Letter Sequence Meeting |
---|
|
|
MONTHYEARML20207N9071988-10-12012 October 1988 Summary of 881006 Meeting W/Licensee & GE Re Forthcoming Reload Submittal for Feb 1989 Reload.Attendees List & Nonproprietary Slides Presented by GE Outlining Scope of Reload Application to Be Submitted by Nov 1988 Encl Project stage: Meeting 1988-10-12
[Table View] |
Similar Documents at Perry |
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20217H1001999-10-13013 October 1999 Summary of 990930 Meeting with Util in Rockville,Md Re Proposed Five Percent Power Uprate for Plant,Unit 1.List of Meeting Participants & Licensee Meeting Handout Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20206P0831999-05-12012 May 1999 Summary of 990428 Meeting with Firstenergy Nuclear Operating Co & Duquesne Light Co in Rockville,Maryland Re Proposed Asset Transfer Between Firstenergy Corp & Dl & Resulting 10CFR50.80 License Transfer of Dl Ownership Interest ML20206D6031999-04-30030 April 1999 Summary of 990318 Meeting with Firstenergy Nuclear Operating Co in Rockville,Maryland Re Review Schedule & Content of Proposed QA Topical Rept for Both Davis-Besse & Perry Facilities.List of Meeting Attendees Encl ML20205D4831999-03-25025 March 1999 Summary of 990222 Public Hearing with Util Re Gathering Addl Info Related to Two Petitions Filed Pursuant to 10CFR2.206 by Ucs Re Operation of River Bend Station & Perry Nuclear Power Plant.List of Attendees & Transcript of Hearing Encl ML20198S3061999-01-0505 January 1999 Summary of 981204 Meeting with Util in Rockville,Md to Discuss Proposed Changes to Design & Licensing Basis of Containment Isolation Provisions for Feedwater Sys ML20198D5801998-12-15015 December 1998 Summary of 981119 Meeting with Util in Rockville,Md to Discuss Proposed Changes to Design & Licensing Basis of Containment Isolation Provisions for Feedwater Sys ML20202D3521998-12-0909 December 1998 Summary of 981123 Petition Review Board Meeting Re 2.206 Petition on Perry Unit 1,submitted on 981109 by Ucs.Meeting Attendees Listed ML20155H3801998-10-29029 October 1998 Summary of 980915 Meeting with Util & Contractor Polestar Applied Technology,Inc in Rockville,Md Re Revised Accident Source Term for Perry Pilot Plant Review.List of Meeting Participants & Nonproprietary Handouts Encl ML20154J3671998-10-13013 October 1998 Summary of 980910 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md Re Licensee Proposed Changes to Design & Licensing Basis to Containment Isolation Provisions for Feedwater System.List of Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20199L2071997-11-24024 November 1997 Trip Rept of 971006 Visit to Perry Site to Gather Info on New & Unique Strainer Design Installed at Perry During Most Recent Outage ML20141E7701997-05-14014 May 1997 Summary of 970508 Meeting W/Cei in Rockville,Md Re Priorities & Schedules of Licensing Issues for Plant,Unit 1. List of Meeting Attendees & Meeting Handout Encl ML20140H4881997-05-0707 May 1997 Provides Summary of 970401 Telcon Between NRC & BWROG Re Topical Rept NEDC-31858P,Rev 2, BWROG Rept for Increasing MSIV Leakage Rate Limits & Elimination of Leakage Control Sys ML20138D9441997-04-23023 April 1997 Summary of 970324 Meeting W/Licensee in Rockville,Md Re ECCS suction-strainer Program for Perry Npp,Unit 1.List of Attendees & Viewgraphs Encl ML20134A9621997-01-22022 January 1997 Summary of 961204 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Centerior Energy Corporation & Ohio Edison Company.List of Attendees & Info Handouts Encl ML20147A7261997-01-22022 January 1997 Summary of 960910 Meeting W/Util in Rockville,Md to Discuss Revised Eal.List of Attendees Encl ML20062J8701993-11-0808 November 1993 Summary of 931028 Meeting W/Licensee in Rockville,Md Re Licensee Presentation of Summary of Plant Course of Action Plan to NRC Mgt ML20057F1271993-10-0505 October 1993 Summary of 930902 Meeting W/Util in Rockville,Md Re NRC 930405 Safety Evaluation of Rev 3 to IST Program.List of Attendees Encl ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246B5161989-04-28028 April 1989 