Summary of 981123 Petition Review Board Meeting Re 2.206 Petition on Perry Unit 1,submitted on 981109 by Ucs.Meeting Attendees ListedML20202D352 |
Person / Time |
---|
Site: |
Perry |
---|
Issue date: |
12/09/1998 |
---|
From: |
Subbaratnam R NRC |
---|
To: |
NRC |
---|
Shared Package |
---|
ML20202D357 |
List: |
---|
References |
---|
FOIA-99-79 2.206, NUDOCS 9902010375 |
Download: ML20202D352 (3) |
|
Similar Documents at Perry |
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20217H1001999-10-13013 October 1999 Summary of 990930 Meeting with Util in Rockville,Md Re Proposed Five Percent Power Uprate for Plant,Unit 1.List of Meeting Participants & Licensee Meeting Handout Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20206P0831999-05-12012 May 1999 Summary of 990428 Meeting with Firstenergy Nuclear Operating Co & Duquesne Light Co in Rockville,Maryland Re Proposed Asset Transfer Between Firstenergy Corp & Dl & Resulting 10CFR50.80 License Transfer of Dl Ownership Interest ML20206D6031999-04-30030 April 1999 Summary of 990318 Meeting with Firstenergy Nuclear Operating Co in Rockville,Maryland Re Review Schedule & Content of Proposed QA Topical Rept for Both Davis-Besse & Perry Facilities.List of Meeting Attendees Encl ML20205D4831999-03-25025 March 1999 Summary of 990222 Public Hearing with Util Re Gathering Addl Info Related to Two Petitions Filed Pursuant to 10CFR2.206 by Ucs Re Operation of River Bend Station & Perry Nuclear Power Plant.List of Attendees & Transcript of Hearing Encl ML20198S3061999-01-0505 January 1999 Summary of 981204 Meeting with Util in Rockville,Md to Discuss Proposed Changes to Design & Licensing Basis of Containment Isolation Provisions for Feedwater Sys ML20198D5801998-12-15015 December 1998 Summary of 981119 Meeting with Util in Rockville,Md to Discuss Proposed Changes to Design & Licensing Basis of Containment Isolation Provisions for Feedwater Sys ML20202D3521998-12-0909 December 1998 Summary of 981123 Petition Review Board Meeting Re 2.206 Petition on Perry Unit 1,submitted on 981109 by Ucs.Meeting Attendees Listed ML20155H3801998-10-29029 October 1998 Summary of 980915 Meeting with Util & Contractor Polestar Applied Technology,Inc in Rockville,Md Re Revised Accident Source Term for Perry Pilot Plant Review.List of Meeting Participants & Nonproprietary Handouts Encl ML20154J3671998-10-13013 October 1998 Summary of 980910 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md Re Licensee Proposed Changes to Design & Licensing Basis to Containment Isolation Provisions for Feedwater System.List of Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20199L2071997-11-24024 November 1997 Trip Rept of 971006 Visit to Perry Site to Gather Info on New & Unique Strainer Design Installed at Perry During Most Recent Outage ML20141E7701997-05-14014 May 1997 Summary of 970508 Meeting W/Cei in Rockville,Md Re Priorities & Schedules of Licensing Issues for Plant,Unit 1. List of Meeting Attendees & Meeting Handout Encl ML20140H4881997-05-0707 May 1997 Provides Summary of 970401 Telcon Between NRC & BWROG Re Topical Rept NEDC-31858P,Rev 2, BWROG Rept for Increasing MSIV Leakage Rate Limits & Elimination of Leakage Control Sys ML20138D9441997-04-23023 April 1997 Summary of 970324 Meeting W/Licensee in Rockville,Md Re ECCS suction-strainer Program for Perry Npp,Unit 1.List of Attendees & Viewgraphs Encl ML20134A9621997-01-22022 January 1997 Summary of 961204 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Centerior Energy Corporation & Ohio Edison Company.List of Attendees & Info Handouts Encl ML20147A7261997-01-22022 January 1997 Summary of 960910 Meeting W/Util in Rockville,Md to Discuss Revised Eal.List of Attendees Encl ML20062J8701993-11-0808 November 1993 Summary of 