3.0 OPERATING DATA STATISTICS (revised 5/30/97) 3.2 OPERATING DATA REPORT - DRESDEN UNIT THREE DOCKET No.
050-249 DATE MAY 1, 1997 COMPLETED BY G. A. ABRELL TELEPHONE (815) 942-2920 OPERATING STATUS 1.
REPORTING PERIOD:
APRIL 1997 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth):
2,527 MAXIMUM DEPENDABLE CAPACITY (MWe Net):
773 DESIGN ELECTRICAL RATING (MWe Net) :
794 3.
POWER LEVEL TO WHICH RESTRICTED: No restriction 4.
REASONS FOR RESTRICTIONS (IF ANY):
See Section 2.2 of this report.
REPORTING PERIOD DATA PARAMETER THIS MONTH YEAR TO DATE CUMULATIVE 5
BOURS IN PERIOD 719 2,879 2J3,535 6
TIM REACTOR CRITICAL 0
1395.8 157,2'5 7
TIM REACTOR RESERVE SHUTDOWN (Hours) 0.O c
0 8
TIM 07,NERATOR ON-LINE (Hours) 0 1,356 149,880 9
TIM MNERATOR RESERVE SHUTDOWN (Bours) 0.0 0
0 10 THEJMAL ENERGY GENERATED (MWBt Gross) 0 2,267,370 312,479,855 l
11 azacTRIcAL smasy ammaArso (meme pross) 0 729,656 100,002,797 12 ELECTRICAL ENERGY GENERATED (MNEHe Net)
-4,056 686,361 94,768,862 13 krx: TOR SERVICE FACTOR (t) 0.0%
48.5%
70.3%
14 REACTOR AVAILABILITY FACTOR (t) 0.0%
48.5%
70.3%
15 GEMRATOR SERVICE FACTOR (t) 0.0%
47.1%
67.0%
16 GENERATOR AVAILABLILITY FACTOR (4) 0.09 47.19 67.O%
17 CAPACITY FACTOR (Using MCD Net) (t)
-0.7%
30.9%
54.94 18 CAPACITY FACTOR (Using DER Net) (t)
-0.79 30.0%
53.44 19 FORCED OUTAGE FACTOR (t) 0.0%
35.1%
14.7%
l 20.
SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS: In refuel l
outage D3R14.
I 21.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: June 2,
- 1997, t
9706110078 970606 PDR ADOCK 05000010 1
R PDR
\\,
(
ItS360'430liMISC\\97S7060502.CA 7