RBG-42657, Monthly Operating Rept for Feb 1996 for River Bend Station, Unit 1

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1996 for River Bend Station, Unit 1
ML20101D173
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/29/1996
From: Bolke T, James Fisicaro
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RBF1-96-0076, RBF1-96-76, RBG-42657, NUDOCS 9603200085
Download: ML20101D173 (6)


Text

._ _ __ . _ _ .. _ . _ . . _-...__.._m.____.~ m-... . - . .. . . . -

A

=~~~ ENTERGY Enttrgy Operetn.ns, Inc.

River Bend Stahori 5485 U.S Highway 61

a 2 2 6 70775
  • Tel 504 336 6225 Fax 504 635 5068 James J. Fisicato Director Nuclear Safety 3

. March 14,1996 U. S. Nuclear Regulatory Commission Document Control Desk Mail Stop PI-37 Washington, DC 20555

Subject:

River Bend Station - Unit 1 Docket No. 50-458 Monthly Operating Report File No. G9.5, G4.25 RBG-42657 RBF1-96-0076 Gentlemen:

In accordance with River Bend Station (RBS) Technical Specification 5.6.4, enclosed is the February,1996, Monthly Operating Report for RBS.

Sincerely, _

, d dW JJF/RMM/kym enclosure 9603200385 960229 200017 ffh PDR R

ADOCK 05000458 PDR

/ )h i

l l

1 Monthly Operating Report I

March 14,1996 RBG-42657 RBF1-96-0076 l

Page 2 of 2 cc: U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 I Arlington, TX 76011 I NRC Senior Resident Inspector P.O. Box 1051 1 St. Francisville, LA 70775 l

INPO Records Center 700 Galleria Parkway

)

Atlanta, GA 30339-3064 '

Chester R. Oberg PUCT- l j

7800 Shoal Creek Blvd., Suite 400N Austin, TX 78757

.]

Dottie Sherman American Nuclear Insurers 29 South Main Street West Hattford, CN 06107 Cajun Electric Power Co-op, Inc.

l l

l

DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 j -

] REPORT NO. R-96-02

DATE March 13.1996 COMPLETED BY T. J. Bolke TITLE Eneineer III TELEPHOME 504-346-865i ext. 2940 MONTII Februnny 1996
DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL (MWe-Net) (MWe-Net)

I

1. 0.0 17. 825.8
2. 0.0 , 18. 943.2 1 3. 0.0 19. 938.2 _,
4. 0.0 20. 938.8 i

4

5. 0.0 21. 894.1
6. 0.0 22, 846.3 1
7. 0.0 23. 871.2 4 8. 0.0 24, 935.3 i.
9. 0.0 25. 937.2 i

10, 0.0 _ 26. 935.5 1

j i 1. 0.0 __ 27. 938.1

12. 0.0 28, 957.3
13. 105.2 29. 964.4
14. 466.2
15. 810.3
16. 735.4

. . 2 DOCKET NO. 50/458

' ~

RIVER BEND STATION UNIT 1 REPORT NO. R-96-02 DATE March 13.1996 4 COMPLETED BY T. J. Bolke l TITLE Eneineer III l TELEPIlONE 504-346-8651 ext. 2940 PAGE I OF 2 OPERATING STATUS

1. REPORTING PERIOD: February.1996 GROSS IlOURS IN REPORTING PERIOD: 696
2. CURRENTLY AUT110RI7.ED POWER LEVEL (Mwt): 2894  !