931028 Meeting W/Licensee in Rockville,Md Re Licensee Presentation of Summary of Plant Course of Action Plan to NRC Mgt ML20057F1271993-10-0505 October 1993 Summary of 930902 Meeting W/Util in Rockville,Md Re NRC 930405 Safety Evaluation of Rev 3 to IST Program.List of Attendees Encl ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246B5161989-04-28028 April 1989 Summary of 890419 Operating Reactors Events Meeting 89-16. List of Attendees & Handouts Encl ML20206D7761988-11-0808 November 1988 Summary of 881102 Meeting W/Util in Rockville,Md Re Facility Operating Performance.External Performance Assessments, Performance Indicators,Mgt Initiatives & Feedback Effectivness Discussed.Agenda & Viewgraphs Encl ML20207N9071988-10-12012 October 1988 Summary of 881006 Meeting W/Licensee & GE Re Forthcoming Reload Submittal for Feb 1989 Reload.Attendees List & Nonproprietary Slides Presented by GE Outlining Scope of Reload Application to Be Submitted by Nov 1988 Encl ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20150D7171988-07-0707 July 1988 Summary of Operating Reactors Events Meeting 88-26 on 880628 ML20153B0281988-06-22022 June 1988 Summary of Operating Reactors Events Meeting 88-25 on 880621.List of Attendees,Discussion of Significant Elements of Events & Summary of Reactor Scrams Encl ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20154A8991988-05-0404 May 1988 Summary of Operating Reactors Events 88-18 Meeting on 880503 Re Events Which Occurred Since 880426 Meeting.List of Attendees & Viewgraphs Encl ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20239A0231987-09-10010 September 1987 Summary of Operating Reactor Events Meeting 87-30 on 870908, Re Briefing Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870825 Meeting.Attendees List,Summary of Reactor Scrams & Viewgraphs Encl ML20207A5221987-05-15015 May 1987 Summary of Operating Reactors Event Meeting 87-13 on 870507 Re Events Which Occurred Since 870428.List of Attendees, Events Discussed & Significant Elements of Events & Summary of Events Presented Encl ML20204E5421987-03-19019 March 1987 Summary of Operating Reactors Events Meeting 87-06 on 870309.List of Attendees & Events Discussed & Significant Elements of Events Presented Encl ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20215D0631986-12-11011 December 1986 Summary of Operating Reactor Events Meeting 86-42 on 861201. List of Attendees & Viewgraphs Re Significant Elements of Events Discussed Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20215D9171986-10-0606 October 1986 Summary of 860929 Operating Reactors Events Meeting 86-34 Re Events Since Last Meeting on 860922.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Viewgraphs Encl ML20210C4211986-09-11011 September 1986 Summary of Operating Reactors Events Meeting 86-31 on 860908.Lists of Attendees,Events & Significant Elements & Assignments Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20211P1361986-07-16016 July 1986 Summary of 860707 Operating Reactor Events Meeting 86-23 W/ Div Directors & Representatives Re Events Since Last Meeting on 860630.Notification of Inability to Meet Assigned Target Completion Dates for Actions Requested.Viewgraphs Encl ML20199L5241986-06-30030 June 1986 Summary of 860611 Meeting W/Util,Usgs,Weston Geophysical, Shaw-Pittman Assoc,Geosciences Svcs,Univ of South Carolina, Gilbert Commonwealth Assoc & Nts Engineering Re Completion of Earthquake Confirmatory Items in Sser 9 ML20199L6471986-06-26026 June 1986 Summary of Operating Reactors Events Meeting 86-21 on 860623.Attendance List & Viewgraphs Encl ML20198D5391986-05-12012 May 1986 Summary of 860430 Meeting W/Util,Nts Engineering,Usgs, Gilbert Commonwealth,Weston Geophysical,Geoscience Svcs & Univ of South Carolina Re Earthquake Confirmatory Work Required in Sser 9.Attendance List Encl 1999-08-04
