RBG-43231, Monthly Operating Rept for Aug 1996 for River Bend Station

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1996 for River Bend Station
ML20113G326
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/31/1996
From: Bolke T, King R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RBF1-96-0354, RBF1-96-354, RBG-43231, NUDOCS 9609270129
Download: ML20113G326 (6)


Text

EntIrgy oper;tions,Inc.

g Rever Bend Station

, 5485 U. S. Highway 61

" RO. Box 220 St. Francisvdle. LA 70775 Tel 504 336 6225 Fax 504 635 5008 Rick J. King Dnector Nuclear Safety & Regulatory Affans September 16,1996 U. S. Nuclear Regulatory Commission Document Control Desk Mail Stop PI-37 Washington, DC 20555

Subject:

River Bend Station - Unit 1 Docket No. 50-458 Monthly Operating Report File No. G9.5, G4.25 RBG-43231 RBF1-96-0354 '

Gentlemen:

l

)

In accordance with River Bend Station (RBS) Tecimical Specification 5.6.4, enclosed is the I August,1996 Monthly Operating Report for RBS.

Sincerely,

/  %

4 enclosure l

l l

9609270th9 960932 "

$DR ADOCK 05000458 PDR' QVl

Monthly Operating Report September 16,1996 RBG-43231 RBF1-96-0354 Page 2 of 2 cc: U. S. Nuclear Regulatory Commission Region IV ,

611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 ,

i NRC Senior Resident Inspector P.O. Box 1050 St. Francisville, LA 70775 l I

INPO Records Center 1 700 Galleria Parkway Atlanta, GA 30339 Mr. Glen Dishong PUCT 7800 Shoal Cnek Blvd., Suite 400N =

Austin, TX 78757 Dottie Sherman American Nuclear Insurers 29 South Main Street West Hanford, CN 06107 l

l i

i e *

. 1

~ '

DOCKET NO. 50/458 l RIVER BEND STATION UNIT 1 l REPORT NO. R-96-08 DATE September 14.1996 COMPLETED BY T. J. Bolke TITLE Engineer III TELEPIIONE 504-346-8651 ext. 2940 MONTII Aunust 1996 I

DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL (MWe-Net) (MWe-Net)

1. 942.4 17, 943.6
2. 941.0 18, 944.1
3. 940.8 19, 941.9 l
4. 941.2 20. 942.4
5. 940.5 21. 943.0
6. 942.1 22. 943.1 )
7. 942.0 23. 943.3
8. 942.1 24. 944.5
9. 941.8 25. 944.1 10, 942.5 26. 942.9
11. 943.8 27. 942.9
12. 943.7 28. 943.8
13. 945.0 29. 943.8
14. 944.3 30. 944.8
15. 945.5 31. 946.0
16. 944.4 l

i l

DOCKET NO. 50/458  ;

RIVER BEND STATION UNIT 1 REPORT NO. R-96-08 DATE September 14,1996 COMPLETED BY T. J. Bolke TITLE Eneineer III TELEPilONE 504-346-8651 ext. 2940 i i

PAGE 1 OF 2 l OPERATING STATUS '

l. REPORTING PERIOD: August 1996 GROSS IlOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTIIORIZED POWER LEVEL (Mwt): 2894 MAX. DEPEND CAPACITY (MWe-Net): 936 DESIGN ELECTRICAL RATING (MWe-Net): 936
3. POWER LEVEL TO WillCII RESTRICTED (IF ANY)(MWe-Net): N/A
4. REASONS FOR RESTRICTION (IF ANY): N/A i

l l

TIIIS YR TO CUMU- I MONTil DATE LATIVE l

S. NUMBER OF IIOURS REACTOR WAS CRITICAL 744.0 4566.7 69787.4

6. REACTOR RESERVE SIIUTDOWN IIOURS 0 _

0

7. IlOURS GENERATOR ON LINE 744.0 4464.9 66608.2
8. UNIT RESERVE SIIUTDOWN IIOURS 0 0 0
9. GROSS TilERMAL ENERGY GENERATED (MWII) 2.152.651 12.606.732 180.322.673
10. GROSS ELECTRICAL ENERGY GENERATED (MWII) 749.937 4.387.633 61.241.403
11. NET ELECTRICAL ENERGY GENERATED (MWII) 701.690 4.109.122 57.315.961

=~

DOCKET hO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO. R-96-08 DATE September 14.1996 COMPLETED BY T. J. Bolke TITLE Engineer III TELEPHONE 504-346-8651 ext. 2940 PAGE 2 OF 2 OPERATING STATUS 1

a THIS YR TO CUMU-

, MONTil DATE LATIVE

  • 12 REACTOR SERVICE FACTOR

. 100.0 78.0 74.0 13 REACTOR AVAILABILITY FACTOR 100.0 78.0,___ 74.0

14. UNIT SERVICE FACTOR 100.0 76.3 71.9
15. UNIT AVAILABILITY FACTOR 100.0 76.3 71.9.
16. UNIT CAPACITY FACTOR (USING MDC) 100.8 75.0 67.3
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 100.8 75.0 67.3
18. UNIT FORCED OUTAGE RATE 0.0 9.0 12.2
19. SilUTDOWNS SCIIEDULED OVER NEXT SIX MONTIIS (TYPE, DATE, AND DURATION OF EACil):

None

20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

N/A l

UNIT SIIUTDOWNS AND POWER REDUCTIONS .

4 TIME TIME -

START RECOVER OF FROM DURATION TYPE REASON METHOD CORRECTIVE ACTION /

NO. DATE OCCURRENCE OCCURRENCE (HOURS) NOTE (1) NOTE (2) NOTE (3) COMAENTS

SUMMARY

No SRV challenges occured during August.

NOTE (1) TYPE OF OCCURRENCE: ENTER CODE DOCKETNO. 50/458 F: FORCED RIVER BEND STATION UhTF 1 S: SCHEDULED NOTE (2) REASON FOR OCCURRENCE: ENTER CODE REPORT NO. R-96-08 A: EQUIPMENT FAILURE (EXPLAIN IN CORRECTIVE ACTIONS /COMhENTS)

B: MAINTENANCE OR TEST REPORTMONTH August 19%

C: REFUELING D: REGULATORY RESTRICTION E: OPERATORTRAINING AND LICENSE EXAMINATION DATE September 14.1996 F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS) T.1 Bolke 11: OTHER (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS) C,OMPLETED BY NOTE (3) METHOD OF SHUTTING DOWN REACTOR OR REDUCING POWER: ENTER ONE I SIdNATURE

1. MANUAL
2. MANUAL SCRAM Engineer III
3. AUTOMATIC SCRAM TITLE
4. OTHER (EXPLAIN IN CORRECTIVE ACTION / COMMENTS)

TELEPHONE: 504-346-8651 ext. 2940

_ _ - _ _ _ _ _ _ _ - - - _ - _ - - _ - _ _ _ _ - - _ _ _ - - - - _ _ _ _ - _ _ ___ _ .-.. -