ML20197G859

From kanterella
Revision as of 21:25, 8 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1998 for Dresden Nuclear Power Station.With
ML20197G859
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 11/30/1998
From: Butterfield S, Heffley J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, JMHLTR:#98-0298, JMHLTR:#98-298, NUDOCS 9812110042
Download: ML20197G859 (11)


Text

Continonw cahli 141N >n (.ontpa n)

, tirexten (eentrating $tation

...- MOO Nonti 1)revicn 1(oad Morris. II,(d)150 T< l 81 % 9i2 2'120 December 4,1998 JMHLTR: #98-0298 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Dresden Nuclear Power Station Commonwealth Edison Company [

Docket Nos.50-010,50-237, and 50-249 Scbject: Monthly Operating Data Report for November 1998 I

Enclosed is the Dresden Nuclear Power Station Monthly Operating Summary Report for November 1998.

l This information is supplied to your oflice as required by Technical Specification 6.9.A.5, l

in accordance with the instructions set forth in Regulatory Guide 1.16. and Generic Letter 1 97-02. I Respectfully, J. - e e S' . Vice Presid t Dresden Nuclear ower Station Enclosure cc: NRC Region Ill Oflice Illinois Dept. of Nuclear Safety, State ofIllinois NRC Senior Resident Inspector, Dresden Nuclear Power Station i UDI, Inc. - Washington, DC File / Numerical i

9812110042 981130 PDR ADOCK 05000010 l

R PW 3 L nicom onnpany

l l

i l

l' i

MONTHLY NRC SUl49JtY OF OPERATING EXPERIENCE, '

PER REGULATORY GUIDE 1.16 FOR -

DRESDEN NUCLEAR POWER STATION i i

COtedONWEALTH EDISON COMPANY ,

FOR NOVEMBER 1998 e

UNIT DOCKET LICENSE 1 050-010 DPR-2 2 050-237 DPR-19

)

3 050-249 DPR-25 l

I I

i l

i

)

1 l

t

?

. f r

TABLE.OF CONTENTS '

NOVEMBER 1998 NRC REPORT.

{

1.0 Introduc, tion j

2.0. Summary of Operating Experience 2.1 Unit 2 Monthly Operating Experience Summary. ,

2.2 Unit 3 Monthly Operating Experience Summary. '

3.0 Operating Data Statistics 3.1 Operating Data Report - Dresden Unit 2  ;

3.2 Operating Data ~ Report - Dresden Unit 3 '

3.3 Unit 2 Shutdowns 3.4 Unit 3 Shutdowns 4.0 Unique Reporting Requirements 4.1 Main Steam Relief and/or Safety Valve Operations - i Unit 2 and Unit 3 i

4.2 Technical Specificat ion Amendments  !

l f.,

2

I 1

i 1.0 Introduction Dresden Nuclear Power Station is a three reactor generating facility owned and operated by the Comed Company of Chicago, Illinois. Dresden Station is located at the confluence of the Kankakee and Des Plaines Rivers, in Grundy County, near Morris, i

! Illinois.

l Dresden Unit 1 is a General Electric Boiling Water Reactor with a design net electrical output rating of l l 200 megawatts electrical (MWe). The unit is being '

l decommissioned with all nuclear fuel removed from the reactor vessel. Therefore, no Unit 1 operating data is l provided in this report.

l Dresden Units 2 and 3 are General Electric Boiling Water Reactors; each licensed at 2527 megawatts thermal. The gross outputs of Units 2 and 3 are 832 and 834 megawatts electrical, respectively, with design net electrical output ratings of 794 MWe each. The

, commercial service date for Unit 2 is 11 August 1970  ;

i '

and 30 October 1971 for Unit 3.

Waste heat is rejected to a man-made cooling lake using the Kankakee River for make-up and the Illinois River for blowdown.

