_- . - - - - - -

.,o. ..s:

. . . . . . . ., . . . ... 'i . .. .;. e n,.... .. .e ..

, , . .4. . . ,, .. . c ,' , A 0;5 19,93

[ MAP. Minutes #9 ~ 3 N . . .

J Other hillJstone Performance Issues /Uncominn Items of Interest:

-Pasi fwetland noted that recent inspection activities indicate NU QA results are.-not .being. ,

g c.dequa',ely addressed. The MAP wer also interested in' determining whether NU has a process C

@ to review and reflect upon NRC, INPO, QA and NRB findings as they pertain to PEP. In ,

, 'Jdition, based on their own internal experience, the MP wanted to know if NU has a process j

to reflect upon their actual experience and determine i .iet:ier the related PEP Actica Plans in that area are'adeq. sate. For instance, issues related to the Unit 2 LNP event, the requalification prusmm failure and some recent and past QA fmdings regarding performance weaknesses are performance a:tivities that the PEP ney need to address. '

\,

The MAP noted that the SALP ends on April 3,1993; thus, the msidents will be tied up for the  ;

next month or so writing the SALP report. The MAP Chairman noted that an Information r Notice regarding the Unit 2 LNP evem was issued in early February. Finally, the residents and NRR e.re discussing with NU the a<lequacy of the diesel fuel oil storage capability Units 2 and b __

3'

{ The MAP requested that the MAP Action Item List be updated before the next meeting a 1 that the members make. an effort to resolve outstanding issues on the list. Several MAP Action Items appear ready for closure, specifically thr,e items dealing with NU's responsiveness to safety concerns and their evaluat;on of why their self-assessment activities failed to identify and cor.ect T their performance problemt at Millstone in the 1990-1991 time period.

{ Action: Update the MAP Action Item list and close those items that am completed (Barkley (lend) - 4/15/93)}

Schedule for Next MAP Meetinn:

Mr. Y!iggior wants the next MAP meeting to be conducted in Region I on Monday, April 19,

, 1993 from 1:30 p.m. - 3:00 p.m. The raynda for the meeting will be provided at a later time, c

. n 4

f

=

3 es T. Wiggins W

W a

C 9803030036 PDR 980226 FOIA O'MEALI97-469 F ah E.- - _

. .l. . :. '-' .;,,

.;  ;.,. . ', '.. :

  • i;' ',

C.i- 7 .,

.W

.,.  ?. .- '. .

.i

. . .g . . . ..

. 16PR '.9 51993?...

,s t ,

MAP Minutes #9 4 cc:

..T. Murley, NRR J

~

i ,

T. Martin, RA W. Kane, DRA W. Russell, NRR J. Partlow, NRR '

J. Calvo, NRR G. Zech, NRR

'/ , " M. Davis, NRR

8F B. Boger, NRR ^

S. Varga, NRR W. Hodges, DRS R. Cooper, DRSS C. Hehl, DRP V. McCree, DEDR

) MAP Members

&At im

April 13, 1994 MEMORANDUM FOR:

Millstone Assessment Panel Members FROM:

Lawrence T. Doerflein

]

SUBJECT:

APRIL 20, 1994 MAP MEETING AGENDA R

The a.m. next MAP meeting is scheduled for April 20, 1994, from 7:45

- 4:30 p.m. at the Millstone cite in Waterford, Connecticut.

The following is a tentative schedule of activities for the day:

) 7:45 a.m.

Arrive at the Millstone resident inspector's g offics at the North Access Point 8:00 a.m. Site sec'Irity/HP badging in the NAP 8:30 a.m.

Tour of Millstone 3 led by Russ Arrighi 3 9:30 a.u.

Tour of Millstone 2 led by Robert De La 03pirel]a 10:30 a.m. Tour of Millstone 1 led by Ken Kolaczyk 11:30 a.m.

Brief presentation to NU by the MAP regarding their role and continuing activities 11:45 a.m.

Presentation by NU management (over lunch) on:

e. Strategic Plan Overview e

1994/1995 PEP Besiness Plan and its Treicmant of e

Nuclear Group Minagement Development Program o

Recent Millstone Station Performance Trends; Managertnt of Change - Millstone Station e

Menagemant of Change: Engineering Recent MP1 Performance Trends; Areas of Significant Emphasis Recent MP2 Performance Trends; Areas of Significa; .; Emphasis e

Recent MP3 Performance Trends; Areas of Significant Emphasis o

icm j . l 0.;x61%d _- *

) a

- QfGC 29'O&&U3'O f3$

, __--_a

y.

.y HAP Agenda #14 2 2:30 p.m. MAP meeting to discuss focus of future efforts as well as plan future inspection activity 4:30 p.m. Adjourn and return home Please contact me at (215) 337-5378 if you have any questions, commonts or schedular conflicts.