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20217H1001999-10-13013 October 1999 Summary of 990930 Meeting with Util in Rockville,Md Re Proposed Five Percent Power Uprate for Plant,Unit 1.List of Meeting Participants & Licensee Meeting Handout Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20206P0831999-05-12012 May 1999 Summary of 990428 Meeting with Firstenergy Nuclear Operating Co & Duquesne Light Co in Rockville,Maryland Re Proposed Asset Transfer Between Firstenergy Corp & Dl & Resulting 10CFR50.80 License Transfer of Dl Ownership Interest ML20206D6031999-04-30030 April 1999 Summary of 990318 Meeting with Firstenergy Nuclear Operating Co in Rockville,Maryland Re Review Schedule & Content of Proposed QA Topical Rept for Both Davis-Besse & Perry Facilities.List of Meeting Attendees Encl ML20205D4831999-03-25025 March 1999 Summary of 990222 Public Hearing with Util Re Gathering Addl Info Related to Two Petitions Filed Pursuant to 10CFR2.206 by Ucs Re Operation of River Bend Station & Perry Nuclear Power Plant.List of Attendees & Transcript of Hearing Encl ML20198S3061999-01-0505 January 1999 Summary of 981204 Meeting with Util in Rockville,Md to Discuss Proposed Changes to Design & Licensing Basis of Containment Isolation Provisions for Feedwater Sys ML20198D5801998-12-15015 December 1998 Summary of 981119 Meeting with Util in Rockville,Md to Discuss Proposed Changes to Design & Licensing Basis of Containment Isolation Provisions for Feedwater Sys ML20202D3521998-12-0909 December 1998 Summary of 981123 Petition Review Board Meeting Re 2.206 Petition on Perry Unit 1,submitted on 981109 by Ucs.Meeting Attendees Listed ML20155H3801998-10-29029 October 1998 Summary of 980915 Meeting with Util & Contractor Polestar Applied Technology,Inc in Rockville,Md Re Revised Accident Source Term for Perry Pilot Plant Review.List of Meeting Participants & Nonproprietary Handouts Encl ML20154J3671998-10-13013 October 1998 Summary of 980910 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md Re Licensee Proposed Changes to Design & Licensing Basis to Containment Isolation Provisions for Feedwater System.List of Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20141E7701997-05-14014 May 1997 Summary of 970508 Meeting W/Cei in Rockville,Md Re Priorities & Schedules of Licensing Issues for Plant,Unit 1. List of Meeting Attendees & Meeting Handout Encl ML20140H4881997-05-0707 May 1997 Provides Summary of 970401 Telcon Between NRC & BWROG Re Topical Rept NEDC-31858P,Rev 2, BWROG Rept for Increasing MSIV Leakage Rate Limits & Elimination of Leakage Control Sys ML20138D9441997-04-23023 April 1997 Summary of 970324 Meeting W/Licensee in Rockville,Md Re ECCS suction-strainer Program for Perry Npp,Unit 1.List of Attendees & Viewgraphs Encl ML20134A9621997-01-22022 January 1997 Summary of 961204 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Centerior Energy Corporation & Ohio Edison Company.List of Attendees & Info Handouts Encl ML20147A7261997-01-22022 January 1997 Summary of 960910 Meeting W/Util in Rockville,Md to Discuss Revised Eal.List of Attendees Encl ML20062J8701993-11-0808 November 1993 Summary of 931028 Meeting W/Licensee in Rockville,Md Re Licensee Presentation of Summary of Plant Course of Action Plan to NRC Mgt ML20057F1271993-10-0505 October 1993 Summary of 930902 Meeting W/Util in Rockville,Md Re NRC 930405 Safety Evaluation of Rev 3 to IST Program.List of Attendees Encl ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246B5161989-04-28028 April 1989 Summary of 890419 Operating Reactors Events Meeting 89-16. List of Attendees & Handouts Encl ML20206D7761988-11-0808 November 1988 Summary of 881102 Meeting W/Util in