The Architect-Engineer for Dresden Units 2 and 3 was Sargent and Lundy of Chicago, Illinois.

l Sherry Butterfield of Dresden Regulatory Assurance Staff compiled this report for November 1998, telephone number (815) 942-2920, extension 2959.

i l

t 3

t l

I 2.0

SUMMARY

OF OPERATING EXPERIENCE FOR NOVEMBER 1998 2.1 UNIT 2 MONTHLY OPERATING EXPERIENCE

SUMMARY

l Unit 2 operated throughout the period at full power except for short periods for surveillance and maintenance. At 2306 on November 21, I

commenced a load reduction to 200 MWe for single loop operation. At 0340 on November 22, secured the load drop and at 0750 stopped the 2A i recirculation pump motor generator set for brush replacement. At 1038 on November 22, restarted 2A recirculation pump and commenced load increase.

At 1930 on November 22, achieved full power.

l r

i r

4 l

l l

I 2.0

SUMMARY

OF OPERATING EXPERIENCE FOR NOVEMBER 1998 2.2 UNIT 3 MONTHLY OPERATING EXPERIENCE

SUMMARY

l Unit 3 operated throughout the period at full l power except for short periods for surveillance l and maintenance. l l l l

1 l

l-I a

5

--__._..._m. . . . _ . . _ . _ . _ . _ _ . . . . _ . ~ . . _ . _ _ . . _ _ _ _ . _ _ ._..._ ___ _ . _ . _ _ _ _ _ . _ . . ,

1

~

3.0 OPERATING DATA STATISTICS 3.1 OPERATING DATA REPORT - DRESDEN UNIT TWO l DOCKET No. 050-237 DATE December 2, 1998 COMPLETED BY Sherry'Butterfield TELEPHONE (815) 942-2920 OPERATING STATUS l

l 1. REPORTING PERIOD: November 1998 l 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) : 2,527 l l

MAXIMUM DEPENDABLE CAPACITY (MWe NET): 772 l DESIGN ELECTRICAL RATING (MWe Net) : 794

3. POWER LEVEL TO WHICH RESTRICTED (MWe Net) : No restrictions i 4. REASONS FOR RESTRICTIONS (IF ANY): See Section 2.1 of this report.

l RRRI1NGRRCDEATA pmumn m s e nH YFWUDDUE QMAME E ICLRS IN HRKD 720 8,01E 248,112 l l 6 TDE IEPCER CRITICPL 720 6,865 181,877 l- 7 TDE IEPCKR IESNE !H.MDN Ghrs) O C C 8 TDE GHHMR CN-IRE Ohrs) 720 6,725 173,479 S TBE GNRGCR IEENE SUEDH Ohrs) 0 3 4 1C 'DERfL 3lN!RE GENiHGD Milt (kens) 1,774,608 16,298,204 366,061,627 11 EuicuuCmL numar manen seems aoss) 581,442 5,288,345 117,022,180 12 MN INiRE GNiNMD 0+EHe Net) 556,534 5,048,739 110,728,914 l- 13 IEPCKR S!RVICE DCER (%) 100.0i> 85.7;. 73.3i 14 IEPCER RMPJIAEELTIY DCER (%) 100.01 85.77- 73.3t 15 GNEPER fERVICE DCKR (%) 100.05 83.9' 69.91 16 GNRGCR M#dIAILILTIY DCKR (%) 100.01 83.9- 69. 9.-

l 17 CADCIIY DCKR (Usirg MD Net) (%) 100.19 81.Cr 57.8' 18 09CTIY DCKR (GEirg D!R Net) (%) 97.4i 79.3s- 56.21 19 PCH2D CUINE DCKR (%) 01 3.85 12.5i i

r i

6

.. . - - . - - . - . - . - - ~ _ _ . . _ - . . - . - . - - _ _ . - . - . . . - . - . - . . .

t .

4 t -

l 3

3.0 OPERATING DATA STATISTICS I j 3.2 OPERATING DATA REPORT - DRESDEN UNIT THREE i i DOCKET No. 050-249 l DATE December 2,1998  !

