A Ent:rgy Operati:ns. Inc.

River Bend Station 5485 U S. Nghway 61

-;*.ENTERGY*

l1 4 S e.u ron5 Tel 504 336 6225 Fax 504 635 5068 James J. Fisicaro Duector Nuclear Safety October 12,1995 U.S. Nuclear Regulatory Commission Document Control Desk Mail Stop Pl-37 Washington,'DC 20555

Subject:

River Bend Station - Unit 1 Docket No. 50-458 Monthly Operating Report File No. G9.5, G4.25 RBG-42059

' RBF1-95-0247 Gentlemen:

In accordance with River Bend Station (RBS) Technical Specification 5.6.4, enclosed is the September,1995 Monthly Operating Report for RBS.

Sincerely, Yn -

JF/Rhb/kym enclosure

. "/C O .0 []

^

I 9510170018 950930 PDR R

ADOCK 05000458 #L's l

. _ . . . , _ . _ ppg _, ,_,. _

l 1

Attaciunent 5

  • . Page1of1 Monthly Operating Report October 12,1995 RBG-42059 RBF1-95-0247 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission, Region IV NRC Sr. Resident Inspector INPO Records Center I Mr. C.R. Oberg Public Utility Commission of Texas 4

Dottie Sherman American Nuclear Insurers Cajun Electric Power Co-Op, Inc.

l 1

)

l I

l l

DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO. R-95-09 DATE October 10.1995 COMPLETED BY T. J. Bolke TITLE Ensrineer III TELEPIIONE 504-346-8651 ext. 2940 MONTil September 1995 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL (MWe-Net) (MWe-Net)

1. 920.1 17. 918.5
2. 919.1 18. 923.7 >
3. 911.3 19. 924.8
4. 922.1 20. 920.5
5. 924.3 21. 921.3
6. 925.5 22. 930.3
7. 927.I 23, 932.9
8. 925.5 24, 929.4
9. 923.0 25. 926.6
10. 926.6 26. 925.6
11. 927.2 27. 927.0
12. 924.9 28. 927.7
13. 922.3 29. 925.4
14. 919.5 30. 922.4
15. 886.1 16, 822.5 d

DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO. R-95-09 DATE October 10.1995 COMPLETED BY T. J. Bolke TITLE Engineer III TELEPIIONE 504-346-8651 ext. 2940 PAGE 1 OF 2 OPERATING STATUS ,

1. REPORTING PERIOD: September,1995 GROSS IIOURS IN REPORTING PERIOD: 720
2. CURRENTLY AUTIIORIZED POWER LEVEL (Mwt): 2894 MAX. DEPEND CAPACITY (MWe-Net): 236 DESIGN ELECTRICAL RATING (MWe-Net): 936
3. POWER LEVEL TO WillCil RESTRICTED (IF ANY)(MWe-Net): N/A
4. REASONS FOR RESTRICTION (IF ANY): N/A TIIIS YR TO CUMU.

MONTII DATE LATIVE

5. NUMBER OF IIOURS REACTOR WAS CRITICAL 720.0 6551.0 63047.2
6. REACTOR RESERVE SIIUTDOWN IIOURS 0 0 0
7. IIOURS GENERATOR ON LINE 720.0 6551.0 59990.1
8. UNIT RESERVE SIIUTDOWN IIOURS o 0 0
9. GROSS TIIERMAL ENERGY GENERATED (MWil) 2,073,612 18,867,876 161,940,889
10. GROSS ELECTRICAL ENERGY GENERATED (MWII) 707,661 6,465.243 54,847,298
11. NET ELECTRICAL ENERGY GENERATED (MWII) 661,999 6,056,613 51,332,345

6 DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO. R-95-09 DATE October 10.1995 COMPLETED BY T. .I. Bolke TITLE Engineer III TELEPIIONE 504-346-8651 ext. 2940 PAGE 2 OF 2 OPFRATING STATUS l

l 2

Tills YR TO CUMU-MONTil DATE LATIVE

13. REACTOR SERVICE FACTOR 100.0 100.0 73.1
13 REACTOR AVAILABILITY FACTOR 100.0 100.0 73.1  !
14. UNIT SERVICE FACTOR 100.0 100.0 70.9
15. UNIT AVAILABILITY FACTOR 100.0 100.0 70.9 l 16. UNIT CAPACITY FACTOR (USING MDC) 98.2 98.8 66.1
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 98.2 98.8 66.1
18. UNIT FORCED OUTAGE RATE 0.0 0.0 12.7
19. SilUTDOWNS SCllEDULED OVER NEXT SIX MONTilS (TYPE, DATE, AND DURATION OF EACII): l l

Refueling, 1/6/96,60 days i 1

20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

N/A 4

1

UNIT SHUTDOWNS AND POWER REDUCTIONS .

TIhE TIhE ,

START RECOVER OF FROM DURATION TYPE REASON METHOD CORRECTIVE ACTION /

NO. DATE OCCURRENCE OCCURRENCE (HOURS) NOTE (1) NOTE (2) NOTE (3) COMhENTS None

SUMMARY

NOTE (1) TYPE OF OCCURRENCE: ENTER CODE DOCKETNO. 50/458 F: FORCED RIVER BEND STATION UNIT I S: SCHEDULED NOTE (2) REASON FOR OCCURRENCE: ENTER CODE REPORT NO. R-95-09 A: EQUIPAENT FAILURE (EXPLAIN IN CORRECTIVE ACTIONS /COMhENTS)

B: MAINTENANCE ORTEST REPORT MONTH September.1995 C: REFUELING D: REGULATORY RESTRICTION E: OPERATORTRAINING AND LICENSE EXAMINATION DATE October 10.1995 F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONS /COMhENTS) T. J. Bolke H: OTIER (EXPLAIN IN CORRECTIVE ACTIONS /COMhENTS) COMPLETED Y NOTE (3) METHOD OF SHUTTING DOWN REACTOR OR REDUCING POWER. ENTERONE h/

4IGNATURE

1. MANUAL
2. MANUAL SCRAM Engineer III
3. AUTOMATIC SCRAM TITLE
4. OTHER (EXPLAIN IN CORRECTIVE ACTION /COMhENTS)

TELEPHONE: 504-346-8651 ext. 2940 L._...__.+_ _ _ _ _ ____ _ _.______m _. _ _ . _ _ _ _ . . _ __m_ _ . ____ - ___ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ . _ _ .