Text
... -
Ent:rgy Operati:ns. Inc.
A River Bend Station 5485 U S. Nghway 61
-;*.ENTERGY l1 4 S e.u ron5 Tel 504 336 6225 Fax 504 635 5068 James J. Fisicaro Duector Nuclear Safety October 12,1995 U.S. Nuclear Regulatory Commission Document Control Desk Mail Stop Pl-37 Washington,'DC 20555
Subject:
River Bend Station - Unit 1 Docket No. 50-458 Monthly Operating Report File No.
G9.5, G4.25 RBG-42059
' RBF1-95-0247 Gentlemen:
In accordance with River Bend Station (RBS) Technical Specification 5.6.4, enclosed is the September,1995 Monthly Operating Report for RBS.
Sincerely, Yn JF/Rhb/kym enclosure
. "/C O.0 []
I 9510170018 950930
- L's
^
PDR ADOCK 05000458 l
R
_ ppg _,,_,.
l Attaciunent 5 Page1of1 Monthly Operating Report October 12,1995 RBG-42059 RBF1-95-0247 Page 2 of 2 cc:
U.S. Nuclear Regulatory Commission, Region IV NRC Sr. Resident Inspector INPO Records Center I
Mr. C.R. Oberg Public Utility Commission of Texas 4
Dottie Sherman American Nuclear Insurers Cajun Electric Power Co-Op, Inc.
1
)
l
DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.
R-95-09 DATE October 10.1995 COMPLETED BY T. J. Bolke TITLE Ensrineer III TELEPIIONE 504-346-8651 ext. 2940 MONTil September 1995 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL (MWe-Net)
(MWe-Net) 1.
920.1 17.
918.5 2.
919.1 18.
923.7 3.
911.3 19.
924.8 4.
922.1 20.
920.5 5.
924.3 21.
921.3 6.
925.5 22.
930.3 7.
927.I 23, 932.9 8.
925.5 24, 929.4 9.
923.0 25.
926.6 10.
926.6 26.
925.6 11.
927.2 27.
927.0 12.
924.9 28.
927.7 13.
922.3 29.
925.4 14.
919.5 30.
922.4 15.
886.1 16, 822.5 d
DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.
R-95-09 DATE October 10.1995 COMPLETED BY T. J. Bolke TITLE Engineer III TELEPIIONE 504-346-8651 ext. 2940 PAGE 1
OF 2 OPERATING STATUS
- 1. REPORTING PERIOD: September,1995 GROSS IIOURS IN REPORTING PERIOD:
720
- 2. CURRENTLY AUTIIORIZED POWER LEVEL (Mwt): 2894 MAX. DEPEND CAPACITY (MWe-Net): 236 DESIGN ELECTRICAL RATING (MWe-Net): 936
- 3. POWER LEVEL TO WillCil RESTRICTED (IF ANY)(MWe-Net): N/A
- 4. REASONS FOR RESTRICTION (IF ANY): N/A TIIIS YR TO CUMU.
MONTII DATE LATIVE
- 5. NUMBER OF IIOURS REACTOR WAS CRITICAL 720.0 6551.0 63047.2
- 6. REACTOR RESERVE SIIUTDOWN IIOURS 0
0 0
- 7. IIOURS GENERATOR ON LINE 720.0 6551.0 59990.1
- 8. UNIT RESERVE SIIUTDOWN IIOURS o
0 0
- 9. GROSS TIIERMAL ENERGY GENERATED (MWil) 2,073,612 18,867,876 161,940,889
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWII) 707,661 6,465.243 54,847,298
- 11. NET ELECTRICAL ENERGY GENERATED (MWII) 661,999 6,056,613 51,332,345
6 DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.
R-95-09 DATE October 10.1995 COMPLETED BY T..I. Bolke TITLE Engineer III TELEPIIONE 504-346-8651 ext. 2940 PAGE 2
OF 2
OPFRATING STATUS l
l 2
Tills YR TO CUMU-MONTil DATE LATIVE
- 13. REACTOR SERVICE FACTOR 100.0 100.0 73.1 13 REACTOR AVAILABILITY FACTOR 100.0 100.0 73.1
- 14. UNIT SERVICE FACTOR 100.0 100.0 70.9
- 15. UNIT AVAILABILITY FACTOR 100.0 100.0 70.9 l
- 16. UNIT CAPACITY FACTOR (USING MDC) 98.2 98.8 66.1
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 98.2 98.8 66.1
- 18. UNIT FORCED OUTAGE RATE 0.0 0.0 12.7
- 19. SilUTDOWNS SCllEDULED OVER NEXT SIX MONTilS (TYPE, DATE, AND DURATION OF EACII):
Refueling, 1/6/96,60 days i
- 20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
N/A 4
1
UNIT SHUTDOWNS AND POWER REDUCTIONS TIhE TIhE START RECOVER OF FROM DURATION TYPE REASON METHOD CORRECTIVE ACTION /
NO.
DATE OCCURRENCE OCCURRENCE (HOURS)
NOTE (1) NOTE (2) NOTE (3)
COMhENTS None
SUMMARY
NOTE (1)
TYPE OF OCCURRENCE:
ENTER CODE DOCKETNO. 50/458 F:
FORCED RIVER BEND STATION UNIT I S:
SCHEDULED NOTE (2)
REASON FOR OCCURRENCE: ENTER CODE REPORT NO.
R-95-09 A:
EQUIPAENT FAILURE (EXPLAIN IN CORRECTIVE ACTIONS /COMhENTS)
B:
MAINTENANCE ORTEST REPORT MONTH September.1995 C:
REFUELING D:
REGULATORY RESTRICTION E:
OPERATORTRAINING AND LICENSE EXAMINATION DATE October 10.1995 F:
ADMINISTRATIVE G:
OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONS /COMhENTS)
T. J. Bolke H:
OTIER (EXPLAIN IN CORRECTIVE ACTIONS /COMhENTS)
COMPLETED Y NOTE (3)
METHOD OF SHUTTING DOWN REACTOR OR REDUCING POWER.
ENTERONE h/
4IGNATURE 1.
MANUAL 2.
MANUAL SCRAM Engineer III 3.
AUTOMATIC SCRAM TITLE 4.
OTHER (EXPLAIN IN CORRECTIVE ACTION /COMhENTS)