Summary of 980910 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md Re Licensee Proposed Changes to Design & Licensing Basis to Containment Isolation Provisions for Feedwater System.List of Attendees Encl
ML20154J367
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/13/1998
From: Pickett D
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9810150220
Download: ML20154J367 (6)


Text

- ._-- - -.- . - - - - - -.- .-.- - .. - - _-. - --..

C

.m k p UNITED STATES s" Ij NUCLEAR REGULATORY COMMISSION

& WASHINGTON, D.C. 3088Ho01

%*****/ October 13, 1998 LICENSEE: Cleveland Electric illuminating Company FACILITY: Perry Nuclear Power Plant, Unit No.1 i

SUBJECT:

SUMMARY

OF SEPTEMBER 10,1998 MEETING ON FEEDWATER ISOLATION PROVISIONS 1

l l On September 10,1998, NRC staff met with representatives of Cleveland Electric illuminating l Company (CEI) in Rockville, Maryland. The purpose of the meeting was to discuss proposed changes to the design and licensing basis to the containment isolation provisions for the feedwater system. A list of the meeting participants is included as Enclosure 1. While there t

were no meeting handouts, the licensee provided an advance copy of their license amendment request dated September 9,1998 (PY-CEl/NRR-2322L). This document has been entered into the public document room under accession number 9809140325.

The license amendment request was not avai!sbie to the staff prior to the meeting. As indicated l

above, the licensee provided a copy of their submittal during the meeting. The meeting was

requested by the licensee in order to meet the technical reviewers, provide an explanation of the submittal, and to answer any staff questions. The licensee stressed the importance of this l submittal to support their seventh refueling outage (currently scheduled for April 1999) and requested staff approval prior to January 29,1999.

The license amendment request relates to hydrostatic (water) testing of containment isolation check valves in the feedwater system. Isolation provisions for the feedwater penetrations take credit for three isolation valves. Two piston lift check valves are located immediately inside and l outside of the containment penetration. A third, motor-operated gate valve is located further I upstream, outside of containment. The ::urrent licensing basis relies on a water seal provided ,

by the feedwater leakage control system (FWLCS). The FWLCS injects water between the two check valves and also between the outside check valve and gate valve. Due to the need for operator action to initiate this system and the time to fill the piping volume between the valves, .

the water seal will not be provided until approximately one hour following the postulated accident. In addition, for long-term isolation provisions for a postulated feedwater line break inside containment, reliance is placed upon the motor-operated gate valve to close.

The proposed technical specification change stipulates that water leakage from the feedwater motor-operated containment isolation valves will be added into the Primary Coolant Sources Outside of Containment Program, and therefore the feedwater check valves will not need to be included in the hydrostatic test program addressed by Surveillance Requirement 3.6.1.3.11.

The licensee proposes to add dual power supplies to the motor-operated containment isolation l valve and redirect FWLCS water to the gate valve bonnet and seat areas. The licensee stated that these changes would represent improvements to the currently approved containment isolation provisions.

Oq y+~"JT  : i

[

9810150220 981013 PDR ADOCK 05000440 P PDR ,

. . . . _ . _ - - - .=. __ . . .

2 The request was submitted pursuant to both 10 CFR 50.90 and 50.59. A significant portion of the meeting was devoted to understanding the current licensing basis for the feedwater penetrations and how the proposed changes represent an overall improvement to the existing isolation provisions. The staff noted that the licensing basis appeared unique in that 1) while credit was being taken for a water seal, it would take approximately one hour to provide this i

seal, and 2) long-term isolation provisions rely upon the closure of the motor-operated gate valves.

The staff acknowledged industry problems with leak testing of feedwater check valves for  !

boiling water reactors and indicated that the review would support the licensee's outage plans.

1 i

T%[ V' 2 wkM~

Douglas V. Pickett, Senior Project Manager Project Directorate 111-2 i Division of Reactor Projects lil/IV 1 Office of Nuclear Reactor Regulation )

Docket No. 50-440

Enclosure:

List of Meeting Participants j cc w/encls: See next page l

  • l
  • 2 October 13, 1098 The request was submitted pursuant to both 10 CFR 50.90 and 50.59. A significant portion of the meeting was devoted to understanding the current licensing basis for the feedwater penetrations and how the proposed changes represent an overall improvement to the existing isolation provisions. The staff noted that the licensing basis appeared unique in that 1) while credit was being taken for a water seal, it would take approximately one hour to provide this seal, and 2) long-term isolation provisions rely upon the closure of the motor-operated gate valves.