/ .

%wu eem u Lawrence T. Doerflein,I Chief Reactor Projects Section 4A-.

Distribution:

W. Lanning J. Stolz, NRR G. Imbro, NRR=

J. Durr E. McCabe J. Trapp J. Anderson, NPR P. Swetland, Millstone J. Tatum, EDO

.x Concurrence:

RI*D RI:DRP RI:DPS B y Doe # ein Durr iN 4 12/94 4/13/94 4/ 6 /94 g , - ~ .

o uc

}

f

  • j

'g

., UNITED STATES j [ ..p g NUCLEAR REGULATORY COMMISSION I L 0,i h

. g l REGION I 475 ALLENDALE ROAD -

5, 4 .# _ ,8 KING oF PRUSSIA. PENNSYLVANIA 19406-1415 a...* JUL 8@

MEMORANDUM F_ A: Millstone Assessmert Panel Members FROM: James T. Wiggins, MAP Ca. airman

SUBJECT:

ELEVENTH MAP MEETING HELD O'! JUNE 21,1993 The eleventh Millstone Assessment Panel (MAP) meeting was held in Region I from 11:00 a.m. - 11:30 a.m., or June 21,1993. The attendees at the meeting were:

Panel Members:

Larry Doerflein, Chief, DRP Section 4A Dave Jaffe, Project Manager, NRR Walt Pasciak, Chief, FRPS, DRSS John Stolz, Director, Projects Directorate 1-4 Paul Swetland, Senio: Resident inspector, Millstone James Wiggins, Deputy Director, DRP Other Attendees:

Richard Barkley, Project Engineer, DRP Section 4A Pinnt Stntus:

The meeting started with a discussion by Paul Swetland of the status of each of the Millstone Units. Currently, all three units are operating at 100% power. There are no major technical safety issues currently which would impact on plant operation. Paul noted that DRS has raised concerns recently regarding the evaluation and resolution of MOV test discrepancies at Unit 2. As a result, DRS expanded its initial observation role regarding NU's MOV program.

PEP Review Team Renort:

The PEP Review Team Report was mailed out on June 8,1993. Di'.cussions with NU subsequent to the mailing indicated that they agreed with the findinos contained in the report.

The report left the NRC review of the verification and validation (Y&V) of the PEP open until a future date. Based on discussions with NU on the status of the V&V effort, three of 42 Action Plans should be completed by July; a fourth will be completed in September. In addition, five Adion Plans (2.1.1,2.2.1,2.3.10,3.2.1 and 3.4.3) will undergo the V&V 1

l

? TO.503CO 3G'

0 8 1993 JUL i

MAP Minutes #11 2 process in the Fall. Based on this time schedule, it appears appropriate that a follow-up NRC look at the V&V effort should be conducted in November. DRP was requested to schedule such a review on the next Millstone MIP report. In addition, NRR was requested to ask NU to formally submit their V&V procedure to the NRC for analysis prior to the conduct of the VAV review in November.

{ Action: Rich Earkley to contact NU and request they submit their V&V procedure to t the NHC . July 1,1993}

Continuation of the Millstone Assessment Panel (MAP):

Jim Wiggins dircusseo tne necessity of continuing the MAP into the suture due to the ccmpletion of many of the primary responsibilities of the MAP and the improved performance of NU recently. Mr. Wiggin's discussions with senier regional management indicate a desire on their part to return the task of overseeing NU's performance to the normal line organization. Furthermore, the completion of the PEP V&V review can be

accomplished via the line organization (i.e., discussions between NRR, DRP, DRS and j DRSS) in the absence of the MAP.

The MAP agreed to pursue disbanding the MAP following the issuance of the initial SALP report (assuming NRR senior management does not object). In the event the MAP is not disbanded, Randy B'ough will become the MAP Chairman since Mr. Wiggins will be on a rotational assignment to NRR for the next six months. In addition, upon disbanding the MAP, the remaining MAP Action Iteras must be completed by the line organization. These action items were reviewed by the MAP; the list of remaining open MAP Action Items is zitached.