l MAX. DEPEND CAPACITY (MWe-Net): 9_36 i DE5dm ELECTRICAL RATING (MWe-Net): 93f6

3. POWER LEVEL TO WlilCil RESTRICTED (IF ANY)(MWe-Nett: N/A j
4. REASONS FOR RESTRICTION (IF ANY): N/A j i

4 i

T111S YR TO CUMU-MONTli DATE LATIVE

5. NUMBER OF llOURS REACOR WAS CRITICAL 439.4 529.6 65750.3 l
6. REACTOR RESERVE SIIUTDOWN llOURS , _ , _

0 0 0 1

7. IIOURS GENERATOR ON LINE _,

402.8 493.1 62636.4

~

8. UNIT RESERVE SIIUTDOWN llOURS , _ _ ,

0 0 0

9. GROSS TilERMAL ENERGY GENERATED (MWil) __ 1.050.304 1.221.798 169.123.067
10. GROSS ELECTRICAL ENERGY GENERATED (MWil) _ _ 360.525 419.076 57.272.845 ,

l

11. NET ELECTRICAL ENERGY GENERATED (MWilt 337,0LE 390.850 53,597.689 )

i 0

r

)

r.

.i DOCKET NO. 50/458

RIVER BEND STATION UNIT 1 l REPORT NO. R-96-02 DATE March 13.1996
COMPLETED BY T. J. Bolke TITLE Eneineer Ill i TELEPHONE 504-346-8651 ext. 2940 PAGE 2 OF 2 l

OPERATING STATUS i

e TIIIS YR TO CUMU-

]

MONTil DATE LATIVE

12. REACTOR SERVICE FACTOR 63.1 36.8 73.1 13 REACTOR AVAILABILITY FACTOR 63.1 36.8 73.1
14. UNIT SERVICE FACTOR 57.9 34.2 71.0
15. UNIT AVAILABILITY FACTOR 57.9 34.2 71.0
16. UNIT CAPACITY FACTOR (USING MDC) 51.7 29.0 66.1
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 51.7 29.0 66.1
18. UNIT FORCED OUTAGE RATE o.0 0.0 12.3
19. SilUTDOWNS SCllEDULED OVER NEXT SIX MONTilS (TYPE, DATE, AND DURATION OF EACf D:

None

20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

N/A

~. .. .-.. - - - - - _ - - - - _ - - - _ - - - - - - - _ -_

, o O =

UNIT SilUTDOWNS AND POWER REDUCTIONS T TIME TIME START RECOVER OF FROM DURATION TYPE REASON MET 110D CORRECTIVE ACTION / ,

NO. D/.TE OCCURRENCa' OCCURRENCE (llOURS) NOTE (1) NOTE (2) NOTE (3) COMMENTS 9641 1/4/% 1817 2/13/96 (0351) 291.9 S C 2 Completed scheduled refueling outage 96-02 2/13/% 1220 2/13/96 (1342) 1.4 S B 1 Unit was taken off-line to perform Tmbine overspeed testing

SUMMARY

SRV functional testing performed coming out of outage. No other SRV challenges occured during February.

NOTE (I) TYPE OF OCCURRENCE: ENTER CODE DOCKETNO. 50/458 F: FORCED RIVER BEND STATION UNIT I S: SCllEDULED NOTE (2) REASON FOR OCCURRENCE: ENTER CODE REPORT NO. R-96=02 A: EQUIPMENT FAILURE (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

B: MAINTENANCE OR TEST REPORT MONTH February 1996 C. REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING AND LICENSE EXAMINATION ~DATE March 14.1996 F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS) T. J. Bolke 11: OTIIER (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS) COMPLETED BY NOTE (3) METHOI ' OF SIRTTTING DOWN REACTOR OR REDUCING POWER: ENTER ONE ^^- TT I S16 NATURE

1. MANUAL
2. MANUAL SCRAM Engineer 111
3. AUTOMATIC SCRAM TITLE
4. OTHER (EXPLAIN IN CORRECTIVE ACTION / COMMENTS)

TELEPHONE: 504-346-8651 ext. 2940

-_ - _ _ - . _ _ - ._. __- - - - - _ _ _ _ _ - - - _ _ _ - - _ _ _ _ _ _ _ _ - _ _ _ _ - - - _ _ _ _ - _ _-_- . _ - _ - _ - _ _ - __-_____ =__ -