ML20290A564
From kanterella
Jump to navigation
Jump to search
ML20290A564 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 07/23/2020 |
From: | Wolf Creek |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML20290A562 | List:
|
References | |
WO 20-0041 | |
Download: ML20290A564 (1) | |
Similar Documents at Wolf Creek | |
---|---|
Category:Letter
MONTHYEARIR 05000482/20244202024-10-31031 October 2024
[Table view]Security Baseline Inspection Report 05000482/2024420 ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) 2024-09-06 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML24114A1912024-04-15015 April 2024
[Table view]Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9910, Rev. 19, Post-Fire Safe Shutdown Area Analysis ML24114A1602024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Revision W01, Attachment C Through G3C, Fire Protection Evaluations for Unique or Unbounded Fire Wrap Configurations ML24114A1482024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 8, Figures ML24114A1882024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN007, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1892024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, EQSD-II, Rev. 35, Equipment Qualification Summary Document ML24114A1742024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Drawing E-1F9900, Rev. 10, Post-Fire Safe Shutdown Operator Manual Actions ML24114A1852024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9905, Rev. 12, Fire Hazard Analysis ML24114A1862024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Rev. 14. Quality Program Manual ML24114A1782024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1592024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configurations, Rev. 4 ML24114A1362024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Cover Sheet ML24114A1382024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 7, Instrumentation and Controls ML24114A1422024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 12, Radiation Protection ML24114A1312024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 16, Relocated Technical Specifications ML24114A1752024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9910, Rev. 18, Post-Fire Safe Shutdown Area Analysis ML24114A1562024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 12, Figures ML24114A1832024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9905, Rev. 14, Fire Hazard Analysis ML24114A1802024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, EQSD-I, Rev. 19, Equipment Qualification Design Basis Document ML24114A1572024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 18, Figures ML24114A1402024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 2, Site Characteristics ML24114A1332024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 2, Figures ML24114A1322024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Questions 005.1 Through 031.20 ML24114A1372024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 8, Electric Power ML24114A1272024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements ML24114A1392024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 5, Reactor Coolant System and Connected Systems ML24114A1872024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN008, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1292024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 14, Initial Test Program ML24114A1532024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 5, Figures ML24114A1842024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN004, Post-Fire Shutdown (PFSSD) Analysis ML24114A1282024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 13, Conduct of Operating ML24114A1732024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN011, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1922024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1822024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN009, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1352024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 9, Auxiliary Systems ML24114A1522024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 11, Figures ML24114A1472024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 6, Figures ML24114A1612024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Revision W08, Appendix G3D to H, Structural Steel Fireproofing Data ML24114A1502024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 7, Figures ML24114A1342024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 4, Reactor ML24114A1772024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9915, Rev. 16, Design Basis Document for Ofn RP-017, Control Room Evaluation ML24114A1622024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Attachment B7 Through B13, Fire Protection Evaluation for Penetrant Size Exceeding Typical Detail B-1 Limitation ML24114A1242024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 3, Design of Structures, Components, Equipment, and Systems ML24114A1552024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 1, Figures ML24114A1792024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation, XX-E-013, Rev. 4-CN006, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1812024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN010, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1492024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 9, Figures ML24114A1262024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 11, Radioactive Waste Management ML24114A1512024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 10, Figures ML24114A1762024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013. Rev. 4-CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1412024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 6, Engineered Safety Features 2024-04-15 |
Text
WOLF CREEK UPDATED SAFETY ANALYSIS REPORT (USAR)
Revision - 33 Release Date - DC05 3/11/2020
Retrieved from "https://kanterella.com/w/index.php?title=ML20290A564&oldid=3418310"