Summary of 890419 Operating Reactors Events Meeting 89-16. List of Attendees & Handouts Encl ML20206D7761988-11-0808 November 1988 Summary of 881102 Meeting W/Util in Rockville,Md Re Facility Operating Performance.External Performance Assessments, Performance Indicators,Mgt Initiatives & Feedback Effectivness Discussed.Agenda & Viewgraphs Encl ML20207N9071988-10-12012 October 1988 Summary of 881006 Meeting W/Licensee & GE Re Forthcoming Reload Submittal for Feb 1989 Reload.Attendees List & Nonproprietary Slides Presented by GE Outlining Scope of Reload Application to Be Submitted by Nov 1988 Encl ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20150D7171988-07-0707 July 1988 Summary of Operating Reactors Events Meeting 88-26 on 880628 ML20153B0281988-06-22022 June 1988 Summary of Operating Reactors Events Meeting 88-25 on 880621.List of Attendees,Discussion of Significant Elements of Events & Summary of Reactor Scrams Encl ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20154A8991988-05-0404 May 1988 Summary of Operating Reactors Events 88-18 Meeting on 880503 Re Events Which Occurred Since 880426 Meeting.List of Attendees & Viewgraphs Encl ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20239A0231987-09-10010 September 1987 Summary of Operating Reactor Events Meeting 87-30 on 870908, Re Briefing Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870825 Meeting.Attendees List,Summary of Reactor Scrams & Viewgraphs Encl ML20207A5221987-05-15015 May 1987 Summary of Operating Reactors Event Meeting 87-13 on 870507 Re Events Which Occurred Since 870428.List of Attendees, Events Discussed & Significant Elements of Events & Summary of Events Presented Encl ML20204E5421987-03-19019 March 1987 Summary of Operating Reactors Events Meeting 87-06 on 870309.List of Attendees & Events Discussed & Significant Elements of Events Presented Encl ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20215D0631986-12-11011 December 1986 Summary of Operating Reactor Events Meeting 86-42 on 861201. List of Attendees & Viewgraphs Re Significant Elements of Events Discussed Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20215D9171986-10-0606 October 1986 Summary of 860929 Operating Reactors Events Meeting 86-34 Re Events Since Last Meeting on 860922.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Viewgraphs Encl ML20210C4211986-09-11011 September 1986 Summary of Operating Reactors Events Meeting 86-31 on 860908.Lists of Attendees,Events & Significant Elements & Assignments Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20211P1361986-07-16016 July 1986 Summary of 860707 Operating Reactor Events Meeting 86-23 W/ Div Directors & Representatives Re Events Since Last Meeting on 860630.Notification of Inability to Meet Assigned Target Completion Dates for Actions Requested.Viewgraphs Encl ML20199L5241986-06-30030 June 1986 Summary of 860611 Meeting W/Util,Usgs,Weston Geophysical, Shaw-Pittman Assoc,Geosciences Svcs,Univ of South Carolina, Gilbert Commonwealth Assoc & Nts Engineering Re Completion of Earthquake Confirmatory Items in Sser 9 ML20199L6471986-06-26026 June 1986 Summary of Operating Reactors Events Meeting 86-21 on 860623.Attendance List & Viewgraphs Encl ML20198D5391986-05-12012 May 1986 Summary of 860430 Meeting W/Util,Nts Engineering,Usgs, Gilbert Commonwealth,Weston Geophysical,Geoscience Svcs & Univ of South Carolina Re Earthquake Confirmatory Work Required in Sser 9.Attendance List Encl 1999-08-04
