RBG-42165, Monthly Operating Rept for Oct 1995 for River Bend Station

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1995 for River Bend Station
ML20094L183
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/31/1995
From: Bolke T, James Fisicaro
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RBF1-95-0266, RBF1-95-266, RBG-42165, NUDOCS 9511200084
Download: ML20094L183 (6)


Text

.

Entirgy Operations,Inc.

8 River Bend Statico I

5485 U.S H'ghway 61

. -==~ ENTERGY

?re%2A m ons Tel 504 336 6225 Fax 504 635 5068 James J. Fisicaro Director NJClehf $8 tT/

f November 15,1995 U.S. Nuclear Regulatory Commission Document Contml Desk Mail Stop PI-37 Washington, DC 20555

Subject:

River Bend Station - Unit 1 Docket No. 50-458 Monthly Operating Report File No.

G9.5, G4.25 RBG-42165 RBF1-95-0266 Gentlemen:

In accordance with River Bend Station (RBS) Technical Specification 5.6.4, enclosed is the October,1995 Monthly Operating Report for RBS.

Sincerely, A

JJF/RMM/kym enclosure o e r

.i 'y 9511200084 951115 PDR ADOCK 05000458 F,

R PDR I

i e

Monthly Operating Report No*vember 15,1995 RBG-42165

. RBF1-95-0266 Page 2 of 2 l

cc:

U.S. Nuclear Regulatory Commission, Region IV NRC Sr. Resident Inspector INPO Records Center

)

Mr. C.R. Oberg l

Public Utility Commission of Texas i

Dottie Sherman i

American NuclearInsurers Cajun Electric Power Co-Op, Inc.

i

]

l

\\

l DOCKET NO. 50/458 RIVER BEN 9 STATION UNIT 1 REPORT NO.

R-95-10 DATE November 6.1995 COMPLETED BY T. J. Bolke TITLE Eneineer III TELEPHONE 504-346-8651 ext. 2940 MONTH October 1995 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL (MWe-Net)

(MWe-Net) 1.

922.0 17.

940.9 2.

922.5 18.

938.1 3.

925.1 19.

935.0 4.

925.9 20.

94.7 5.

927.7 21.

945.9 6.

931.8 22.

942.9 7.

920.3 23.

935.9 8.

933.3 24.

938.5 9.

932.6 25.

939.1 10.

929.6 26.

930.8 11.

940.0 27.

921.0 12.

934.1 28.

930.3 13.

924.9 29.

931.2 14.

849."1 30.

927.8 15.

941.3 31.

921.9 j

16, 942.6

4 DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.

R-95-10 DATE November 6.1995 i

COMPLETED BY T. J. Bolke TITLE Eneineer III TELEPHONE 504-346-8651 est. 2940 I

- PAGE 1

OF 2 OPERATING STATUS

1. REPORTING PERIOD: October.1995 GROSS HOURS IN REPORTING PERIOD:

745

2. CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 2894 MAX. DEPEND CAPACITY (MWe-Net): Mi DESIGN ELECTRICAL RATING (MWe-Net): 96
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): N/A
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS YR TO CUMU-MONTH DATE LATIVE
5. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 72960 63792.2
6. REACTOR RESERVE SHUTDOWN HOURS 0

0 0

7. HOURS GENERATOR ON LINE 745.0 7296.0 63792.2
8. UNIT RESERVE SHUTDOWN HOURS 0

0 0

9. GROSS THERMAL ENERGY GENERATED (MWH) 2.133.149 21.001.025 164.074.038
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 739.895 7.205.138 55.587.193
11. NET ELECTRICAL ENERGY GENERATED (MWH) 692.687 6.749.300 52.025.032

.~.-..-.- _-

i 1

J DOCKET NO. 50/458 i

RIVER BEND STATION UNIT 1 REPORT NO.

R-95-10 DAl'E November 6.1995 i

COMPLETED BY T. J. Bolke

]

TITLE Er.i ;;r III

)

TELEPHONE 504-346-8651 ext. 2940 PAGE 2

OF 2

OPERATING STATUS '

l THIS YR TO CUMU-MONTH DATE LATIVE l

I l

12. REACTOR SERVICE FACTOR 100.0 100.0 73.3 13 REACTOR AVAILABILITY FACTOR 100.0 100.0 73.3 l

.14. UNIT SERVICE FACTOR 100.0 100.0 71.2 l

15. UNIT AVAILABILITY FACTOR 100.0 100.0 71.2
16. UNIT CAPACITY FACTOR (USING MDC) 99.3 98.8 66.4
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 99.3 98.8 66.4 l
18. UNIT FORCED OUTAGE RATE 0.0 0,0 12.6
19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):

j Refueling,1/6/%,60 days

20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

N/A i

4

9.

UNIT SHUTDOWNS AND POWER REDUCTIONS i

TIME TIME I

START RECOVER OF FROM DURATION TYPE REASON METHOD CORRECTIVE ACTION /

NO.

DATE OCCURRENCE OCCURRENCE (HOURS)

NOTE (1) NOTE (2) NOTE (3)

COMMENTS F

None i

i i

l

SUMMARY

i NOTE (1)

TYPE OF OCCURRENCE:

ENTER CODE DOCKET NO. 50/458 F:

FORCED RIVER BEND STATION UNIT I S:

SCHEDULED NOTE (2)

REASON FOR OCCURRENCE: ENTER CODE REPORT NO.

R-95-10

[

A:

EQUIPMENT FAILURE (EXPLAIN IN CORRECITVE ACTIONS / COMMENTS)

B:

MAINTENANCE ORTEST REPORT MONE October.1995 l

C:

REFUELING f

D:

REGULATORY RESTRICTION E:

OPERATOR TRAINING AND LICENSE EXAMINATION DATE Noveanber 6.1995 F:

ADMINISTRATIVE G:

OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

T. J. Bolke H:

OTHER (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

.OMPLETED Y f

NOTE (3)

METHOD OF SHUTTING DOWN REACTOR OR REDUCING POWER-ENTER ONE d

WIGNATURE i

1.

MANUAL 2.

MANUAL SCRAM Engineer III 3.

AUTOMATIC SCRAM TITLE 4.

OmER (EXPLAIN IN CORRECTIVE ACTION / COMMENTS)

)

l TELEPHONE: 504-346-8651 ext. 2940

[

I

[

-- -