3.0 OPERATING DATA STATISTICS (revised 5/30/97) 3.2 OPERATING DATA REPORT - DRESDEN UNIT THREE DOCKET No.

050-249 DATE MAY 1, 1997 COMPLETED BY G. A. ABRELL TELEPHONE (815) 942-2920 OPERATING STATUS 1.

REPORTING PERIOD:

APRIL 1997 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWth):

2,527 MAXIMUM DEPENDABLE CAPACITY (MWe Net):

773 DESIGN ELECTRICAL RATING (MWe Net) :

794 3.

POWER LEVEL TO WHICH RESTRICTED: No restriction 4.

REASONS FOR RESTRICTIONS (IF ANY):

See Section 2.2 of this report.

REPORTING PERIOD DATA PARAMETER THIS MONTH YEAR TO DATE CUMULATIVE 5

BOURS IN PERIOD 719 2,879 2J3,535 6

TIM REACTOR CRITICAL 0

1395.8 157,2'5 7

TIM REACTOR RESERVE SHUTDOWN (Hours) 0.O c

0 8

TIM 07,NERATOR ON-LINE (Hours) 0 1,356 149,880 9

TIM MNERATOR RESERVE SHUTDOWN (Bours) 0.0 0

0 10 THEJMAL ENERGY GENERATED (MWBt Gross) 0 2,267,370 312,479,855 l

11 azacTRIcAL smasy ammaArso (meme pross) 0 729,656 100,002,797 12 ELECTRICAL ENERGY GENERATED (MNEHe Net)

-4,056 686,361 94,768,862 13 krx: TOR SERVICE FACTOR (t) 0.0%

48.5%

70.3%

14 REACTOR AVAILABILITY FACTOR (t) 0.0%

48.5%

70.3%

15 GEMRATOR SERVICE FACTOR (t) 0.0%

47.1%

67.0%

16 GENERATOR AVAILABLILITY FACTOR (4) 0.09 47.19 67.O%

17 CAPACITY FACTOR (Using MCD Net) (t)

-0.7%

30.9%

54.94 18 CAPACITY FACTOR (Using DER Net) (t)

-0.79 30.0%

53.44 19 FORCED OUTAGE FACTOR (t) 0.0%

35.1%

14.7%

l 20.

SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS: In refuel l

outage D3R14.

I 21.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: June 2,

1997, t

9706110078 970606 PDR ADOCK 05000010 1