RBG-44719, Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With

From kanterella
Revision as of 14:14, 9 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With
ML20195D283
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/31/1998
From: King R, Williamson D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RBF1-98-0277, RBF1-98-277, RBG-44719, NUDOCS 9811170333
Download: ML20195D283 (4)


Text

- ,~ . _ __ - . .

F EntFgy Operati:ns,Inc.

% River Bend Station 5485 U. S. Highway 61 O Eh PO. Box 220 St. Francisville. LA 70775 Tel 504 336 6225 Fax 504 635 5068 c '

Rick J. King Director Nuclear Safety & Regulatory Affairs ,

November 10,1998 U. S. Nuclear Regulatory Commission Document Control Desk, OPl-37 Washington, D. C. 20555

Subject:

River Bend Station - Unit 1 Docket No. 50-458 Monthly Operating Report File No.: G9.5, G4.25 RBG-44719 RBF1-98-0277 Ladies and Gentlemen: l In accordance with River Bend Station Technical Specification 5.6.4, enclosed is the Monthly Operating Report for October 1998.

Sincerely, i J

DNL for RJK/dhw enclosure fE:;Fl' ,

l l

P' 9811170333 991031 i PDR ADOCK 05000450 i

R PDR y 1

. I S

( t. -

l- Monthly Operating Report November 10,1998 RBG-44719

RBF1-98-0277
. Page 2 of 2 cc
U. S. Nuclear Regulatory Commission l Region IV ,

( 611 Ryan Plaza Drive, Suite 400 l Arlington,TX 76011 NRC Senior Resident inspector P. O. Box 1050 St. Francisville, LA 70775 i

INPO Records Center '

700 Galleria Parkway Atlanta, GA 30339-3064 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Ave.

Austin, TX 78711-3326 Dottie Sherman American NuclearInsurers  ;

29 South Main Street

- West Hanford, CN 06107 l l

l 1

! l TM9

s 9 t

DOCKET NO. 50/458 i

, RIVFit BEND STATION DATE November 10,1998 COMPLETED BY Danny H. Williamson TITLE Sr. Licensing Specialist TELEPHONE 225-381-4279 PAGE 1 OF 2 l

OPEM FING STATUS l

1. REPORTING PERIOD: October 1998
2. MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 936 I I
3. DESIGN ELECTRICAL RATING (MWe-Net): 936 MONTH YEAR TO CUMULATIVE DATE l
4. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 6966.0 87246.4 1
5. HOURS GENERATOR ON LINE 745.0 6940.6 83906.2
6. UNIT RESERVE SHUTDOWN HOURS 0 0 0 1
7. NET ELECTRICAL ENERGY GENERATED (MWH) 693,416 6,461,844 73,351,660 l

i l  !

l l-i

')

i

s 71

, . PAGE 2 OF 2 l

UNIT SIlUTDOWNS l

SHUTDOWN CAUSE/

NUMBER DATE TYPE DURATION METHOD REASON CORRECTIVE ACTIONS (none)

LEGEND:

TYPE: F - Forced SilUTDOWN AIETIIOD: I - Alanual REASON: A - Equipment failure (explain)

S - scheduled 2 - blanual tdp/ scram B - Slaintenance er Test 3 - Automatic trip / scram C - Refueling 4 - Continuation D - Regulatory restriction 5 - Other (ex plain) E - Operator trahiing / License enani F- Administratise G - Operathmal error (explain)

II - Other (explain)

NOTES:

1. No challenges to reactor safety-relief valves occurred in October.

Ib ud Danny H. Williamson l

I