Letter Sequence RAI |
---|
|
|
MONTHYEARML20141H8401997-07-30030 July 1997 Forwards Request for Addl Info Re 961126 Submittal of WOG Technical Rept,WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs Project stage: RAI ML20196J3591999-06-30030 June 1999 Forwards SE of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs Project stage: Approval 1997-07-30
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARL-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld1999-10-18018 October 1999 Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld ML20217G0801999-10-0707 October 1999 Informs That on 990930,staff Conducted mid-cycle PPR of Farley & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Will Conduct Regional Insps Associated with SG Removal & Installation ML20217P0661999-10-0606 October 1999 Requests Withholding of Proprietary Rept NSD-SAE-ESI-99-389, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217B1891999-10-0404 October 1999 Submits Clarification Re Development of Basis for Determining Limiting Internal Pressure Loads Re Review of NRC SE for Cycle 16 Extension Request.Util Intends to Use Guidelines When Evaluating SG Tube Structural Integrity ML20212J8391999-09-30030 September 1999 Forwards RAI Re Request for Amends to Ts.Addl Info Needed to Complete Review to Verify That Proposed TS Are Consistent with & Validate Design Basis Analysis.Request Discussed with H Mahan on 990930.Info Needed within 10 Days of This Ltr ML20212J8801999-09-30030 September 1999 Discusses GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps. Util 980731,990607 & 03 Ltrs Provided Requested Info in Subj Gl.Nrc Considers Subj GL to Be Closed for Unit 1 L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 21999-09-23023 September 1999 Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 21999-09-23023 September 1999 Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 ML20212F8861999-09-23023 September 1999 Forwards Revised Relief Request Number 32 for NRC Approval. Approval Requested by 991231 to Support Activities to Be Performed During Unit 1 Refueling Outage Scheduled for Spring of 2000 ML20212E7031999-09-23023 September 1999 Responds to GL 98-01, Year 2000 Readiness of Computer Sys at Npps. Util Requested to Submit Plans & Schedules for Resolving Y2K-related Issues ML20212F1111999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals ML20212C2351999-09-16016 September 1999 Submits Corrected Info Concerning Snoc Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20212D0101999-09-15015 September 1999 Informs That Submittal of clean-typed Copy of ITS & ITS Bases Will Be Delayed.Delay Due to Need for Resolution of Two Issues Raised by NRC staff.Clean-typed Copy of ITS Will Be Submitted within 4 Wks Following Resolution of Issues ML20212C4641999-09-13013 September 1999 Forwards Info Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed1999-09-13013 September 1999 Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed ML20212C8041999-09-10010 September 1999 Responds to to D Rathbun Requesting Review of J Sherman Re Y2K Compliance.Latest NRC Status Rept on Y2K Activities Encl ML20212D4581999-09-10010 September 1999 Responds to to D Rathbun,Requesting Review of J Sherman Expressing Concerns That Plant & Other Nuclear Plants Not Yet Y2K Compliant ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N8041999-09-0808 September 1999 Informs That on 990930 NRC Issued GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Condition, to Holders of Nuclear Plant Operating Licenses ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20212C0071999-09-0202 September 1999 Forwards Insp Repts 50-348/99-05 & 50-364/99-05 on 990627- 0807.No Violations Noted.Licensee Conduct of Activities at Farley Plant Facilities Generally Characterized by safety-conscious Operations & Sound Engineering ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211K2131999-08-31031 August 1999 Informs That Snoc Has Conducted Review of Reactor Vessel Integrity Database,Version 2 (RVID2) & Conclude That Latest Data Submitted for Farley Units Has Not Been Incorporated Into RVID2 ML20211K4101999-08-31031 August 1999 Resubmits Relief Requests Q1P16-RR-V-5 & Q2P16-RR-V-5 That Seek to Group V661 Valves from Each Unit Into Sample Disassembly & Insp Group,Per 990525 Telcon with NRC L-99-030, Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS1999-08-30030 August 1999 Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS ML20211G6851999-08-26026 