Rockville,Md Re Facility Operating Performance.External Performance Assessments, Performance Indicators,Mgt Initiatives & Feedback Effectivness Discussed.Agenda & Viewgraphs Encl ML20207N9071988-10-12012 October 1988 Summary of 881006 Meeting W/Licensee & GE Re Forthcoming Reload Submittal for Feb 1989 Reload.Attendees List & Nonproprietary Slides Presented by GE Outlining Scope of Reload Application to Be Submitted by Nov 1988 Encl ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20150D7171988-07-0707 July 1988 Summary of Operating Reactors Events Meeting 88-26 on 880628 ML20153B0281988-06-22022 June 1988 Summary of Operating Reactors Events Meeting 88-25 on 880621.List of Attendees,Discussion of Significant Elements of Events & Summary of Reactor Scrams Encl ML20154A8991988-05-0404 May 1988 Summary of Operating Reactors Events 88-18 Meeting on 880503 Re Events Which Occurred Since 880426 Meeting.List of Attendees & Viewgraphs Encl ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20239A0231987-09-10010 September 1987 Summary of Operating Reactor Events Meeting 87-30 on 870908, Re Briefing Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870825 Meeting.Attendees List,Summary of Reactor Scrams & Viewgraphs Encl ML20207A5221987-05-15015 May 1987 Summary of Operating Reactors Event Meeting 87-13 on 870507 Re Events Which Occurred Since 870428.List of Attendees, Events Discussed & Significant Elements of Events & Summary of Events Presented Encl ML20204E5421987-03-19019 March 1987 Summary of Operating Reactors Events Meeting 87-06 on 870309.List of Attendees & Events Discussed & Significant Elements of Events Presented Encl ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20215D0631986-12-11011 December 1986 Summary of Operating Reactor Events Meeting 86-42 on 861201. List of Attendees & Viewgraphs Re Significant Elements of Events Discussed Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20215D9171986-10-0606 October 1986 Summary of 860929 Operating Reactors Events Meeting 86-34 Re Events Since Last Meeting on 860922.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Viewgraphs Encl ML20210C4211986-09-11011 September 1986 Summary of Operating Reactors Events Meeting 86-31 on 860908.Lists of Attendees,Events & Significant Elements & Assignments Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20211P1361986-07-16016 July 1986 Summary of 860707 Operating Reactor Events Meeting 86-23 W/ Div Directors & Representatives Re Events Since Last Meeting on 860630.Notification of Inability to Meet Assigned Target Completion Dates for Actions Requested.Viewgraphs Encl ML20199L5241986-06-30030 June 1986 Summary of 860611 Meeting W/Util,Usgs,Weston Geophysical, Shaw-Pittman Assoc,Geosciences Svcs,Univ of South Carolina, Gilbert Commonwealth Assoc & Nts Engineering Re Completion of Earthquake Confirmatory Items in Sser 9 ML20199L6471986-06-26026 June 1986 Summary of Operating Reactors Events Meeting 86-21 on 860623.Attendance List & Viewgraphs Encl ML20198D5391986-05-12012 May 1986 Summary of 860430 Meeting W/Util,Nts Engineering,Usgs, Gilbert Commonwealth,Weston Geophysical,Geoscience Svcs & Univ of South Carolina Re Earthquake Confirmatory Work Required in Sser 9.Attendance List Encl ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20204A1371986-05-0505 May 1986 Summary of 860418 Meetings W/Usgs & Util Re Progress on Geology/Seismology Confirmatory Issues for Plants.Attendance List Encl 1999-08-04
[Table view] |
Text
. . - - . - . . - - - . - . - - . ~ - - - - . . - _ - - . - _ . . -- - - . - . - .-_.- _ -
. Decerber 9,1998 2.206 PETITION REVIEW BOARD
SUMMARY
i 2.206 Petition on Perry Unit 1 - G19980678
- 1. The NRR 2.206 Petition Review Board (PRB) met on 11/23/98 at 2:00 p.rn. at 0-12-B-4.