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20217H1001999-10-13013 October 1999 Summary of 990930 Meeting with Util in Rockville,Md Re Proposed Five Percent Power Uprate for Plant,Unit 1.List of Meeting Participants & Licensee Meeting Handout Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20206P0831999-05-12012 May 1999 Summary of 990428 Meeting with Firstenergy Nuclear Operating Co & Duquesne Light Co in Rockville,Maryland Re Proposed Asset Transfer Between Firstenergy Corp & Dl & Resulting 10CFR50.80 License Transfer of Dl Ownership Interest ML20206D6031999-04-30030 April 1999 Summary of 990318 Meeting with Firstenergy Nuclear Operating Co in Rockville,Maryland Re Review Schedule & Content of Proposed QA Topical Rept for Both Davis-Besse & Perry Facilities.List of Meeting Attendees Encl ML20205D4831999-03-25025 March 1999 Summary of 990222 Public Hearing with Util Re Gathering Addl Info Related to Two Petitions Filed Pursuant to 10CFR2.206 by Ucs Re Operation of River Bend Station & Perry Nuclear Power Plant.List of Attendees & Transcript of Hearing Encl ML20198S3061999-01-0505 January 1999 Summary of 981204 Meeting with Util in Rockville,Md to Discuss Proposed Changes to Design & Licensing Basis of Containment Isolation Provisions for Feedwater Sys ML20198D5801998-12-15015 December 1998 Summary of 981119 Meeting with Util in Rockville,Md to Discuss Proposed Changes to Design & Licensing Basis of Containment Isolation Provisions for Feedwater Sys ML20202D3521998-12-0909 December 1998 Summary of 981123 Petition Review Board Meeting Re 2.206 Petition on Perry Unit 1,submitted on 981109 by Ucs.Meeting Attendees Listed ML20155H3801998-10-29029 October 1998 Summary of 980915 Meeting with Util & Contractor Polestar Applied Technology,Inc in Rockville,Md Re Revised Accident Source Term for Perry Pilot Plant Review.List of Meeting Participants & Nonproprietary Handouts Encl ML20154J3671998-10-13013 October 1998 Summary of 980910 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md Re Licensee Proposed Changes to Design & Licensing Basis to Containment Isolation Provisions for Feedwater System.List of Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20141E7701997-05-14014 May 1997 Summary of 970508 Meeting W/Cei in Rockville,Md Re Priorities & Schedules of Licensing Issues for Plant,Unit 1. List of Meeting Attendees & Meeting Handout Encl ML20140H4881997-05-0707 May 1997 Provides Summary of 970401 Telcon Between NRC & BWROG Re Topical Rept NEDC-31858P,Rev 2, BWROG Rept for Increasing MSIV Leakage Rate Limits & Elimination of Leakage Control Sys ML20138D9441997-04-23023 April 1997 Summary of 970324 Meeting W/Licensee in Rockville,Md Re ECCS suction-strainer Program for Perry Npp,Unit 1.List of Attendees & Viewgraphs Encl ML20134A9621997-01-22022 January 1997 Summary of 961204 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Centerior Energy Corporation & Ohio Edison Company.List of Attendees & Info Handouts Encl ML20147A7261997-01-22022 January 1997 Summary of 960910 Meeting W/Util in Rockville,Md to Discuss Revised Eal.List of Attendees Encl ML20062J8701993-11-0808 November 1993 Summary of 931028 Meeting W/Licensee in Rockville,Md Re Licensee Presentation of Summary of Plant Course of Action Plan to NRC Mgt ML20057F1271993-10-0505 October 1993 Summary of 930902 Meeting W/Util in Rockville,Md Re NRC 930405 Safety Evaluation of Rev 3 to IST Program.List of Attendees Encl ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246B5161989-04-28028 April 1989 Summary of 890419 Operating Reactors Events Meeting 89-16. List of Attendees & Handouts Encl ML20206D7761988-11-0808 November 1988 Summary of 881102 Meeting W/Util in Rockville,Md Re Facility Operating Performance.External Performance Assessments, Performance Indicators,Mgt Initiatives & Feedback Effectivness Discussed.Agenda & Viewgraphs Encl ML20207N9071988-10-12012 October 1988 Summary of 881006 Meeting W/Licensee & GE Re Forthcoming Reload Submittal for Feb 1989 Reload.Attendees List & Nonproprietary Slides Presented by GE Outlining Scope of Reload Application to Be Submitted by Nov 1988 Encl ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20150D7171988-07-0707 July 1988 Summary of Operating Reactors Events Meeting 88-26 on 880628 ML20153B0281988-06-22022 June 1988 Summary of Operating Reactors Events Meeting 88-25 on 880621.List of Attendees,Discussion of Significant Elements of Events & Summary of Reactor Scrams Encl ML20154A8991988-05-0404 May 1988 Summary of Operating Reactors Events 88-18 Meeting on 880503 Re Events Which Occurred Since 880426 Meeting.List of Attendees & Viewgraphs Encl ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20239A0231987-09-10010 