RBG-43557, Monthly Operating Rept for Nov 1996 for River Bend Station

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1996 for River Bend Station
ML20132C133
Person / Time
Site: River Bend 
Issue date: 11/30/1996
From: King R, Williamson D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RBF1-96-0466, RBF1-96-466, RBG-43557, NUDOCS 9612180148
Download: ML20132C133 (6)


Text

Ent rgy operition2,Inc.

Rwer Bend Station l

5485 U. S. H'Ohway 61 e

W, PO. Box 220 y

St. Francisvdle. LA 70775 Tel 504 336 6225 Fax 504 635 5068 Rick J. King Director Nuclear Safety & Regulatory Af' airs December 12,1996 U. S. Nuclear Regulatory Commission Document Control Desk Mail Stop Pl-37 Washington, DC 20555

Subject:

River Bend Station - Unit 1 Docket No. 50-458 Monthly Operating Report File No.

G9.5, G4.25 RBG-43557 RBF1-96-0466 Gentlemen:

In accordance with River Bend Station (RBS) Technical Specification 5.6.4, enclosed is the November,1996, Monthly Operating Report for RBS.

Sincerely,

~

s RJK/RMM/kym q,

enclosure r r{/

g 1

/

/

1 1

I 9612180148 961130 PDR ADOCK 05000458-l R

PDR

17007,

-~

Monthly Operating Report December 12,1996 RBG-43557 RBF1-96-0466 Page 2 of 2 1

i cc:

U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector P.O. Box 1050 St. Francisville, LA 70775 l

INPO Records Center 700 Galleria Parkway Atlanta, GA 30339 Mr. Glen Dishong j

PUCT 7800 Shoal Creek Blvd., Suite 400N Austin, TX 78757 Dottie Sherman American NuclearInsurers 29 South Main Street West Hartford, CN 06107

DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.

R-96-il DATE December 10,1996 COMPLETED BY Danny Williamson TITLE Technical Specialist IV TELEPIIONE 504-381-4279 MONTII November 1996 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL (MWe-Net)

(MWe-Net) 1.

939.6 17.

558.0 2.

945.4 18.

659.9 l

3.

958.9 19.

950.9 4.

956.9 20.

947.0 5.

352.8 21.

945.7 6.

949.2 22.

955.8 7.

948.6 23.

954.5 8.

957.1 24.

950.4 9.

940.2 25.

958.6 10.

957.7 26.

959.2 11.

956.9 27.

959.8 12.

956.1 28.

958.3 13.

956.6 29.

952.2 14.

955.8 30.

951.0 15.

946.8 31.

n/a 16.

622.6 i

I DOCKET NO. 50/458 i

RIVER HEND STATION UNIT 1 REPORT NO.

R-96-11 DATE December 10,1996 COMPLETED BY Danny Williamson TITLE Technical Specialist IV TELEPHONE 504-381-4279 i

PAGE 1

OF 2 OPERATING STATUS

1. REPORTING PERIOD: November,1996 GROSS IlOURS IN REPORTING PERIOD:

720

2. CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 2894 MAX. DEPEND CAPACITY (MWe-Net): 936 DESIGN ELECTRICAL RATING (MWe-Net): 936 3, POWER LEVEL TO WHICII RESTRICTED (IF ANY)(MWe-Net): N/A
4. REASONS FOR RESTRICTION (IF ANY): N/A TIIIS YR TO CUMU-MONTH DATE LATIVE
5. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6751.7 71972.4
6. REACTOR RESERVE SHUTDOWN HOURS 0

0 0

7. HOURS GENERATOR ON LINE 720.0 6649.4 68792.7
8. UNIT RESERVE SHUTDOWN HOURS 0

0 0

9. GROSS THERMAL ENERGY GENERATED (MWH) 2,012,666 18,827,508 186,543,449 j
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 706,300 6,566,670 63,420,440
11. NET ELECTRICAL ENERGY GENERATED (MWH) 661.495 6,149,245 59.356,084

=- _..

DOCKET NO. 50/458 i

RIVER BEND STATION UNIT 1 REPORT NO.

R-96-11 3

DATE December 10,1996 COMPLETED BY Danny Williamson TITLE Technical Specialist IV TELEPilONE 504-381-4279 PAGE 2

OF 2

1 OPERATING STATUS 4

Tills YR TO CUMU-MONTH DATE LATIVE

12. REACTOR SERVICE FACTOR 100.0 84.0 74.7 1

13 REACTOR AVAILABILITY FACTOR 100.0 84.0 74.7 l

14. UNIT SERVICE FACTOR 100.0 82.7 72.6
15. UNIT AVAILABILITY FACTOR 100.0 82.7 72.6
16. UNIT CAPACITY FACTOR (USING MDC) 98.2 81.7 68.0
17. UNIT CAPACITY FACTOR (USING DESIGN Mwe) 98.2 81.7 68.0
18. UNIT FORCED OUTAGE RATE 0.0 6.3 11.8
19. SIIUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACII):

None

20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

N/A

)

UNIT SHUTDOWNS AND POWER REDUCTIONS TIME TIME START RECOVER OF FROM DURATION TYPE REASON METiiOD CORRECTIVE ACTION /

NO.

DATE OCCURRENCE OCCURRENCE (llOURS)

NOTE (1) NOTE (2) NOTE (3)

COMMENTS

% 04 11/15/96 2200 0300 (11/17/96) 29 S

B 1

Control rod pattern exchange and scram time testing

% 05 11/16/96 1451 1600 (11/18/96) 49.2 F

A 1

Generator bus duct cooling fan failed

SUMMARY

No SRV challenges occured during November.

NOTE (1)

TYPE OF OCCURRENCE:

ENTER CODE DOCKET NO. 50/458 F:

FORCED RIVER BEND STATION UNIT 1 S:

SCllEDULED NOTE (2)

REASON FOR OCCURRENCE: ENTER CODE REPORT NO.

R-96-11 A:

EQUIPMENT FAILURE (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

B:

MAINTENANCE OR TEST REPORT MONTli November 1996 C:

REFUELING D:

REGULATORY RESTRICTION E:

OPERATOR TRAINING AND LICENSE EXAMINATION DATE December 10,1996 F:

ADMINISTRATIVE G:

OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

Danny Williamson 11:

OT11ER (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

COMPI ETED BY NOTE (3)

METIIOD OF SilUTTING DOWN REACTOR OR REDUCING POWER:

ENTER ONE M (M SIGNATURE I.

MANUAL 2.

MANUAL SCRAM Technical Specialist IV 3.

AUTOMATIC SCRAM TITLE 4.

OTIIER (EXPLAIN IN CORRECTIVE ACTION / COMMENTS)

TELEPIIONE: 504-381-4279