GREEN TICKET NO.: G19980678
- 2. FACILITIES / ORGANIZATIONS: Union of Concerned Scientists (UCS)
- 3. DATE OF PETITION: November 9,1998
- 4. Present at the meeting were:
F. Hebdon, Board Chairman D. Pickett, Petition Manager l Ram Subbaratnam, NRR, Agency 2.206 Coordinator '
R. Hoefling, OGC R. Caruzo, SRXB
~
J. Donohue, SRXB !
R. Emch, PERB
- 5. Facility: Perry Unit 1
- 6. Petitions discussed: Petition request from UCS to William Travers, EDO, NRC, dated November 9,1998.
~ ~ ~ '
' ~ ~ ~
- 7. Petitioner's requests:
T" he Petition requests enforcement action to require an immediate shutdown of the Perry Nuclear Power Plant Unit 1 (PNPP), and that the friity remain shut down until all failed fuel assemblies are removed from the reactor core. As an alternate action, the petitioner asserted that PNPP could be restarted after its design and I licensing bases were updated to permit operation with failed fuel assemblies. I Additionally, the UCS requested a public hearing to present new PNPP plant-specific information as well as to discuss the April 2,1998, UCS report on reactor operation with failed fuel assemblies.
--- -- - )
As the basis for the request, the petition states that operation with one or more j failed fuel assemblies is not permitted by Perry's design and licensing bases. More !
specifically, UCS contends that Perry is also violating its worker radiation protection l program (ALARA) licensing basis. !
l
- 8. The petition request was determined to meet the 10 CFR 2.206 criteria.
- 9. The basis for the above determination is as follows:
9902010375 990113 I PDR FOIA =
LOCH 8AU99-79 PDR
, . , . . - - ,a , , , .
The request is for enforcement action: the NRC impose a requirement by order to require PNPP Station to commence an immediate shutdown. 1 The Petitioner presents a basis for the request that is specific and is not a general .
statement of opposition to nuclear power, etc. l l
l There is no evidence that the request is being used to avoid or circumvent an available proceeding in which the petitioner is or could be a party. 1 l
- 10. The board determined that there is no need for 01 or OE involvement.
- 11. The following resolution plan and schedule were approved as low priority and will be handled within the guidelines of Management Directive 8.11:
Activity Due Date
- a. Immediate Acknowled0ment Letter (See item 12 below) 12/11/98 l b. Informal Public Hearing' 2/1/99 (Coordinated with River Bend Nuclear Station)
- c. SRXB and PERB Review Complete TBD
! d. Final Resolution due to NRR Director's Office: 4/11/99
- 12. The tu as to resolve this petition are as follows: l The PRB determined that the request for immediate action to revoke or suspend the license to operate the Perry Nuclear Plant be denied for the following reasons:
Although important concerns were raised in the petition, the board concluded that no urgent safety problems were uncovered which would warrant shutdown of the plant. The clad damage reported is insignificant and is allowable provided the Reactor Coolant I i Chemistry were within permissible Technical Specification (TS) limits as defined in TS l 3.4.8. These limits are set to minimize radiological consequences of a postulated design j basis accident and to meet appropriate acceptance criteria. The petitioner does not allege i that PNPP had operated outside the TS. The NRC has and will continue to closely monitor I events at PNPP to ensure that there is no undue risk to public health and safety.
l The board also reviewed the petitioner's request for an informal public hearing and decided that the request met the criterion as spelled out in Management Directive 8.11, and will be 4 coordinated with a similar petition associated with River Bend Station.