September 1987 Summary of Operating Reactor Events Meeting 87-30 on 870908, Re Briefing Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870825 Meeting.Attendees List,Summary of Reactor Scrams & Viewgraphs Encl ML20207A5221987-05-15015 May 1987 Summary of Operating Reactors Event Meeting 87-13 on 870507 Re Events Which Occurred Since 870428.List of Attendees, Events Discussed & Significant Elements of Events & Summary of Events Presented Encl ML20204E5421987-03-19019 March 1987 Summary of Operating Reactors Events Meeting 87-06 on 870309.List of Attendees & Events Discussed & Significant Elements of Events Presented Encl ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20215D0631986-12-11011 December 1986 Summary of Operating Reactor Events Meeting 86-42 on 861201. List of Attendees & Viewgraphs Re Significant Elements of Events Discussed Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20215D9171986-10-0606 October 1986 Summary of 860929 Operating Reactors Events Meeting 86-34 Re Events Since Last Meeting on 860922.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Viewgraphs Encl ML20210C4211986-09-11011 September 1986 Summary of Operating Reactors Events Meeting 86-31 on 860908.Lists of Attendees,Events & Significant Elements & Assignments Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20211P1361986-07-16016 July 1986 Summary of 860707 Operating Reactor Events Meeting 86-23 W/ Div Directors & Representatives Re Events Since Last Meeting on 860630.Notification of Inability to Meet Assigned Target Completion Dates for Actions Requested.Viewgraphs Encl ML20199L5241986-06-30030 June 1986 Summary of 860611 Meeting W/Util,Usgs,Weston Geophysical, Shaw-Pittman Assoc,Geosciences Svcs,Univ of South Carolina, Gilbert Commonwealth Assoc & Nts Engineering Re Completion of Earthquake Confirmatory Items in Sser 9 ML20199L6471986-06-26026 June 1986 Summary of Operating Reactors Events Meeting 86-21 on 860623.Attendance List & Viewgraphs Encl ML20198D5391986-05-12012 May 1986 Summary of 860430 Meeting W/Util,Nts Engineering,Usgs, Gilbert Commonwealth,Weston Geophysical,Geoscience Svcs & Univ of South Carolina Re Earthquake Confirmatory Work Required in Sser 9.Attendance List Encl ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20204A1371986-05-0505 May 1986 Summary of 860418 Meetings W/Usgs & Util Re Progress on Geology/Seismology Confirmatory Issues for Plants.Attendance List Encl 1999-08-04
[Table view] |
Text
s i 4
. October 12, 1988 !
i ;
l Docket No. 50-440 PDIII-3 r/f " JHannon LICENSEE: The Cleveland Electric Illuminating Company TColburn OGC-WF1 l i EJordan BGrimes t FACILITY: Perry Nuclear Power Plant, Unit No.1 ACRS(10) JClifford I i TCollins WPaulson l
SUBJECT:
MEETING SU MARY TAC NO. 69525 WHodges !
l '
I On October Electric 6,1988, Illuminating a meeting Company w(as held licensees), between General representatives Electric Company (GE) andof the Cleveland [
, the staff to discuss the forthcoming reload submittal for the February 1989 t
- Perry Unit I reload. Enclosure 1 contains a list of attendees. Enclosure 2 [
j contains a copy of non-proprietary slides presented by GE which outline the i scope cf the reload application expected to be received from the licensees in l
< November 1988. The licensees and GE have indicated that the reload application l 1 will rely upon pre-approved fuel designs using pre-approved analysis methods. .
l The application will contain some cycle-specific Technical Specification !
j changes. The licensees also indicated that any other outage-dependent license .
j amendment applications for Perry Unit I would be submitted separately in order [
] to minimize complications or confusion with the reload package review. ;
I i The staff indicated, based upon the licensees' and GE's presentation, that they should be able to complete review of the licensees' expected reload t j application consistent with the scheduled reload. {
5 !
!s/ l l
l Timothy G. Colburn, Project Manager l 1
Project Directorate III-3 Nvision of Reactor Projects - !!!, .