COMPLETED BY S. Butterfield '

4 TELEPHONE (815) 942-2920 1 i l OPERATING STATUS l 4 1 I

i

1. REPORTING PERIOD: Novembe: 1998 1
2. CURRENTLY AUTHORIZED POWER LEVEL (MWth): 2,527 )

MAXIMUM DEPENDABLE CAPACITY (MWe Net): 773 DESIGN ELECTRICAL RATING (MWe Net) : 794

] 3. POWER LEVEL TO WHICH RESTRICTED: No restriction j 4.

REASONS FOR RESTRICTIONS (IF ANY): See Section 2.2 of )

, this report. '

FEPORTIPGPERODIRTA

] PARAWETER THSMON1HMTO[ RTE CLDRAME

5 inRS IN PERICD 72b 8,016 237,432 5

6 TDE REACER CRTTICAL 720 7,510 169,451 7 TINE REACER IESERVE SHLMDOW (Iturs) 0 0 C l 8 TDE GumARR CN-LDE (Hours) 720 7,413 161,837 l 9 TDE GHEAER IESERVE SIGDON (Ikurs) 0 1 1 10 nERAL DuluY GumAniD Oest Gress) 1,788,482 18,183,485 341,383,458 11 nacmumL manx cuummo 6eems aross) 582,649 5,880,802 109,368,961 12 EWC5tICAL DEEGY GNEAEiD 04EHa Net) 560,256 5,647,439 103,754,35C 13 REACKR SERVIG DCER (%) 100.0i 93.7% 71.41 14 REACKR AVAIIABILITY DCER (%) 100.0V 93 . 7'+ 71.4i 15 G!NERAER SERVICE FACKR (%) 100.0't 92.51 68.21 16 GiNERAER .WAIIABLILITY DCER (%) 100.0) 92.5V 68.2f

}

17 CAPACITY DCKR (Usirq ICD Net) (%) 100.8% 91.31 56.6) 18 CAPACITY DCKR (Usirq DER Net) (%) 98.0V 88.71 55.0i 19 Ema!D CUINE DCAR (%) 0. 0'r 3.51 13.9:

l l

7

l ,

l 3.3 UNIT 2 SHUTDOWNS REPORT MONTH OF NOVEMBER 1998 HO DATE TY I'E DURATION F"*SOH tiETHOD OF CokkECTIVE (1) (HOURS)* (2) C UTTING I '

REAl"POR (3)

Year-to-date forced outage hours = 263 Cumulative forced outage hours = 24691 TABLE KEY:

(1) (3)

F: Forced Method:

S: Scheduled 1. Manual

2. Manual Scram f (2) Reason: 3. Automatic Scram A Equipment Failure (Explain) 4. Other (Explain)

B Maintenance or Test 5. Load heduction C Refueling D Regulatory Restriction E Operator Training &

Licensing Exam F Administrative G Operational Error H Other (Explain) l I

8

I 3.4 UNIT 3 SHUTDOWNS REPORT MONTH NOVEMBER 1998 No DATE TY I'E ( 1 ) DURATION REASON (2) METHOD OF 0)RFECTIVE

( Hof)RD )

  • SHUTTING A.NION3/

DOWN Cr$MENTS REArNOR (3) l Year-to-date forced outage hours = 272 l Cumulative forced outage hours = 26,212 l TABLE KEY- l (1) (3) I F: Forced Method: I S: Scheduled 1. Manual l

2. Manual Scram l (2) 3. Automatic Scram Reason: 4. Other (Explain)

A Equipment Failure 5. Load Reduction (Explain)

B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training &

Licensing Exam F Administrative G Operational Error H Other (Explain) l i

l 9

. .. . . . .. - _.. ~ . _ . .- . - . ~ .- -. . . _ . - ..-. . . . . - .

4.0 UNIQUE REPORTING REQUIREMENTS >

4.1 MAIN STEAM RELIEF AND/OR SAFETY VALVE OPERATIONS -  !

UNIT 2 - NONE UNIT 3 - NONE 4.2 . Technical Specification Amendments

.NONE' I

i I

1 i

i I

l i-i 10 L \lLVOA301%C3C@7197011001.OA l-I L: .