August 1999 Informs That During Insp,Technical Issues Associated with Design,Installation & fire-resistive Performance of Kaowool Raceway fire-barriers Installed at Farley Nuclear Plant Were Identified L-99-029, Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 07271999-08-19019 August 1999 Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 0727 ML20211B9431999-08-17017 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 990101-990630,IAW 10CFR26.71(d).Rept Covers Employees at Jm Farley Nuclear Plant & Southern Nuclear Corporate Headquarters ML20211B9211999-08-17017 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-348/99-09 & 50-364/99-09.Corrective Actions:Security Response Plan Was Revised to Address Vulnerabilities Identified During NRC Insp ML20210R5101999-08-12012 August 1999 Forwards Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16 Only,Based on risk- Informed Approach for Evaluation of SG Tube Structural Integrity,As Result of Staff Comments ML20212C8141999-08-0909 August 1999 Forwards Correspondence Received from Jm Sherman.Requests Review of Info Re Established Policies & Procedures ML20210T2021999-08-0606 August 1999 Forwards Draft SE Accepting Licensee Proposed Conversion of Plant,Units 1 & 2 Current TSs to Its.Its Based on Listed Documents ML20210Q4641999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr to La Reyes,As Listed,With List of Individuals to Take exam,30 Days Before Exam Date ML20210J8341999-07-30030 July 1999 Forwards Second Request for Addl Info Re Util 990430 Amend Request to Allow Util to Operate Unit 1,for Cycle 16 Based on risk-informed Probability of SG Tube Rupture & Nominal accident-induced primary-to-second Leakage ML20210G4901999-07-30030 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, Issued 990603.Ltr Contains NRC License Commitment to Utilize ASTM D3803-1989 with Efficiency Acceptance Criteria Utilizing Safety Factor of 2 L-99-028, Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines1999-07-30030 July 1999 Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines L-99-027, Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.51999-07-27027 July 1999 Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.5 ML20210G8181999-07-26026 July 1999 Forwards Insp Repts 50-348/99-04 & 50-364/99-04 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation IR 05000348/19990091999-07-23023 July 1999 Discusses Insp Repts 50-348/99-09 & 50-364/99-09 on 990308- 10 & Forwards Notice of Violation Re Failure to Intercept Adversary During Drills,Contrary to 10CFR73 & Physical Security Plan Requirements ML20210E4071999-07-22022 July 1999 Responds to NRC 990702 RAI Re Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described in NEI 97-06, SG Program Guidelines L-99-026, Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments1999-07-19019 July 1999 Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 20011999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20209H4721999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20196J6191999-07-0202 July 1999 Forwards Final Dam Audit Rept of 981008 of Category 1 Cooling Water Storage Pond Dam.Requests Response within 120 Days of Date of Ltr 05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed1999-07-0202 July 1999 Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed ML20196J7471999-07-0202 July 1999 Forwards RAI Re Cycle 16 Extension Request.Response Requested within 30 Days of Date of Ltr ML20196J5781999-07-0202 July 1999 Forwards RAI Re 981201 & s Requesting Amend to TS Associated with Replacing Existing Westinghouse Model 51 SG with Westinghouse Model 54F Generators.Respond within 30 Days of Ltr Date ML20196J6571999-07-0202 July 1999 Discusses Closure to TAC MA0543 & MA0544 Re GL 92-01 Rev 1, Suppl 1,RV Structural Integrity.Nrc Has Revised Rvid & Releasing It as Rvid,Version 2 as Result of Review of Responses ML20196J3591999-06-30030 June 1999 Forwards SE of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217G0801999-10-0707 October 1999 Informs That on 990930,staff Conducted mid-cycle PPR of Farley & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Will Conduct Regional Insps Associated with SG Removal & Installation ML20212J8801999-09-30030 September 1999 Discusses GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps. Util 980731,990607 & 03 Ltrs Provided Requested Info in Subj Gl.Nrc Considers Subj GL to Be Closed for Unit 1 ML20212J8391999-09-30030 September 1999 Forwards