l IV, V and Special Projects J
Enclosures:
l
- As stated [
I
}
j cc: See next page % Q' l
k
- Office: LA/PD111-3 PN/PDI!!-3 SRXBMyd PD y /PDI!! p e_
- Surname
- PKeeut'zer TColburn/tg WHodges JHannon , t
- Date: /o /a, /88 /O //A/88 ft) /[k/88 ,*// /88 J :
i 1 f
! l I i
! t i i i P ss1019c461gg@$4o DR ADOCK PDC p/
j /// [
1
Mr. Alvin Kaplan Perry Nuclear Power Plant The Cleveland Electric- Unit 1 Illuminating Company cc:
Shaw, Pittman, Potts & Trowbridge Mr. James W. Harris, Director 2300 N Street, N.W. Division of Power Generation Washington,D.C. 20037 Ohio Department of Industrial Relations David E. Burke P.O. Box 825 The Cleveland Electric Columbus, Ohio 43216 Illuminating Company P.O. Box 5000 . The Honorable Lawrence Logan Cieveland, Ohio 44101 Mayor, Village of Perry 4203 Harper Street Resident Inspector's Office Perry, Ohio 44081 U.S. Nuclear Regulatory Commission Parmly at Center Road The Honorable Robert V. Orosz Perry Ohio 44081 Mayor, Village of North Perry North Perry Village Hall Regional Administrator, Region Ill 4778 Lockwood Road U.S. Nuclear Regulatory Comission North Perry Village, Ohio 44081 799 Roosevelt Road Glen Ellyn Illinois 60137 Attorney General Department of Attorney General Frank P. Weiss. Esq. 30 East Broad Street Assistant Prosecuting Attorney Columbus, Ohio 43216 105 Main Street Lake County Administration Center Radiological Health Program Painesville, Ohio 44077 Chio Departmeit of Health 1224 Kinnear Road Ms. Sue Hiatt Columbus, Ohio 43212 OCRE Interim Representativa 8275 Munson Ohio Environmental Protection Mentor, Ohio 44060 Agency 361 East Broad Street Terry J. Lodge, Esq. Columbus, Ohio 43266-0558 618 N. Michigan Street Suite 105 Mr. Phillip S. Haskell. Chairman Toledo, Ohio 43624 Perry Township Board of Trustees Box 65 John G. Cardinal. Esq. 4171 Main Street Prosecuting Attorney Perry. Ohio 44081 Ashtabula County Courthouse Jefferson, Ohio 44047 State of Ohio Public Utilities Cossnission Robert A. Newkirk 180 East Broad Street Cleveland Electric Columbus, Ohio 4326%0573 Illuminating Company Perry Nuclear Power Plant Michael D. Lyster P. O. Box 97 E-210 Cleveland Electric Perry, Ohio 44081 Illuminating Company Perry Nuclear Power Plant P. O. Box 97 SB306 Perry, Ohio 44081
ENCLOSURE 1 I
PERRY UNIT 1 FEB 89 RELOAD MTG 10/6/88 NAME ORGANIZATION I Tim Colburn NRR/PD3-3 Tim Collins NRR J. S. Chernley GE/LACS R. F. Parr GE i R. A. Loeffler CE!/ Licensing i
- 8. S. Ferrell
R. A. Newkirk CE!/ Licensing ;
- 8. M. Burmeister GSU/ Licensing W. A. Paulson NRC/NRP,/PD-4 i r
I i
1 I
i i
l h i t
) !
i r
l l
$ i i
t i f I
! l i
l i'
e ENCLOSURE 2 l
l t
4
. RELOAD FUEL LICENSING FOR l I
PERRY NUCLEAR POWER PLANT UNIT 1
! l l
) OCTOBER 6, 1988 ,
b l
l l
i i
)
l l
i j
GE FUEL LICENSING IS BASED ON:
i 0 PRE-APPROVED FUEL DESIGNS !
0 PRE-APPROVED ANALYSIS METHODS
, l 1
i l
0 PRE-APPROVED GENERIC RESULTS >
?
! i l I O MINIMAL CYCLE SPECIFIC REVIEW !
t t
i !
) >
1 l 1
4 l
)
4 l
3 l
( l 1
i I
s I
! l i
l 1
l GE FUEL LICENSING CORNERSTONE l
GESTAR-II
! O SINGL,E REFERENCE DOCUMENT i t
t i O BASIS FOR ALL FUEL LICENSING ;
l 1 0 CONTAINS RESULTS OF GENERIC REVIEWS i j 0 FULLY APPROVED BY USNRC
- O HAINTAINED UP-TO-DATE AS GE CONTROLLED i i DOCUMENT l
- F 1
j l
l i
i l
GESTAR-II CONSISTS OF 0 STANDARDIZED BASE DOCUMENT 0 STANDARDIZED COUNTRY SPECIFIC DOCUMENT 0 PLANT SPECIFIC SUBMITTAL 9
"s u .__--..-- ,_--____mC d' _bm_ =- A.C__w_- 4. .M 3--4-----ha-.m----. 4 -- --- - A E a- -m - --.me._
- - - - . - . . _--, Ac__n ..--
1 .6 GESTAR-II LICENSING PRE-APPROVED BASE COUNTRY - CYCLE REPORT SUPPLEMENT SPECIFIC 0 FUEL MECHANICAL 0 REACTOR LIMITS 0 CORE LOADING DESIGN METHODS PATTERN 0 NUCLEAR MODELS 0 BOUNDING ANALYSES 0 CYCLE-SPECIFIC ANALYSES RESULTS 0 THERMAL-HYDRAULIC 0 COUNTRY SPECIFIC MODELS REQUIREMENTS 0 FS*,R CROSS 0 PLANT UNIQUE REFERENCE INFORMATION O IMPACT OF PLANT OPTIONS J
e L
i
!, GESTAR-II APPLICATIONS l I
O REFERENCE IN FSAR/ RELOAD SUBMITTALS O PROVIDES FOR CONTROLLED CHANGES I
O PROVIDES BASIS FOR ELIMINATING RELOAD
! SUBMITTALS PER 10CFR50.59 :
O FACILITATES FSAR UPDATES ,
l
{
i l t l !