J 4
r
- 13. There is no need for the licensee to provide insights to NRR regarding the petitionet's !
concerns. This will be followed up with the licensee after DD's immediate denial of the r petition
- 14. Prepared by: q% '% \l S9h
/
Petition Review Board Coordinator Date
- 15. Approved by: t. ., _
'lt/9/fg CtYairman, PRB y D a'te '
i e
I i
i s
i
, . ,- - .. . _ _ . . . . . _ - - - - - - - - - - - - - - - - - - - - - - - - ~ - - - ~ - - ~
UNITED STATES
-[
in NUCLEAR RECULATORY COMMISSION ~
WAsMINGToN, D.c. 3000M1001
- December 16, 1998 Mr. David A. Lochbaum Union of Concemed f>cienbsts 1616 P Street, NW, Suite 310 Washington, DC 20036-1495
Dear Mr. Lochbaum:
I have received the Petition that you submitted on behalf of the Union of Concemed Scientists (UCS), dated November 9,1998, addressed to Dr. William Travers, Executive Director for Operations, U.S. Nuclear Regulatory Commission (NRC). The Petition requests enforcement action to require an immediate shutdown of the Perry Nuclear Power Plant (PNPP), Unit No.1 and that the facility remain shut down until all failed fuel assemblies are removed from the reactor core. You also stated that as an attemale action, PNPP could be restarted following the proposed shutdown after its design and licensing bases were updated to permit operation with failed fuel assemblies. Additionally, the Petition requested a public hearing to present new plant-specific information regarding the operation of PNPP. as well as to discuss a UCS report dated April 2,1998, entitled " Potential Nuclear Safety Hazard / Reactor Operation With Failed Fuel Cladding."
As the basis for your request, you cited the NRC's Weekly information Report for the week ending October 30,1998, that describes the apparent existence of two pin hole fuelleaks at the Perry facility. In your opinion, operation with one or more failed fuel assemblies is not permitted by the Perry design and licensing bases. In addition, you also stated that by operating with possible failed fuel cladding, PNPP is violating its licensing basis for the radiation worker protection (as low as reasonably achievable [ALARA]) program. You have referred to NRC _ , . _ _
information Notice No. 87-39, " Control of Hot Particle Contamination at Nuclear Plants," which describes how continued operation with degraded' fuel may elevate radiation exposure rates for plant e,mployees. You have noted that the licensee has the option of shutting down the facility to remove the failed fuel assemblies but has chosen to continue plant operation.
Your Petition further reasserted the UCS position that nuclear power plants operating with fuel cladding failures were potentially unsafe and were in violation of Federal regulations. In its April 1998 report, the UCS stated that it has not been demonstrated that the effects from design-bases transients and accidents (e.g., hydrodynamic loads, fuel enthalpy changes, etc.) prevent pre-existing fuel failures from propagating. Therefore, you coricluded that it was possible that "significantly more radioachve material will be released to the reactor coolant system during a transient or accident than that experienced during steady state operation. Thus, the existing
, design bases accident analyses for Perry do not bound its current operation with known fuel cladding failures."
When the staff received your Petition, it conducted a preliminary evaluation to determine if an urgent safety issue was involved that warranted the requested action. Although you raised Y
emuah .
, David A. Lochbaum -
important concems in your Petition, the staff has concluded that the Petition uncovered no urgent safety problems that warranted immediate action by the NRC. Technical Specifications (TS) limits on reactor coolant system (RCS) activity typically account for a small fraction of failed fuel, which can occur during normal operations. These limits are set to values of RC.S-specific activity, which ensure that the radiological consequences of postulated design- basis accKients are within the appropriate dose acceptance criteria. At PNPP, operation with a minimal amount of fuel cladding damage is allowed, provided the licensee continues to meet RCS chemistry requirements of TS Section 3.4.8. Furthermore, the Petition did not include any information indicating that PNPP has cperated outside its TS limits. Consequently, your request for enforcement action to require the immediate shutdown of PNPP is denied.