RAI Re Request for Amends to Ts.Addl Info Needed to Complete Review to Verify That Proposed TS Are Consistent with & Validate Design Basis Analysis.Request Discussed with H Mahan on 990930.Info Needed within 10 Days of This Ltr ML20212E7031999-09-23023 September 1999 Responds to GL 98-01, Year 2000 Readiness of Computer Sys at Npps. Util Requested to Submit Plans & Schedules for Resolving Y2K-related Issues ML20212F1111999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals ML20212C8041999-09-10010 September 1999 Responds to to D Rathbun Requesting Review of J Sherman Re Y2K Compliance.Latest NRC Status Rept on Y2K Activities Encl ML20212D4581999-09-10010 September 1999 Responds to to D Rathbun,Requesting Review of J Sherman Expressing Concerns That Plant & Other Nuclear Plants Not Yet Y2K Compliant ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N8041999-09-0808 September 1999 Informs That on 990930 NRC Issued GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Condition, to Holders of Nuclear Plant Operating Licenses ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20212C0071999-09-0202 September 1999 Forwards Insp Repts 50-348/99-05 & 50-364/99-05 on 990627- 0807.No Violations Noted.Licensee Conduct of Activities at Farley Plant Facilities Generally Characterized by safety-conscious Operations & Sound Engineering ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211G6851999-08-26026 August 1999 Informs That During Insp,Technical Issues Associated with Design,Installation & fire-resistive Performance of Kaowool Raceway fire-barriers Installed at Farley Nuclear Plant Were Identified ML20210T2021999-08-0606 August 1999 Forwards Draft SE Accepting Licensee Proposed Conversion of Plant,Units 1 & 2 Current TSs to Its.Its Based on Listed Documents ML20210Q4641999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr to La Reyes,As Listed,With List of Individuals to Take exam,30 Days Before Exam Date ML20210J8341999-07-30030 July 1999 Forwards Second Request for Addl Info Re Util 990430 Amend Request to Allow Util to Operate Unit 1,for Cycle 16 Based on risk-informed Probability of SG Tube Rupture & Nominal accident-induced primary-to-second Leakage ML20210G8181999-07-26026 July 1999 Forwards Insp Repts 50-348/99-04 & 50-364/99-04 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation IR 05000348/19990091999-07-23023 July 1999 Discusses Insp Repts 50-348/99-09 & 50-364/99-09 on 990308- 10 & Forwards Notice of Violation Re Failure to Intercept Adversary During Drills,Contrary to 10CFR73 & Physical Security Plan Requirements ML20196J5781999-07-0202 July 1999 Forwards RAI Re 981201 & s Requesting Amend to TS Associated with Replacing Existing Westinghouse Model 51 SG with Westinghouse Model 54F Generators.Respond within 30 Days of Ltr Date ML20196J6571999-07-0202 July 1999 Discusses Closure to TAC MA0543 & MA0544 Re GL 92-01 Rev 1, Suppl 1,RV Structural Integrity.Nrc Has Revised Rvid & Releasing It as Rvid,Version 2 as Result of Review of Responses ML20196J6191999-07-0202 July 1999 Forwards Final Dam Audit Rept of 981008 of Category 1 Cooling Water Storage Pond Dam.Requests Response within 120 Days of Date of Ltr ML20196J7471999-07-0202 July 1999 Forwards RAI Re Cycle 16 Extension Request.Response Requested within 30 Days of Date of Ltr ML20196J3591999-06-30030 June 1999 Forwards SE of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs ML20196D1931999-06-22022 June 1999 Discusses Requesting Approval & Issuance of Plant Units 1 & 2 ITS by 990930.New Target Date Agrees with Requested Date ML20196H9801999-06-10010 June 1999 Submits Two RAI Re ITS Section 4.0 That Were Never Sent. Reply to RAI Via e-mail ML20196A3401999-06-10010 June 1999 Forwards Insp Repts 50-348/99-03 & 50-364/99-03 on 990404-0515.No Violations Noted ML20206R4741999-05-13013 May 1999 Informs That Staff Reviewed Draft Operation Insp Rept for Farley Nuclear Station Cooling Water Pond Dam & Concurs with FERC Findings.Any Significant Changes Made Prior to Issuance of Final Rept Should Be Discussed with NRC ML20206M2321999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Mgt Created ML20206G7341999-05-0404 May 1999 Forwards Safety Evaluation Re Completion of GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20206G2411999-04-30030 April 1999 Forwards Revised RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, Program at Farley.Requests to Be Notified of Rev to Original Target Date of 990521 ML20206R2031999-04-29029 