FUEL LICENSING STANDARDIZATION ,
ACCOMPLISHED l l
i !
3 I i
! I i l t
I, i
GESTAR-II :
APPROVED FOR REFERENCING BY NRC 0 ONLY COMPREHENSIVE DOCUMENT FOR BWR FUEL ,
0 ELIMINATES REPETITIVE NRC REVIEW O REDUCES NRC WORKLOAD !
1 1
0 APPROVED CURRENT FUEL AND CORE ANALYSIS METHODS
):
0 INDEPENDENT OF ONG0ING GENERIC REVIEWS !
j 0 MAINTAINED AS AN APPROVED UPDATED DOCUMENT l I !
RELOAD FUEL LICENSING SIMPLIFIED l
r l
- l i
FUEL DESIGNS t i
1 0 ALL 8X8 DESIGNS IN GESTAR-II i
- t G NEW DESIGN REVIEW SIMPLIFIED l l
l -
REVIEWED ON GESTAR-II DOCKET :
PRE-APPROVED HETHODS AND CRITERIA !
1 1
l t
l i
t 1
i
! \
i
! l I
! l l
l l
! I i
i
\
l I
l
--, -- _ m 4 9
'O I
APPLICATION OF NEW METHODS t
O APPLIED ONLY AFTER GENERIC APPROVAL i
k 0 INCORPORATED INTO GESTAR-II F
l 4
i t i I I
l l l
) i t
4 i
r 1
t
- -- . = _
og i
STANDARD UTILITY RELOAD LICENSING FUEL DESIGN AND ANALYSIS MODELS PRE-APPROVED IN GESTAR-II CYCLE SPECIFIC VALUES IN SUPPLEMENTAL RELOAD SUBMITTAL '
0 TYPICALLY SEND TO NRC 3-6 MONTHS BEFORE STARTUP ',
0 NO SUBMITTAL POSSIBLE (10CFR50.59) 0 INITIAL APPLICATION REQUIRES TECHNICAL SPECIFICATION CHANGE I
NO PROBLEMS WITH RELOAD LICENSING t
RELOAD WITHOUT NRC SUBMITTALS 0 BASED ON 10CFR50.59 0 FUEL , DESIGN AND MODELS APPROVED IN GESTAR-II 0 NO UNREVIEWED SAFETY QUESTION 0 NO NRC SUBMITTAL REQUIRED IF TECHNICAL SPECIFICATIONS DO NOT CHANGE i
OPTIMUM FUEL LICENSING SIMPLIFICATION l
l
4 FSAR UPDATES 0 WIDE RANGE OF OPTIONS AVAILABLE O MINIMUM TO MAXIMUM USE OF GESTAR-II 0 UPDATING REDUCED BY MAXIMUM USE OF GESTAR-II GESTAR-II CAN HINIMIZE FSAR UPDATES l
l
,--....-.----,_,-------..,__,_,,-,-..,--.-_-_,,,._,_.,.___----_--,,-,-g_ _ , - , . . - - - - - - - -
D PERRY 1 RELOAD 1 LICENSING BASIS
RELOAD 1 BASIS 0 GE8X8EB FUEL DESIGN 0 GESTR THERMAL - MECHANICAL ANALYSIS 0 GEMINI PHYSICS ANALYSES O GENERIC SLMCPR ANALYSIS .