The licensee has taken actions to address the suspected condition of the fuel assemblies, including the insertion of control rods to ' isolate" the fuel assemblies in order to minimize reactor coolant activity levels. The NRC has been monitoring RCS activity at PNPP and will continue to ensure that there is no undue risk to public health and safety.
i in your Petition, you also requested that the NRC conduct an informal public hearing in order to
- present new information on reactor operation with failed fuel assemblies" as a followup to the April 1998 UCS report, as well as to provide plant-specific information regarding the operation of PNPP. To ensure that potential issues relating to this material are appropriately addressed, the NRC is hereby offering you an opportunity to present the new information referred to in your Petition at an informal public hearing. The public hearing will also allow the licensee and the public to present other pertinent information, as well as provide a means to solicit questions from all participants. The NRC staff will subsequently use the information gained from the hearing to evaluate the issues raised in your Petition and to render a Director's Decision pursuant to 10 CFR 2.206.
The Union of Concemed Scientists submitted a similar Petition conceming continued plant - - - - - -
, operation with fuel cladding failures at the River Bend Station on September 25,1998. As with the current Petition, your Petition for River Bend requested a hearing in the Washington, D.C.,
area to discuss new information on reactor operation with failed fue; assemblies. Your letter of November 6,1998, accepted NRC's offer for an informal public hearing ind described the new information that you wish to discuss. Through verbal communications with Robert Fretz, the NRC Project Manager for the River Bend Station, we understand that you are willing to address both the River Bend and the Perry facilities in a combined public hearing. We would also like to combine both facilities in a public hearing in the Washington, D.C., area. Since you are currently dealing with Mr. Fretz to establish a mutually agreeable date, time, and location for the informal public hearing, we request that you continue to use Mr. Fretz as your point of contact.
If you have additional new information beyond that provided in your letter of November 6,1998, we request that you provide, in advance of the hearing, the new information on reactor operation with failed fuel assemblies. For your information, the NRC Project Manager for the Perry facility is Douglas Pickett. Mr. Pickett can be reached at (301) 415-1364.
1
. D vid A. Lochbaum '
t Your Petition has been referred to me pursuant to 10 CFR 2.206 of the Commission's regulations. As provided by Section 2.206, action will be taken on your request within a i
reasonable time. I have enclosed for your information a copy of the notice that is being filed with the Office of the Fhderal Register for pubi! cation. -
Sincerely, or Office of Nuclear Reactor Regulation
Enclosure:
FederalRegisterNotice cc w/ encl: See next page e
Y
, _ . , ...,..-----.i.--= ------" * ^ - * * ~*~ ~""' ~
.. . w
, m .. . - . . _ . _ . _ . _ . _ _ _ .
4 .
l L. Myers Perry Nuclear Power Plant, Unit's 1 and 2 j Centerior Service Company >
i cc: '
1 Mary E. O'Reilly James R. Wdliams i FirstEnergy- A290 Chief of Staff -
! 10 Center Road Ohio Emergency Management Agency
)- Perry, OH 44081 -
2855 West Dublin Granville Road
- Columbus, OH 43235-7150 l l Resident inspector's Office ,
U.S. Nuclear Regulatory Commission Mayor, Village of Perry l P.O. Box 331 4203 Harper Street Perry, OH 44081-0331 Perry, OH 44081 Regional Administrator, Region lli Radiological Health Program U.S. Nuclear Regulatory Commission Ohio Department of Health l 801 Warrenville Road P.O. Box 118 Lisle, IL 60532-4531 Columbus, OH 43266-0118 Sue Hiatt Ohio Environmental Protection OCRE Interim Representative Agency 8275 Munson DERR-Compliance Unit Mentor, OH 44060 ATTN: Mr. Zack A. Clayton P.O. Box 1049 Henry L. Hegrat Columbus, OH 43266-0149 Regulatory Affairs Manager Cleveland Electric liluminating Co. Chairman Perry Nuclear Power Plant Perry Township Board of Trustees P.O. Box 97, A210 3750 Center Road, Box 65 Perry, OH 44081 Peny, OH 44081 FirstEnergy Corporation State of Ohio Michael Beiting Public Utilities Commission )
Associate General Counsel East Broad Street 76 S. Main Columbus, OH 43266-0573 -
Akron,OH 44308 William R. Kanda, Jr., Plant Manager Mayor, Village of North Perry Cleveland Electric liluminating Co.
