RBG-42291, Monthly Operating Rept for Nov 1995 for River Bend Station
| ML20095H301 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 11/30/1995 |
| From: | Bolke T, James Fisicaro ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| RBF1-95-0310, RBF1-95-310, RBG-42291, NUDOCS 9512220275 | |
| Download: ML20095H301 (6) | |
Text
,
EntIrgy Optrations, Inc.
River Bend Station e
5485 U.S H:ghway 61
=S~ENTERGY l e,"e% % u7077s Tel 504 336 6225 i
Fax 504 635 5068 James J. Fisicaro Director Nuclear Safety December 15,1995 U. S. Nuclear Regulatory Commission Document Control Desk Mail Stop Pl-37 Washington, DC 20555
Subject:
River Bend Station - Unit 1 Docket No. 50-458 Monthly Operating Repon File No.
G9.5, G4.25 RBG-42291 RBF1-95-0310 Gentlemen:
In accordance with River Bend Station (RBS) Technical Specification 5.6.4, enclosed is the November,1995 Monthly Operating Repon for RBS.
Sincerely, JJF/RMM/mdr enclosure P2r072 ffk o
~ 9512220275 951130 DR ADOCK 050004 8
4 Monthly Operating Report December 15,1995 RBG-42291 RBF1-95-0310 Page 2 of 2 cc:
U.S. Nuclear Regulatory Commission, Region IV NRC Sr. Resident Inspector INPO Records Center Mr. C.R. Oberg Public Utility Commission of Texas Dottie Sherman American Nuclear Insurers Cajun Electric Power Co-Op, Inc.
I
I DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.
R-95-11 DATE December 11.1995 COMPLETED BY T. J. Bolke 4
TITLE Engineer IU TELEPIIONE 504-346-8651 ext. 2940 MONT11 November 1995 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL (MWe-Net)
(MWe-Net) 1.
915.1 17.
849.3 2.
913.3 18.
793.9 3.
919.5 19.
815.8 4.
921.3 20.
806J 5.
917.8 21.
859.0 6.
906.5 22.
855.1 7.
899.6 23.
855.1 8.
907.7 24.
874.1 9.
905.5 25.
850.3 10.
896.0 26.
819.0 11.
898.7 27, 858.8 12.
901.8 28.
856.1 13.
895.7 29.
856.5 14.
894.0 30.
856.6 15.
891.3 l
16, 888.9
{
DOCKET NO. 50/458 i
RIVER BEND STATION UNIT 1 REPORT NO.
R-95-11 DATE December 11,1995 COMPLETED BY T. J. Bolke TITLE Engineer III TELEPiiONE 504-346-8651 ext. 2940 PAGE 1
OF 2 OPERATING STATUS j
- 1. REPORTING PERIOD: November 1995 GROSS IIOURS IN REPORTING PERIOD:
720
- 2. CURRENTLY AUTilORIZED POWER LEVEL (Mwt): 2894 i
MAX. DEPEND CAPACITY (MWe-Net): 936 3
DESIGN ELECTRICAL RATING (MWe-Net): 934
- 3. POWER LEVEL TO WIIIC11 RESTRICTED (IF ANY)(MWe-Net): N/A
- 4. REASONS FOR RESTRICTION (IF ANY): N/A TIIIS YR TO CUM U-MONTII DATE LATIVE
- 5. NUMBER OF IIOURS REACTOR WAS CRITICAL 720.0 8016.0 64.512.2
- 6. REACTOR RESERVE SliUTDOWN 110URS 0
0 0
7.110URS GENERATOR ON LINE 720.0 8016.0 61.455.1
- 8. UNIT RESERVE SilUTDOWN llOURS 0
0 0
- 9. GROSS TilERMAL ENERGY GENERATED (MWil) 1.935.948 22.936.973 166.009.986
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWII) 674,885 7.880,023 56.262,078
- 11. NET ELECTRICAL ENERGY GENERATED (MWii) 630.691 7.379.991 52.655.723 DOCKET NO. 50/458 RIVER BEND STATION UNIT 1
REPORT NO.
R-95-11 DATE December 11,1995 COMPLETED BY T. J. Bolke TITLE Engineer 111 TELEPIIONE 504-346-8651 ext. 2940 i
PAGE 2
OF 2
OPERATING STATUS i
Tills YR TO CUM U-MONTil DATE LATIVE
- 12. REACTOR SERVICE FACTOR 100.0 100.0 73.6 13 REACTOR AVAILABILITY FACTOR 100.0 100.0 73.6
- 14. UNIT SERVICE FACTOR 100.0 100.0 71.5
- 15. UNIT AVAILABILITY FACTOR 100.0 100.0 71.5
- 16. UNIT CAPACITY FACTOR (USING MDC) 93.6 98.4 66.6
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 93.6 98.4 66.6
- 18. UNIT FORCED OUTAGE RATE 0.0 0.0 12.5
- 19. SIIUTDOWNS SCilEDULED OVER NEXT SIX MONTIIS (TYPE, DATE, AND DURATION OF EACil):
Refueling, 1/6/96,60 days
- 20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
N/A
UNIT SIIUTDOWNS AND POWER REDUCTIONS
~
TIME TlhE START RECOVER OF FROM DURATION TYPE REASON METHOD CORRECTIVE ACTION /
NO.
DATE OCCURRENCE OCCURRENCE (HOURS)
NOTE (1) NOTE (2) NOTE (3)
COMAfENTS r
t None t
SUMMARY
- No SRV challenges occurred this month.
NOTE (1)
TYPE OF OCCURRENCE:
ENTER CODE DOCKET NO. 50/458 _
F:
FORCED RIVER BEND STATION UNIT I S:-
SCIEDULED r
NOTE (2)
REASON FOR OCCURRENCE: ENTER CODE REPORT NO.
R-95-11 A:
EQUIPMENT FAILURE (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)
B:
MAINTENANCE OR TEST REPORT MONTH November.1995 C:
REFUELING D:
REGULATORY RESTRICTION E:
OPERATOR TRAINING AND LICENSE EXAMINATION DATE December 11,1995 F:
ADMINISTRATIVE G:
OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)
T. J. Bolke H:
OTIER (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)
C. fPLETED B I
11, NOTE (3)
NETHOD OF SHUTTING DOWN REACTOR OR REDUCING POWER:
ENTER ONE S)dNATURE 1.
MANUAL l
2.
MANUAL SCRAM Eneineer Ill 6
3.
AUTOMATIC SCRAM TITLE
[
4.
OTHER (EXPLAIN IN CORRECTIVE ACTION /COMhENTS)
[
TELEPHONE: 504-346-8651 ext. 2940 l
[
i
-