April 1999 Forwards Insp Repts 50-348/99-02 & 50-364/99-02 on 990221-0403.No Violations Noted ML20205T1931999-04-0909 April 1999 Informs That on 990316,J Deavers & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Farley NPP for Y2K.Initial Exam Dates Are Wks of 000508 & 22 for Approx 12 Candidates.Chief Examiner Will Be C Ernstes ML20205Q1541999-04-0606 April 1999 Forwards Insp Repts 50-348/99-09 & 50-364/99-09 on 990308-10.One non-cited Violation Identified ML20205M2831999-04-0202 April 1999 Forwards Errata Ltr for Farley Nuclear Power Plant FEMA Exercise Rept.Page 19 of Original Rept Should Be Replaced with Encl Corrected Page 19 ML20196K4881999-03-19019 March 1999 Forwards Insp Repts 50-348/99-01 & 50-364/99-01 on 990110- 0220.One Violation of NRC Requirements Occurred.Violation Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20205A2611999-03-19019 March 1999 Advises of NRC Planned Insp Effort Resulting from Farley Plant Performance Review on 980202.Historical Listing of Plant Issues & Details of NRC Insp Plan for Next 8 Months Encl ML20204C9561999-03-17017 March 1999 Forwards RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, Program at Plant,Units 1 & 2.Response Requested by 990521 ML20204E6601999-03-11011 March 1999 Discusses Ofc of Investigation Rept 2-1998-024 Re Contract Worker Terminated by General Technical Svc Supervisor for Engaging in Protected Activity.Evidence Did Not Substantiate Allegation & No Further Action Planned ML20207M2181999-03-11011 March 1999 Advises That Info Contained in 990125 Application CAW-99-1318 & Affidavit Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20207M1991999-03-0808 March 1999 Partially Withheld Info Re Meeting Held on 990129 at Region II Ofc in Atlanta,Ga to Discuss Physical Protection Measure for Svc Water Intake Structure Located at Facility (Ref 10CFR73.21).List of Attendees Encl ML20206U1831999-02-0909 February 1999 Responds to Encl Ltrs, & 1223 Re Generic Implication of part-length CRDM Housing Leak.Review Under TAC Numbers MA1380 & MA1381 Considered Closed ML20203G5541999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 940407. Representative of Facility Must Submit Either Ltr Indicating No Candidates or Listing of Candidates for Exam ML20203G3921999-02-0202 February 1999 Forwards Insp Repts 50-348/98-08 & 50-364/98-08 on 981129- 990109 ML20199L4451999-01-25025 January 1999 Forwards for Review & Comment Revised Draft Info Notice Re Inservice Testing of A-4 Multimatic Deluge Valve for Farley NPP Units 1 & 2.Informs That Comments Submitted on 981120 Were Reviewed & Incorporated Where Appropriate ML20199K7351999-01-21021 January 1999 Responds to 981123 Request by Providing Copy of Latest Draft of Info Notice Being Prepared Which Discusses Failure of Several Preaction Sprinker Sys Deluge Valves.Requests Submittal of Comments by 981120 ML20199K7231999-01-20020 January 1999 Confirms 990119 Telcon Re Informational Meeting Scheduled for 990129 to Be Held in Atlanta,Ga to Discuss Security Related Issues at Plant.Meeting Will Be Closed to Public,Due to Sensitive Nature of Issues ML20199K1381999-01-12012 January 1999 Informs That on 990117,Region II Implemented Staff Reorganization as Part of agency-wide Streamlining Effort, Due to Staffing Reductions in FY99 Budget.Organization Charts Encl ML20199D8541999-01-12012 January 1999 Forwards SE Accepting Relief Request for Inservice Insp Program for Plant,Units 1 & 2 ML20199C9361999-01-0808 January 1999 Forwards Insp Repts 50-348/98-14 & 50-364/98-14 on 981207- 10.No Violations Noted 1999-09-09
[Table view] |
Text
._ _ _ _ . _ _ _ . _ _-..~. . . _ _ . _ . _ _ . _ _ . _ _ .. _ _ _.._ ._
. 'a July 30; 1997
.' Mr. D. N. Morey Vice President - Farley Project Southem Nuclear Operating .
Company, Inc.
l f Post Office Box 1295 p Birmingham, Alabama 35201-1295
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION RELATED TO WCAP-14750, ;
"RCS FLOW VERIFICATION USING ELBOW TAPS AT WESTINGHOUSE i 3-LOOP PWRS," JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS M97325 AND M97326)
Dear Mr. Morey:
By letter dated November 26,1996, you submitted Westinghouse Owners Group Technical Report, WCAP-14750, "RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop .
PWRs," for NRC review and approval for the Farley Nuclear Plant, Units 1 and 2. :
The staff has reviewed your submittal and determined that additionalinformation is required. .
The enclosure identifies the requested additional information needed.
