Informs That Initial Millstone Assessment Panel Meeting Held Via Conference Call on 920506 to Discuss Listed Topics
ML20203G151
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 05/15/1992
From: Wiggins J
NRC
To: Kane W, Martin T, Murley T
NRC
Shared Package
ML20203G108 List:
References
FOIA-97-469 NUDOCS 9803020215
Download: ML20203G151 (2)


Text

- - - -

MAY 151992 MEMO TO: Distribution FROM: James T. Wiggins, MAP Chairman

SUBJECT:

INITIAL MAP MEETING HELD ON MAY 6, 1992 The initial Millstone Assessment Panel (MAP) meeting was held via conference call on May 6, 1992, from 11:00 -

12:30. During the meeting, the following topics were discussed:

Tntroduction - The MAP Chairman introduced the other panel members and described the role of the MAP. It is intended to be advisory in nature to the existing NRC inspection planning and performance assessment efforts. The MAP is intended to help facilitate a high-level of coordination for the resolution of technical and performance issues.

Attendees - The attendees at the meeting were:

Clifford Anderson, Acting Chief, Engineering Branch, DRS Andra Asars, Resident Inspector, Millstone Richard Barkley, Project Engineer, DRP Branch 4

, Randolph Blough, Chief, DRP Branch 4 Lawrence Doerflein, Chief, DRP Section 4A David Jaffe, Project Manager, NRR James Joyner, Chief, FRS&SB, DRSS Richard Lobel, EDO - Region I Coordinator William Raymond, Senior Resident Inspector, Millstone John Stolz, Director, Projects Directorate I-4 James Wiggins, Deputy Director, DRP Functionino of MAP -

The MAP agreed that one of its first priorities was to compile from pertinent references the key performance weaknesses at Millstone which must be captured, reviewed and evaluated by the MAP. Lawrence Doerflein has the lead in generating such a " concerns" list. It was proposed that NU's Performance Enhancement Program (PEP), which the MAP will be reviewing, should be made a license commitment; however, a consensus was reached that this was not necessary at this time. Finally, the MAP agreed that the only form of routine external communication from this panel would be the meeting minutes of the MAP which would be given wide distribution within the agency.

9803020215 900226 PDR FOIA O'MEALI97-469 PDR

i May 6, 1992 MAP Meeting 2 I l

MAP Charter - The MAP draf t charter was discussed at length and revised to better reflect the panel's perceived mission and key functions. The charter will be distributed via separate cover in the near future.

Meetina Frecuency - The MAP agreed to an initial meeting frequency of monthly, to be adjusted at a later time as workload increases or decreases and PEP implementation milestones approach. The MAP chose to meet at the Millstone site in a public forum with Northeast Utilities (NU) sometime in July to inform them of the MAP's activities. A subsequent meeting, also in a public forum, will be planned at a later time to discuss MAP progress and findings. The-.next meeting for the MAP is Region I.

tentatively scheduled for {une 10 at 10:00 a.m. in N

h l1 gm Future Meetina Items - The agenda for the next MAP meeting will include a review of the list of MAP issues for tracking and a draft chart of NRC review milestone activities for the PEP (Responsibility for drafting - DRP).

)

672W & C h James T. Wiggins cc:

T. Murley, NRR T. Martin, RA W. Kane, DRA W. Russell, NRR F. Miraglia, NRR J. Partlow, NRR J. Calvo, NRR L. Plisco, NRR M. Davis, NRR J. Roe, NRR S. Varga, NRR W. Hodges, DRS R. Cooper, DRSS W. Lanning, DRS C. Hehl, DRP J. Durr, DRSS L. Bettenhausen, DRS MAP Members and Other Meeting Attendees

NAY 2 01992 U.S. NUCLEAR REGULATORY COMMILSION REGION I No. 92-83 NOTICE OF SIGNIFICANT LICENSEE MEETING Licensce: Northeast Utilities 4 7  %

Facility: Millstone Nuclear Power Station f}

t#"

Docket No: 50-245; 50-336; 50-423 ( -

(f Time and Date: 10:00 a.m. - 12:00 noon, June 11,1992

{

,F

\

Location: Conference Room, Division of Reactor Projects p Region I, King of Prussia, PA <

b \

Purpose:

Management Meeting to Discuss the Elements of and Implementation Schedule for the Performance Enhancement Plan (PEP)

NRC Attendees: T. Martin, Regional Administrator C. Hehl, Director, Division of Reactor Projects (DRP)

R. Blough, Chief, Reactor Projects Branch 4, DRP B. Letts, Region I 01 Field Office Director L. Doerficin, Chief, Reactor Projects Section 4A, DRP 1 W. Raymond, Senior Resident Inspector ,,

J. Stolz, Director, Project Directorate (PD) I-4, Office of Nuclear Reactor )l i Regulation (NRR)

P. Swetland, Chief, Industrial Applications Section C, Division of Radiation Safety and Safeguards (DRSS)

D. Jaffe, Senior Project Manager, PD I-4, NRR R. Imbel, Regional Coordinator, Office of the Executive Director for Operations Licensee Attendees: J. Opeka, E*.ecutive Vice President - Nuclear W. Romberg, Vice President - Nuclear, Operations Services E. DeBarba, Vice President - Engineering Services R. Kacich, Manager, Nuclear Licensing Note: This meeting is open to members of the general public. Handicapped persons requiring assistance to attend the meeting should make their requests known to 12rry Doerflein, Chief, Reactor Projects Section 4A, U.S. Nuclear Regulatory Commission, Region I,475 Allendale Road, King of Prussia, PA,19406, Phone (215) 337-5378 or FTS 346-5378, no later than five business days prior to the meeting. Attendance by other NRC personnel at this meeting should be made known by 4:00 p.m., June 8,1992.

1

- W id d,2 0 2 @ 2 2/Y

I1.(.rl9 l

Northeast Utili*ies 2 I Please note that this meeting preempts a meeting previously scheduled with Northeast Utilities regarding the operation of Haddam Neck. That meeting has been . ned to June 16, 1992. ,

Prepared by dM'u Ou L. T. Doerflein, Ch' f, RPS 4A l

DISTRIBUTION J. Taylor, Lxecutive Director for Operations J. Sniezek, Deputy Executive Director for Nuclear Reactor Reguladon, Regional Operations and Research (DEDR)

H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)

J. Goldberg, OGC B. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J. Lieberman, Director, Cffice of Enforcement T. Murley, Director, Office of Nuclear Reactor Regulation J. Partlow, Associate Director for Projects, NRR W. Russell, Associate Director for inspection and Technical Assessmeat, NRR J. Calvo, Assistant Director for Region I Reactors, NRR S. Varga, Director, Division of Reactc,c Projects - 1/11, NRR J. Stolz, Director, Project Directorate 1-4, NRR R. Imbel, OEDO V. Rooney, Project Manager, NRP D. Jaffe, Project Manager, NRR G. Vissing, Project Manager, NRR W. Bateman, OEDO N. Green, Jr., Policy Development and Technical Support Branch L. Plisco, LPEB/NRR Public Document Room (PDR)

Local Public Document Room (LPDR)

NRC Senior Resident :nspector State of Connecticut