O GEMINI ODYN ANALYSES (OPTION A) ,
0 3-D SIMULATOR LOFH 0 VERIFY BWR/6 RWE i
0 0DYN PRESSURIZATION COMPLIANCE 0 GENERIC STABILITY BASIS 0 B0VHDING CRDA 0 SAFE /REFLOOD LOCA 0 ELIMINATED FLE l
4 GE8X8EB FUEL DESIGN e
GE8X8EB FUEL DESIGN APPROVED BY USNRC 1985 0 INCORPORATED INTO GESTAR-II REV 8 0 INCLUDED IN MANY PLANT RELOADS 0 REQUIRES SURVEILLANCE OF LEAD DISCHARGE BUNDLES 0 PERRY IS NOT A LEAD PLANT IMPROVED DESIGN FEATURES
- 0 BARRIER OPTION INCLUDED IN PERRY INITIAL CORE 0 HIGHER PREPRESSURIZATION AND BUNDLE ENRICHMENTS ALLOWS HIGHER BURNUPS O AXIAL ZONED GAD 0LINIA INCREASES MARGINS AND SIMPLIFIES OPERATION i
l i
l b
-=y,~e,e----n - . . ,- - - - _,,,--------,ww-----me--,, - , , ~ - - . - - --wn,.,.,-.--e,,-----,-- _ ,,,y---ww - e--- <-,-------w -
A SYSTEM OF NEW METHODS Pressure ^
Transients Thermal Fuel R Hydraulics Behavior Best Estimate Models Loss of Core Coolant Physics Lattice Physics O
EVALUATION MODELS 0 PHYSICALLY CONSISTENT BEST ESTIMATE O STATE.-OF-THE-ART 0 SUPPORTED BY TEST /0PERATING DATA 0 STATISTICAL CONSIDERATION OF UNCERTAINTIES i
l
.c NEW LICENSING MODELS SYSTEM OF NEW METHODS 0 GESTR-MECHANICAL FUEL DESIGN MODEL 0 GEMINI PHYSICS MODELS 0 GEXL-PLUS THERMAL CORRELATION 0 GEMINI ODYN TRANSIENT MODEL 0 GESTR-SAFER ECCS ANALYSIS H0 DEL ALL MODELS APPROVED ALL APPLICATIONS APPROVED i
GESTR-MECHANICAL INCLUDED IN GESTAR-II REVISION 7 GEMINI AND GEST R-SAFER MODELS INCORPORATED INTO l REVISION 8 GEXL-PLUS WILL Bi IN REVISION 9 FIRST FOUR METHODS WILL BE USED IN PERRY 1 RELOAD 1
GESTR-MECHANICAL SIGNIFICANT MODEL IMPROVEMENT 0 GAP CONDUCTANCE O FISSION GAS RELEASE O CLADDING EXPANSION /DISPLACEM'.NT 0 FUEL EXPANSION / DISPLACEMENT l
0 INTERNAL PRESSURE 0 ANALYTICAL METHOD BASED ON SIGNIFICANT IN-REACTOR /00T-REACTOR TEST DATA MODEL APPROVED BY USNRC 3/82
9 e9 e
GEMINI PHYSICS 0 IMPROVES PREDICTION OF GADOLINIA BURNUP O IMPROVES PREDICTION OF POWER SHAPES AND REACTIVITY MARGINS AT EXTENDED BURNUP l 0 FULLY INTEGRATED METHODS APPROVED BY USNRC 1
l \
l l
I l
.e MCPR SAFETY LIMIT :
0 GENERIC BOUNDING STATISTICAL. ANALYSIS DOCUMENTED IN GESTAR-II US SUPPLEMENT SECTION 2.1 ,
O LIMIT FOR GE8X8EB, S-LATTICE RELOAD CORE IS 1.07 INITIAL CORE WAS 1.06
! l 0 NO CHANGE DUE TO GEXL-PLUS CORRELATION ;
1 l
l i 0 FULLY APPROVED BY USNRC !
l l
f
GEXL-PLUS CORRELATION 0 NEW THERMAL ANALYSES CORRELATION FOR P/BP8X8R AND GE8X8E/EB FUELS 0 ADDS TERMS TO ACCOUNT FOR AXIAL FLUX SHAPE O LITTLE EFFECT ON TRANSIENT ANALYSIS 0 APPROVE BY USNRC MARCH 1988 0 REQUIRES T.S. CHANGE OF MCPR p I i
i L
ANALYZED TRANSIENTS 0 LIMITING EVENTS DETERMINED FROM FSAR SENSITIVITY STUDY 0 EVENTS TO BE ANALYZED GIVEN IN GESTAR-II US SUPPLEMENT SECTION 2.2 HOST LIMITING OF TT OR LR W/0 BP LOSS OF FEEDWATER HEATING FEEDWATER CONTROLLER FAILURE (MAX.