It is requested that the information be provided within 60 days of receipt of this letter. If you ,
require any clarification regarding this request, please call me at (301) 415-2426. '
Sincerely, ORIGINhl SIGNED BY.:
Jacob 1. Zimmerman, Project Manager Project Directorate 11-2 Division of Reactor Projects - 1/Il ;
Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364
Enclosure:
Request for Additionalinformation j
cc w/ encl: See next page Distribution: i
~ Docket File OGC ) i PUBLIC ACRS PD ll-2 Rdg. JJohnson, Ril NRC HLE CENTER COP 1r BBoger SShaeffer, Rll HBerkow LBerry i JZimmerman CNT ,
To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" =
Ccpy with attachment / enclosure "N" = No copy OFFICE - PM g 2 l LA:PDil-2g L D:I3Dilg @ geggg E l NAME dEffyERMAN:cn LSERSY A[p HBER>lpW / JJy@7,, e/
DATE 7/fe/97 ' //;((97 '\ q /3d97 7/b/97 / /97 / - /97 JOGUMEN]AME: G:\FARLEYWl97325.RAI OFFICIAL RECORD COPY l b* 9t b O219 970730 PDR ADOCK 05000348 P PM
, . p rato g & UNITED STATES
, g j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20666-0001
%*****/ July 30,1997 3
Mr. D. N. Morey l Vice riesident - Farley Project Scatnem Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201-1295
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION RELATED TO WCAP-14750, "RCS FLOW VERIFICATION USING ELBOW TAPS AT WESTINGHOUSE 3-LOOP PWRS," JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. M97325 AND M97326)
Dear Mr. Morey:
By letter dated November 26,1996, you submitted Westinghouse Owners Group Technical Report, WCAP-14750, "RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop PWRs," for NRC review and approval for the Farley Nuclear Plant, Units 1 and 2.
The staff has reviewed your submittal and determined that additional information is required. ;
The enclosure identifies the requested additionalinformation needed. '
It is requested that the information be provided within 60 days of receipt of this letter. If you require any clarification regarding this request, please call me at (301) 415-2426.
i Sincerely, I W
acob 1. Zimmerman, Project Manager Project Directorate Il-2 Division of Reactor Projects - 1/ll Office of Nuclear Reactor Regulation Docket Nos. 50-348 .nd 50-364
Enclosure:
Request for Additional Information cc w/ encl: See lext page
7
~
J:seph M. Fcriey Nuclear Plint Units 1 cnd 2 cc:
Mr. R. D. Hill, Jr.
General Manager - ,
Southem Nuclear Operating Company Post Office Box 470 Ashford, Alabama 36312 Mr. Mark Ajiuni, Licensing Manager !
Southem Nuclear Operating Company l Post Office Box 1295 ,
Birmingham, Alabama 35201-1295 i
Mr. M. Stanford Blanton Balch and Bingham Law Firm Post Office Box 306 l
1710 Sixth Avenue North !
Birmingham, Alabama 35201
)
Mr. J. D. Woodard f Executive Vice President l Southem Nuclear Operating Company i Post Office Box 1295 '
Birmingham, Alabama 35201 State Health Officer Alabama Department of Public Health 1 434 Monroe Street l
Montgomery, Alabama 36130-1701 "
Chairman Houston County Commission Post Office Box C406 Dothan, Alabama 36302 l Regional Administrator, Region ll U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 j Atlanta, Georgia 30303 '
Resident inspector U.S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia, Alabama 36319
] ,
i REQUEST FOR ADDITIONAL INFORMATION
< ON WCAP-14750. "RCS FLOW VERIFICATION USING ELBOW >
- TAPS AT WESTINGHOUSE 3-LOOP PWRS" 1 ,
JOSEPH M. FARLEY NUCLEAR PLANT. UNITS 1 AND 2 l I
i j 1. Page 3, last paragraph, states, " Typically, the core exit and hot leg gradients remain 2 l relatively stable, changing only slightly as the radial power distribution changes during
- l. a fuel cycle." i i
(
! Discuss the phenomenon of temperature switching experienced by some plants and its l impact on flow measurement by the proposed elbow tap flow method.
4 l 3
! 2. Page 6, last paragraph, discusses the magnitudes of observed calorimetric flow biases !
i- and discusses the relationship between power and the onset of calorimetric flow I biases. Discuss how the hot leg gradients remain relatively stable as compared to !
e power distribution based on the fact that on page 6 calorimetric flow bias are shown to '
j occur based on power level.
I
! 3. Page 11, first paragraph. Discuss how the repeatability term for the installed elbow tap !
j element at Farley was determined. The topical states that the elbow tap flow !
i measurement procedure relies on the repeatability of the elbow differential pressure (dp) measurement. WCAP-14750 states in Table A-5 that the elbow tap repeatability is t 0.5% dp. Confirm the value assumed in WCAP-14750 and state it specifically in the !
topical report. '
- 4. Page 13, fourth paragraph, the topical stated that calorimetric baseline flows can be i
based on one cycle or the average of multiple cycles with consistent measurements.