The staff acknowledged industry problems with leak testing of feedwater check valves for boiling water reactors and indicated that the review would support the licensee's outage plans. ,

Original signed by:

Douglas V. Pickett, Senior Project Manager Project Directorate Ill-2 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosure:

List of Meeting Participants cc w/encls: See next page DISTRIBUTION Hard Conv w/encls E-mail w/ Enc! 1 Docket File SCollins (SJC1) JKudrick EAdensam PD lil-2 Reading FMiraglia (FJM) EThrom PUBLIC THiltz CBerlinger GGrant, Rill BBoger GHolahan Hard Conv w/Enct i OGC ACRS DOCUMENT NAME: G:\ PERRY \MTG9_10. SUM Ta receive e copy of this document, indcate in the box: "c" = Copy without enclosures *E" = Copy with enclosures "N* = No copy 0FFICE PM:PDLLI-2o C- LA:PDIII-2 ( D:PDIII-2 C NAME DPicket f ' EBarnhill & SRichards #

DATE 10/13/98 10/4/98 10/13/98 10/ /98 10/ /98 0FFICIAL RECORD COPY

4 2 October 13, 1998 The request was submitted pursuant to both 10 CFR 50.90 and 50.59. A significant portion of

- the meeting was devoted to understanding the current licensing basis for the feedwater penetrations and how the proposed changes represent an overall improvement to the existing isolation provisions. The staff noted that the licensing basis appeared unique in that 1) while

' credit was being taken for a water seal, it would take approximately one hour to provide this seal, and 2) long-term isolation provisions rely upon the closure of the motor-operated gate valves.

The staff acknowledged industry problems with leak testing of feedwater check valves for boiling water reactors and indicated that the review would support the licensee's outage plans. ,

Original signed by:

Douglas V. Pickett, Senior Project Manager Project Directorate 111-2 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosure:

List of Meeting Participants cc w/encis: See next page DISTRIBUTION Hard Cooy w/encls E-mail w/ Encl 1 Docket File SCollins (SJC1) JKudrick EAdensam PD lll-2 Reading FMiraglia (FJM) EThrom PUBLIC THiltz CBerlinger GGrant, Rlli BBoger GHolahan Hard Conv w/ Encl 1 OGC ACRS

- DOCUMENT NAME: G:\ PERRY \MTG9_10. SUM Ta receive a copy of this document,indcate in the box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy 0FFICE PM:PDI_II-;?n l C- LA:PDIII-2 6 D:PDIII-2 C I4AME DPicketf ' EBarnhill & SRichards s 42-DATE 10/13/98 10/9/98- 10/13/98 10/ /98 10/ /98 0FFICIAL RECORD COPY o

i L. Myers Perry Nuclear Power Plant, Units 1 and 2 Centerior Service Company l

cc:

Mary E. O'Reilly James R. Williams FirstEnergy - A290 Chief of Staff 10 Center Road Ohio Emergency Management Agency

Perry, OH 44081 2855 West Dublin Granville Road Columbus, OH 43235-7150 Resident inspector's Office U.S. Nuclear Regulatory Commission Mayor, Village of Perry P.O. Box 331 4203 Harper Street Perry, OH 44081-0331 Perry, OH 44081 Regional Administrator, Region 111 . Radiological Health Program l

U.S. Nuclear Regulatory Commission Ohio Department of Health 801 Warrenville Road P.O. Box 118 Lisle, IL 60532-4531 Columbus, OH 43266-0118 Sue Hiatt Ohio Environmental Protection OCRE Interim Representative Agency 8275 Munson DERR-Compliance Unit

Mentor, OH 44060 ATTN
Mr. Zack A. Clayton .

l P.O. Box 1049 l Henry L. Hegrat Columbus, OH 43266-0149 l Regulatory Affairs Manager 1 l Cleveland Electric illuminating Co. Chairman  ;

Perry Nuclear Power Plant Perry Township Board of Trustees P.O. Box 97, A210 3750 Center Road, Box 65 Perry, OH 44081 Perry, OH 44081 FirstEnergy Corporation State of Ohio l Michael Beiting Public Utilities Commission

Associate General Counsel East Broad Street 76 S. Main Columbus, OH 43266-0573

! Akron, OH 44308 William R. Kanda, Jr., Plant Manager Mayor, Village of North Perry C!eveland Electric illuminating Co.

North Perry Village Hall Perry Nuclear Power Plant 4778 Lockwood Road P.O. Box 97, SB306 North Perry Village, OH 44081 Perry, OH 44081  ;

l l Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance i 6606 Tussing Road i P. O. Box 4009 Reynoldsburg, OH 43068-9009

. . - . - . . , - . . . ~ ~ . . - . . .. - - . _ _ . - . . - . . - . - . - . . - _ . . - - . . . . _ - . . - . .

l MEETING ATTENDEES NRC AND CLEVELAND ELECTRIC ILLUMINATING COMPANY FEEDWATER ISOLATION PROVISIONS i

SEPTEMBER 10,1998 CLEVELAND ELECTRIC ILLUMINATING CO.

Robert W. Schrauder i- Henry L. Hegrat Bradley S. Ferrell j Tom Shega l

l ECIENTECH - NUS l Dave Studley NBC Carl Berlinger.

Jack Kudrick Ed Throm -

Y.S. (John) Huang Doug Pickett l