Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With
ML20195E824
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/31/1999
From: King R, Williamson D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RBF1-99-0184, RBF1-99-184, RBG-45028, NUDOCS 9906140108
Download: ML20195E824 (4)


Text

.

, EntIrgy operttions, Inc.

River Bend Station y 5485 U S Highway 61 P O. Box 220

, y St Francisville. LA 70775 Tel 225 336 6225 Fax 225 635 50G8 Rick J. King

  • . Owector Nuclear Safety & Regulatory Affairs i

June 8,1999 U. S. Nuclear Regulatory Commission i ATTN: Document Control Desk l Washington, D. C. 20555

Subject:

River Bend Station- Unit 1 Docket No. 50-458 -

Monthly Operating Report File No.: G9.5, G4.25 RBG-45028 RBF1-99-0184 Ladies and Gentlemen:

In accordance with River Bend Station Technical Specification 5.6.4, enclosed is the Monthly Operating Report for May 1999.

Sincerely, RJK/dhw I enclosure

\ .

s- /

{&h Y y' g PDR ADOCK 05000458 '

R PDR ;_

L

Monthly Operating Report June 8,1999 RBG-45028 -

RBF1-99-0184'

' Page 2 of 2 i

cc: U. S. Nuclear Regulatory Commission Region IV -

611 Ryan Plaza Drive, Suite 400 Arlington,TX 76011 NRC Senior Resident Inspector P. O. Box 1050 - l St.Francisville,LA 70775 INPO Records Center

- 700 Galleria Parkway i Atlanta, GA 30339-3064 1 Mr. Jim Calloway Public Utility Commission of Texas

1701 N. Congress Ave.

Austin, TX 78711-3326  !

Dottie Sherman  !

American NuclearInsurers 29 South Main Street.

West Hartford, CT 06107 i

l l

l r<

f i l

U DOCKET NO. 50/458 RIVER BEND STATION

. DATE June 8,1999 COMPLETED BY Danny H. Williamson TITLE Sr. Licensing Specialist TELEPHONE 225-381-4279 PAGE 1 OF 2 1

OPERATING STATUS

1. REPORTING PERIOD: May 1999
2. MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 936 3, DESIGN ELECTRICAL RATING (MWe-Net): 936 MONTH YEAR TO CUMULATIVE DATE
4. NUMBER OF HOURS REACTOR WAS CRITICAL 0 2208.0 90918.4
5. HOURS GENERATOR ON LINE O 2208.0 87578.2
6. UNIT RESERVE SHUTDOWN HOURS 0 0 0
7. NET ELECTRICAL ENERGY GENERATED (MWH) 0 1,796,099 76,519,414

, v o'

)

PAGE 2 OF 2 UNIT SHUTDOWNS {

l I

SHUTDOWN CAUSE/ l NUMBER DATE TYPE DURATION METHOD REASON CORRECTIVE ACTIONS )

99-01 Outage was S 294.5 hrs. 2 C Refueling outage no. 8 j in progress at beginning ofmonth, and ended on 5/13/99 at 0630.

99-02 Outage F 449.5 hrs. 5 H Declared end of refueling started (Unit was (Forced outage no. 8 and entered forced 5/13/99 at already shut outage outage to investigate fuel 0630,and down when entered to assembly corrosion.

still was in outage was investigate progress at entered.) fuel month's assembly end. corrosion.)

LECEND:

TYPE: F Forced SIIUTDOWN METilOD: I - Manual REASON: A - Equipment failure (explain)

S - Scheduled 2 Manualtrip/seram B Maintenance or Test 3- Automatie trip /scrain C - Refueling 4 Continuation D Regulatory restriction 5 Other(czplain) E- Operator training / License eram F Administrative ,

G Operationalerror(etplain) '

II Other(explain)

NOTES:

1. No challenges to the reactor safety-relief valves occurred in May, m th & -J -

Danny H. Williamson I