ML20216J399
| ML20216J399 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 07/31/1997 |
| From: | Abrell G COMMONWEALTH EDISON CO. |
| To: | |
| Shared Package | |
| ML20216J359 | List: |
| References | |
| NUDOCS 9709170275 | |
| Download: ML20216J399 (1) | |
Text
-.
j-3.0 OPERATING DATA STATISTICS I
3.1 OPERATING DATA REPORT - DRESDEN UNIT TWO i
j DOCKET No.
050-237 DATE AUGUST 4, 1997 COMPLETED BY G.
A. ABRELL TELEPilONE (815) 942-2920 J
t OPERATING STATUS 1.
REPORTING PERIOD:
JULY 1997 i
2.
CURRENTLY AUTilORIZED POWER LEVEL (MWth):
2,527 MAXIMUM DEPENDABLE CAPACITY (MWe NET):
772 DESIGN ELECTRICAL RATING (MWe Net):
794 3.
POWER LEVEL TO WHICH RESTRICTED (MWo Net): No restrictions 3
4.
REASONS FOR RESTRICTIONS (IF ANY):
See Section 2.1 of this report.
REPORTING PERIOD DATA T HIS Md'ATH i YEARTOMT EI 'CUMULATIV5-PARAMETER i
3 HOURS IN PERIOD 744 5,087 236,423 i
TIME REACTOR CRITICAL 664 4,2$2 171,414 l
TIME REACTOR RESERVE SHUTVOHN (Hours) 0 0
0 TIME GENERATOR ON-LINE (Hours) f50 4,166 163,181 TIME GENERATOR RESERVE SHUTDOWN (Hours)
O O
1 THERMAL ENERGY GENERATED (MfHt Gross) 1,614,306 9,023,037 341,326,9J8 ELECTRICAL ENER0Y GENERATED (HWEHe Gross)
$13,966 3,098,364 108,996,300 KLECTRICAL ENERGY GENERATED (MfEHe Net) 490,380 2,960,456 103,062,38$
REACTOR SERVICE FACTOR (t) 87.49 63.65 72.5t REACTOR AVAILABILITY FACTOR (t) 89.31 63.tt 12.51 GENERATOR SERVICE FACTOR (t) 87.41 81.9%
69.01 GENERATOR AVAILABLILITY FACTOR (t) 87.41 81.9%
69.01 CAPACITY FACTOR (Using li'D Net) (tl bb.4*
75.4%
56.54 CAPACITY FACTOR (Using DER Net) (t) 83.05 73.31 54.9%
M*CED OUTAGE FACTOR (t) 12.61 18.l' 13.05 i
20.
Shutdowns scheduled over the next 6 months: none 21.
If shutdown L.
end of report period, estimated date startup: Unit is in startup and will be put on system 4
August 1, 1997.
i Revised 9/8/97 1
~
9709170275 970910 PDR ADOCK 05000010 R
PDR 1/8%0 #3014(1S097970E0902 UA
(,
t
-.7--v-,
,.m._
,,7----
m
_y-~
.r
-