North Peny Village Hall Perry Nuclear Power Plant j 4778 Lockwood Road P.O. Box 97 SB306 i North Perry Village, OH 44081 Perry, OH 44081 )
Donna Owens, Director Ohio Department of Commerce Division ofIndustrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road
' P. O. Box 4009 Reynoldsburg, OH 43068-9009
7590-01-P U. S. NUCI FAR REGULATORY COMMISSION L
QQC)(ET NO. 50-440 LICENSE NO. NPF-58 l
THE CLEVELAND ELECTRIC ILLUMINATING COMPANY. ET AL RECElPT OF PETITION FOR DIRECTOR'S DECISION UNDER 10 CFR 2 208 Notice is hereby given that by Petition dated November 9,1998, David A. Lochbaum (Petitioner), acting on behalf of tim Union of Concemed Scientists (UCS), has requested that the U.S. Nuclear Regulatory Commission (NRC) take action with regard to the Perry Nuclear Power Plant, Unit No.1 (PNPP), operated by The Cleveland Electric illuminating Company and i
Centerior Service Company. Petitioner requests that enforcement action bei taken to require an I immediate shutdown of the PNPP, and that the facility remain shut down until all failed fuel l
assemblies are removed from the reactor core. As an alternate action, UCS also stated that following the requested shutdown, PNPP could be restarted after its design and licensing bases were updated to permit operation with failed fuel assemblies. Additionally, the Petition requested a public hearing to present new plant-specific information regarding the operation of PNPP, as well as to discuss a UCS report dated April 2,1998, entitled " Potential Nuciaar Safety Hazard / Reactor Operation With Failed Fuel Cladding."
As the basis for the request, the Petitioner cited the NRC's Weekly information Report for the week ending October 30,1998, that describes the apparent existence of two pin hole
. fuel leaks at the Perry facility, in the opinion of the Petitioner, operation with one or more failed fuel assemblies is not permitted by the Perry design and licensing bases. In addition, the Petitioner stated that by operating with possible failed fuel cladding, PNPP is violating its licensing basis for the radiation worker protection (as low as reasonably achievable [ALARA])'
program. The Petitioner referred to NRC Information Notice No. 87-39, " Control of Hot Particle OC 3 O aN D ~
,. e
2 Contamination at Nuclear Plants," which describes how continued operation with degraded fuel may elevate radiation exposure rates for plant employees.
The Petitioner further reasserted the UCS position that nuclear power plants operating with fuel cladding failures are potentially unsafe and are in violation of Federal regulations. In its April 1998 repcrt, the UCS stated that it has not been demonstrated that the effects from i
design-bases transients and accidents (i.e., hydrodynamic loads, fuel enthalpy changes, etc.)
prevent pre-existing fuel failures from propagating. Therefore, the Petitioner concluded that it I
was possible that "significantly more radioactive material will be released to the reactor coolant system during a transient or accident than that experienced during steady state operation." l I
The request is being treated pursuant to 10 CFR 2.206 of the Commission's regulations.
The request has been referred to the Director of the Office of Nuclear Reac'5r Regulation. As ;
provided by Section 2.206, appropriate action will be taken on this petition within a reasonable time. By letter dated December 16,1998, the Director denied Petitioner's request for enforcement action to require The Cleveland Electric illuminating Company to immediately shut down PNPP. In addition, the Director also extended an offer to the Petitioner fo[an informal public hearing at a date to be determined. A copy of the petition is available for inspection at the Commission's Public Document Room at 2120 L Street, N.W., Washington, D.C. 20555-0001.
1 FOR THE NUCLEAR REGULATORY COMMISSION a ue . ins, Dire or Office of Nuclear Reactor Regulation Dated at Rockville, Maryland, This 16thday of