The staff has only considered the average of multip!e cycles for previous amendment requests for elbow tap measurement. Provide a discussion on the acceptability of utilizing only a single cycle of data with regard to adequate margin and conservatism. .
- 5. Based on the topical report discussion that the calorimetric flow bias can be defined, discuss the feasibility of incorporating this known bias into the precision flow calorimetric as opposed to utilizing the elbow tap methodology.
G. Assuming typical accuracy of an elbow tap flow meter, discuss any change in measurement accuracy of the elbow flow tap element over an operational range of 85%
to 100% flow.
- 7. Page 14 states that the baseline elbow tap flow coefficient is based on the average dp from all elbow taps in all loops. Discuss how the outputs from each group of dp transmitters from each loop are averaged. Please explain why it is appropriate to average all nine transmitters' instrument output as described in WCAP-14750 although there are three distinct flows and three distinct flow elements.
Enclosure
,-r _-w, - -
- ------a _---_w __. __.t - - - au-- w r_.- m,, e-
-.w_ r, , - 7,_,,_-,q ,
s 3 , ,
i
- . 8. The revised thermal design procedure (RTDP) states that uncertainties are combined
! statistically to obtain an overall departure from nucleate boiling ratio (DNBR) i uncertainty factor such that the probability that DNB will not occur on the most limiting j fuel rod is at least 95% (at a 95% confidence level) for any condition I or ll event.
j Provide a discussion on the relationship of a "best estimate" flow model as the basis .
- for comparison to the elbow tap flows with respect to the previous precision calorimetric calculated to a 95/95 measurement uncertainty and the 95/95 DNBR analysis.
, 9. Discuss the impact of imbalanced loop flows, the averaging of the elbow tap flows, on the elbow tap flow procedure and whether additional uncertainty should be considered.
- Will the assumptions of the topical report remain valid for larger percentages of steam 1
generator tube plugging? What is the maximum tube plugging criteria for Farley? ;
)
- 10. Page 24, third paragraph, the topical report states that Farley Unit 1 calorimetric flow measurements for cycles 2 and 3 were obtained at the end of the previous cycle but
- were not considered appropriate for a baseline calorimetric. Provide a discussion as to
- why these end-of-cycle measurements were not utilized in determining a baseline flow.
i Are '
l end-of-cycle measurements supported by the plant analysis (RTDP)?
i i l 11. Page 27, third paragraph, states that the elbow tap flow measurement repeatability is l estimated at 0.4% of flow. Since the repeatability of the elbow tap flow element is
! crucial, provide a discussion on the determination of the elbow tap flow measurement repeatability. (See question 3.)
1 1 12. Page 32, Table 6-4, " Comparison of Best Estimate and Elbow Tap Flows." How was 4 elbow tap flow baseline determined for comparison to best estimate flow? j
" 13. Figure 6-1, " Comparison of Farley Unit 1 RCS Flows" and Figure 6-2, " Comparison of ;
Farley Unit 2 RCS Flows" show the best estimate flow exceeding the calorimetric and j
{ elbow tap flows during cycles 9,10,11,12,13 and 14 for Unit 1 and cycle 10 for Unit
- 2. Explain why the elbow t;p flow exceeds the best estimate flow for cycles 6 and 7.
- 14. Page 40, Table A1, " Baseline Flow Calorimetric Instrumentation Uncertainties." The
[ table references an uncertainty term "SRA" that is not identified in the Farley setpoint j methodology or the Farley RTDP. Additionally, Table A1 deletes the notes and i assumptions stated in the RTDP for Farley. Provide a description of the new term
- "SRA" and provide a basis for the deletion of the notes and assumptions of this table.
- 15. Page 40, Table A1, instrument spans are revised. What accounts for the change in
! span shown? Instrument errors are also shown to be reduced for feedwater j instrumentation. What accounted for these reductions?
I
i 1
l !
i
- 16. Table A4, " Cold Leg Elbow Tap Flow Uncertainty (Process Computer) Instrument J Uncertainties." Uncertainty terms for I/D, and A/D have been eliminated from the
- ]
' calculation although the information appears to be read from the process computer. !
Explain these eliminations.
1 i
l 17. Page 47. Discuss why the Final Safety Analysis Report (FSAR) update does not i include a reference to the RTDP, Setpoint WCAP, and WCAP-14750 as well as FSAR l l Chapters 15,7, and 4 as currently referenced in the Farley FSAR.
i l
r :
i' 1
4 a
.