NUCLEAR REGULATORY COMMISSION WASHINoToN, D.C. 2006H001
'% * * * * * [
May 7, 1997 Mr. Kevin P. Donovan, Chairman BWR Owners' Group c/o Centerior Energy Perry Nuclear Plant, Mail Code A210 10 Center Road Perry, OH 44081
SUBJECT:
SUMMARY
OF APRIL 1, 1997, TELECONFERENCE BETWEEN THE NUCLEAR REGULATORY COMMISSION (NRC) AND BWR OWNERS' GROUP (BWROG) REGARDING THE TOPICAL REPORT NEDC-31858P REVISION 2, "BWROG REPORT FOR INCREASING MSIV LEAKAGE RATE LIMITS AND ELIMINATION OF LEAKAGE CONTROL SYSTEMS" (TAC N0. M87911) i
Dear Mr. Donovan:
On April 1,1997, the staff held a teleconference (telecon) regarding the proposed Topical Report NEDC-31858P, Revision 2, "BWROG Report for Increasing
[ Main Steam Isolation Valve] MSIV Leakage Rate Limits and Elimination of Leakage Control Systems (LCS)" with representatives of BWROG.
The purpose of the telecon was for the NRC staff to explain, in detail, specific questions related to the earthquake experience data to BWR0G representatives.
These questions were first raised via the NRC staff's Request for Additional Information (RAI) to the BWROG dated March 29, 1995. The staff considered the i
response to the RAI submitted by BWROG, dated January 9, 1997, on the MSIV LCS j
Topical Report questions, to be inadequate, particularly on issues involving the earthquake experience data.
The telecon was made to Mr. Tom Greene of General Electric Nuclear Energy (GE); Mr. Mike Jones, MSIV Committee Chairman; and Mr. Ken Campbell and Mr. Steve Harris of EQE International, consultants to BWROG; all representing
,the BWROG staff, to discuss the specific technical problems related to Topical Report on the earthquake experience data.
During the technical discussion, the NRC staff explained to the BWR0G representatives step by step through the earthquake site data for several sites and pointed out the missing information.
The BWROG representatives appeared to understand what the NRC staff's concerns were and agreed to conduct an additional investigation to obtain answers to the staff's questions.
In conclusion, the BWR0G representatives informed the staff that the requested information will be provided to the NRC staff in approximately 2 months.
I DFO l' 130018 M
9705130158 970607 PDR ADOCK 05000440 P
]
l
.. s 7
t K. Donovan May 7, 1997 The staff concluded that the purpose of the teleconference was well achieved.
If you have any questions, please feel free to contact Ms. Tilda Liu at (301) 415-1413. The names of the NRC staff who participated in the call with the BWROG representatives are contained in the enclosure.
Sincerely,
/s/
John F. Stolz, Director Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosure:
List of Attendees cc w/ encl:
See next page l
l DISTRIBUTION i
Docket File PUBLIC PDI-2 Reading RZimmerman AThadani SVarga JStolz BSheron RWessman l
GBagchi DMatthews KManoly RRothman Alee (0-7E23)
JWilson TLiu OGC ACRS RIngram l
- Previously Concurred 0FFICE PDI-2/PM PDM 2AM EMEB/BC*
PDL-2/D l
NAME' Tliu:rb
((
Md'((d[O RWessman JSh T 0/97 r/d/97 05/05/97
(/)/97 DATE
/
0FFICIAL RECORD COPY l
BWR87911.LTR[
DOCUMENT NAME:
1
~..
)
I i
K. Donovan May 7, 1997 d
The staff concluded that the purpose of the teleconference was well achieved.
i If you have any questions, please feel free to contact Ms. Tilda Liu at (301) 415-1413. The names of the NRC staff who participated in the call with the BWROG representatives are contained in the enclosure.
l Sincerely, Q
J F. Stolz, Director P ject Directorate I-Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosure:
List of Attendees cc w/ encl:
See next page
- 3. * -,
- l cc:
l Mr. Tom A. Green, GE Project Manager GE Nuclear Energy 175 Curtner Avenue San Jose, CA 95125 Mcz Mike Jones, Committee Chairman Niagera Mohawk Power Corporation Nine Mile Point P. O. box 63 Lycoming, dY 13093 C. D. Terry Vice President, Nuclear Engineering Niagara Mohawk Power Corporation Nine Mile Point-2 P.O. Box 63 Lycoming, NY 13093
Wayne, PA 19087 L. A. England Entergy Operations Inc.
P.O. Box 31995 Jackson, MS 39286 K. K. Sedney l
GE Nuclear Energy 175 Curtner Ave., M/C 182 San Jose, CA 95125 Thomas J. Rausch Commonwealth Edison Company Nuclear Fuel Services 1400 Opus Place, 4th Floor ETWIII Downers Grove, IL 60515 I
fs a
]
LIST OF ATTENDEES TELECONFERENCE WITH BWROG REGARDING PROPOSED TOPICAL REPORT NEDC-31858P l
BWROG REPORT FOR INCREASING MSIV LEAKAGE RATE LIMITS AND ELIMINATION OF LEAKAGE CONTROL SYSTEMS OFFICE OF NUCLEAR REACTOR REGULATION STAFF PARTICIPANTS APRIL 1. 1997 d
Kamal Manaly Robert Rothman Arnold Lee Tilda Liu l
l 9
ENCLOSURE