change packages, or when required by a Supervisor.) If the answer to the question is yes, then provide a descriptive answer that explains why you came to this conclusion. If the question is not aoolicable, then orovide a descriotive exolanation detailin!!: whv it is not aoolicable.

1. Were the design inputs correctly selected and incorporated into the design?
2. Are assumptions , necessary to perform the design activity, documented , adequately described and reasonable?
3. Are t h e appropriate quality and q u ality assurance requ irements specified?
4. Are the applicable codes , standards and regulatory requirements , including issue and addenda , properly identified and are their requirements for design met?
5. Has applicable plant and industry construction and operating experience been considered?
6. Have the hardwa re interface design requirements been sa tisfied?
7. I s the output reasonable compared to input?
8. Are the specified parts , equipment and processes suitable for the required application?
9. Are the specified materials compatible with each other and the design environmental conditions to which the material wi ll be exposed?

FORM APF OSF-00 1-0 l, REV. 04 PAGE 4 OF 5 DESIGN VE RIFIC ATION REPORT DOCUM ENT NO . XX-E-013-993 N995- ~

~

/4">1'//5 REV. NIA TABLE A (This table is required for change packages, or when required by a Supervisor.) If the ans wer to the question is yes, then provide a descriptive an swer that explains why you came to this conclusion. If the question is not applicable, th en provide a descriptive explanation detai ling why it is not ao olicable.

10 . Have adequate maintenance features and r e quirements been specified?

11. Are accessibil i ty and other des i gn p r o vi s i ons adequate for performance of neede d maintenance and repair ?

12 . Has adequate accessibi l ity been provided to per f o r m the in-service inspection e xpected to b e required during the plant life?

13 . Has th e d e s ign prope rl y cons i der e d r adi a t ion exposure to the public a nd p l ant p er s onnel?

14 . Have adequa te pre - operational and subseque nt pe riodic te s t requirement s b een appropriately specif ie d?

15 . Does each document contain the requ i red s i gnatures and date?

16 . If a computer program was used in the ana l ysi s , has the program been verified ?

17 . If a component h a s been added , has a Safety Classification Analysis been completed?

18 . Were the commitments provided in the USAR and the Design Criteria documents correctly incorporated into the design documents?

FORM APF 05F-OOl-0 1, REV. 04 PAGE 5 OF 5 c,v~-c.Na:,:l-.

DESIGN VERIFI CATION R EPORT DOCUMENT NO . XX-E-013-Ge:3 ENoo, ~#~.S- REV. NIA TABLE A (This table is required for change packages, or when required by a Supervisor.) If th e answer to the question is yes, th en provide a descriptive answer that expla ins why you came to this conclusion. If th e question is not aoolicable, then provide a descriptive explanation detailine: why it is not applicable.

19 . Have the appropriate design documents been i dentified and/or updated?

20 . Has warehous e stock been considered fo r modification or retirement ?