ML20151X097

From kanterella
Revision as of 21:48, 10 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Comments by Environ Science Svc Admin on PSAR Per 670725,0818,11 & 17 Requests
ML20151X097
Person / Time
Site: Diablo Canyon, Zion, 05000000
Issue date: 09/01/1967
From: Shaw M
NRC
To: Morris P
NRC
Shared Package
ML20151W779 List:
References
FOIA-88-156 NUDOCS 8808250221
Download: ML20151X097 (2)


Text

,-

k.".,P. .

.. C. . .,.",.7.

. . .. /

t -

UNITED STATES GOi ERNMENT

. Memorandum To  : Peter A. FJorris, Director DATE:

Division of Reactor Licensing SEP1 Go7 FRoM : Hilte i Shaw D'i SIEo'i ' 7 Division of Roacter Development & Technology

SUBJECT:

SAFETY ANALYSIS REPORTS RDTtNStS258 Reference is made to the letters of July 25, 1967 and August 18, 1967, August 11, 1967, and August 17, 1967, frora the Division of Reactor Licensing, to the Environmental Science Services Ad. ministration requesting cor:rnents on the following safety analysis reports respectivelyt Zion Station Units 1 and 2 Co =onwealth Edison Company Preliminary Safety Analysis Report Volumes I and II dated July 12, 1967 and Amendment No. I dated August 15, 1967 Diablo Canyon Site Pacific Gas and Electric Company Preliminary Safety Analysis Report Third Supplement dated July 31, 1967 Easton Nuclear Station Niagara Mohawk Power Corporation Preliminary Safety Analysis Report Volume I, dated August 1, 1967 Review by the Environmental Meteorology Branch, Air Resources Laboratory, ESSA, has now been completed and their coments are attached.

Attach.entat Three Sets of Comments (Orig. 6 1 cy.)

u: A r *

,, to eu ., ..,

. c,

" t.n ',

'. ;i

~

U

- . O U' H o i%

J 0P.30

_ Buy U.S. Savings Bonds Regslarly on the Payoll Savings Plan r808250221 PDR F01A 880721 .' '

... .~~, n""[.-

. x NCMILLA88-156 PDR .( -

o 4

.)

Comment s on Diablo Canyon Site I' . i.

^I Pacific Gas and Electric Company Preliminary Safety Analysis Report . , , , , , , . . , ,

Third Supplement dated July 31, 1967 -

i.i.......... . . .:I Prepared by Environmental Meteorology Branch Institute for Atmospheric Sciences Environmental Science Services Administration August 28, 1967 In regard to question VII.G.5, it is obvious f rom the comparison made by the applicant that there is very little dif ference beyond the first 300 meters between using a virtual point source or a volumetric source technique to account for added building-induced diffusion. It should be pointed out that both techniques are an empirical means to account for a phenomena which is not clearly understood but which i s observed. For comparative purposes it is interesting to note the ratio between con:entrations without accounting for building turbulence and the volumetric approach. The table below shows the Diablo Canyon calculations compared to recent field tests at the National Reactor Testing Station conducted under inversion conditions and moderate wind speeds (u = 6.3 m/ sec).

,Di st ance (meters) Diablo Canvon EBR-II Tests 100 3.5 200 4.2 300 9.6 400 6.2 3.9 6?0 3.2 700 3.2 800 2.8 1000 2.3 Extrapolating the results, one would conclude that an added dilution fa: tor of 2.8 is reasonable at the site boundary of 800 m.

.