DEMAND)
CONTROL R0D WITHDRAWAL ERROR PRESSURE REGULATOR DOWNSCALE FAILURE 0 LIMITING POINT IN POWER / FLOW MAP ANALYZED 0 POWER C0ASTDOWN GENERICALLY APPROVED GIVEN IN GESTAR-II US SUPPLEMENT SECTION 2.2
I ODYN TRANSIENT MODEL AND APPLICATION INCORPORATES O APPROVED GESTR-MECHANICAL 0 APPROVED GEMINI PHYSICS 0 MODEL CHANGES IMPROVED PREDICTION ACCURACY l O CHANGES MODEL UNCERTAINTY FOR MCPR OPERATING LIMIT i
0 REDUCES MCPR OPERATING LIMITS I
USED FOR PRESSURIZATION EVENTS ,
l l
l
LOSS OF FEEDWATER HEATING ANALYSIS 0 ANALYZED USING GEMINI PHYSICS 3-D BWR SIMULATOR MODEL 0 USE OF 3-D SIMULATOR APPROVED BY USNRC IN GESTAR-II REV. 2 0 GEMINI PHYSICS INCORPORATED INTO GESTAR-II :
REV. 8 ,
i i
l 1
ROD WITHDRAWAL ERROR ANALYSIS O GENERIC STATISTICAL FSAR ANALYSIS FOR BWR/6 PLANTS O ANALYSIS RESULTS WILL BE VERIFIED OR PLANT SPECIFIC RESULTS REPORTED ,
i ll I a I
i i
. I i
P e e
PRESSURIZATION COMPLIANCE O ADEQUACY OF PRESSURE RELIEF SYSTEM DEMONSTRATED BY HSIV CLOSURE ON FLUX SIGNAL '
SCRAM 0 GENESIS ODYN ANALYSIS BASIS USED GEMINI ODYN DID NOT IMPACT THIS EVENT 0 DOCUMENTED IN GESTAR-II US SUPPLEMENT SECTION 2.3 0 RESULTS MUST NOT EXCEED 1375 PSIG LIMIT
STABILITY COMPLIANCE O DEMONSTRATED ON GENERIC BASIS COMPLIANCE WITH 10CFR50 APP A GDC 12 INCORPORATE SIL 380 INTO TECH SPECS, OR DEMONSTRATE DECAY RATIO <0.8 a
0 APPROVED BY USNRC 4/85 0 DOCUMENTED IN GESTAR-II US SUPPLEMENT .
SECTION 2.4 .
O BWROG ANALYZING EFFECTS OF LA SALLE INCIDENT I 0 NO FURTHER ACTIONS REQUIRED AT THIS TIME l
i L
I L
t
.4 -.
6 CONTROL ROD DROP ACCIDENT 0 BOUNDING ANALYSIS DOCUMENTED FOR PLANTS WITH BPWS EASILY MEETS 280 CAL /GM LIMIT l 0 GESTAR-II US SUPPLEMENT SECTION 2.5.1 l
0 PERRY HAS BPWS i
t l
l i
b i
, l l
s
I e
LOSS OF COOLANT ACCIDENT ANALYSIS 0 ANALYTICAL BASIS SAME AS FOR FSAR ,
HIGHLY CONSERVATIVE O BASIS ALSO DOCUMENTED IN,GESTAR-II US SUPPLEMENT SECTION 2.5.2 i
0 MAPLHGRs FOR RELOAD FUEL IN RELOAD SUBMITTAL l
0 ALL REQUIRED LIMITS WILL BE MET FOR RELOAD 1 i
l I
- i
._. _ __ _ _ _ . - - _ _ _ _ _ _. __ O
FUEL LOADING ERROR ;
0 FLE ANALYSIS REQUIREMENT ELIMINATED FOR BWR/6 PLANT. RELOADS 0 MISLOCATED BUNDLE LOADING ERROR FOR ALL RELOAD CORES ELIMINATED BASED ON DATA FROM .
PA3T RELOADS I
! i 0 MISORIENTED BUNDLE LOADING ERROR IS NOT PERFORMED FOR S-LATTICE CORES BECAUSE BUNDLE i SYMMETRY RESULTS IN INSIGNIFICANT CHANGE IN '
MCPR l l
0 DOCUMENTED IN GESTAR-II US SUPPLEMENT SECTION 2.5.4 .l i
l l
I PERRY 1 RELOAD 1 ,
l O ALL FUEL DESIGNS APPROVED BY USNRC ;
O ANALYSES PERFORMED WITH HETHODS FULLY 4
APPROVED BY USNRC O ALL ANALYSES RESULTS HEET CRITERIA APPROVED BY USNRC 0 N0 UNREVIEWED SAFETY ISSUES 0 N0 SIGNIFICANT SAFETY HAZARDS 1
e i
4 i
4
_._,_.--g~-,. . - . . -