I

{ Action: John Stolz to discuss disbanding the MAP with NRR Senior Management; Rich Barkley to prepare a memo to disband the MAP - August 1,1993}

{ Action: Larry Doerflein/ Rich Barkley to complete the remaining open MAP Action Items - September 1,1993}

. M TrW James T. Wiggins >

Attachment:

MAP Action item List

, l

t 'JUL 8 1993

\

MAP Minutes #11 3 cc w/ attachment:

T. Murley, NRR T. Martin, RA )

W. Kane, DRA W. Russe'l. NRR J. Partlow, NRR J. Calvo, NRR G. Zech, NRR M. Davis, NRR I B. Boger, NRR S. Varga, NRR M. Hodges, DRS R. Cooper, DRSS I

C. Hehl, DRP V. McCree, DEDR MAP Members 3

o 4- Page +s. . 1

'j 06/18/93 L' t'i Enclosure 1 -

MILLSTONE ASSESSMENT PANEL ACI10N ITEM LIST ltem # . R esponsible MAP Action item Sumnary (Reference) Status Panet Medar

- *1 Wiggins- MAP to determine acceptability of PEP Open (May 19 Ellis) ,19V2, letter from Murley to 2 Raymond Develop a list of MAP concerns with Ctnsed MILtstone Statson performance (MAP Minutes #1)

  • 3 Barkley MAP to Review PEP in det6ft to determine Closed whether it addresses MAP performance concerns and is a reasonable way of achieving the performance leprovements desired (MAP charter) 4 Wigg.ns MAP to hold a public meeting requesting Closed pubtic input on the PEP (MAP Minutes
  1. 2) 5 Barkley MAP to review the connents from the Closed public meeting and determine what-actions to take with the coments received (MAP MirvJtes #3) 6 Doorfteln MAP to develop a list of safety issues Closed which require resolution prior to the restart of Mittstone Unit 2 (MAP Minutes #6) 7 Wiggins Brief the Commission on PEP Open laptementation status Date to be Determined 8 Doorfteln - NU to explain why its assessment Open functions falted to identify and effectively resolve their performance decline (April 15, 1992, letter from Ettis to Taylor) 9 Barkley Evaluate NU's responsiveness 'toward Open promptly resolving employee conceres

.(Allegation File RI 91 A 0239) (4 Proposal to clew In concurrence) /21 -

10 Wiggins Nic to conduct public meetings with WU- Closed riscussing PEP implementation status (MAP Minutes #2)

+ 11 Wiggins NRC to conduct future special Open inspections to cor. firm PEP Implementa'ilon and effectiveness (MAP Minutes #2)-

I-emth- me.*2e D b/

.. . ~ _ .. - .- -~m . . . - . . ~ . -

7.___.-._.._..__...-.~._._..- - . .

l

.e. .

e ,

3* 3-

'- 06 8 $'

Y[

Enclosure 1 -

MILLSTONE ASSESSMENT PANEL ACTION ITEM LIST .

t item # Responsible MAP Action item Sununary (Reference) Status Panet Member .,

  • 12 Stolt NRR to ar'renge and coordinate the Open presentation of the NRC staff and NU pefore the Consnission at a date to be
i. determined.
  • 13 Doerfteln; Incorporate MAP mea 6ers consnents on the Closed Unit 2 restart checklist
  • 14- Bartley , Draft the SER on the PEP in coordination Closed with the Dave Jaffe ese to:st ***

105 i

4 l

4 J

j A

4 a

a 1

?

i

<g.

.-n. ,.

-- .~ . . . - , y,

MILLSTONE ASSESSMENT PANEL MEETING MINUTES Members: J.P. Durr, Chairman J. Stolz, Co-Chariman, NRR L. Doerflein, DRP Representativo J. Trapp, DRS Representative E. Mc Cabe, DRSS Representative (Absent)

P. Swatland, Senior Resident Inspector Project Mant.ger, NRR On April 20, 1994, the Millstone Assessment Panal met at the I Millstone Station to tour the three facilities and meet with the licensee to discuss the purpose of the panel anci understand the licensees progress on the previous Performance Enhancement Program. '

The panel members toured the three units and assessed the plant material condition. Units 2 and 3 'ere operating and Unit 1 was in an outage.

At the meeting with the licensee, the panel stated that the purpose of the assessment panel was to evaluate Northeast Utilities progress in addressing the problems with the current station operations which prevent achieving the Performance Enhancement Program goals. The specific issues of interest include the employee / management relationships and the continuing allegations, the dif ference in safety perspective between the lice-'ee and the NRC, and the issues discussed at the senior managemer meeting.

The licensee presented the current business plan which will

'ventually absorb the Performance Enhancement Program issues. The mP indicated that they were primarily interested in the implementation of the various corrective action plans previously identified for addressing the specific issues.

The panel stated to the licensee that they were interested in understanding the licensee's integrated strategy for eliminating allegations and redirecting employee concerns through the management chain.

The MAP members met af ter the licensee meeting and agreed to the following task action plan:

1) J. Durr will develop a draft charter for the MAP.
2) The MAP members will develop a list of the problems that the MAP should focus on. The individual list of proposed problems will be provided the J. Durr by May 13, 1994 for compilation and review by the MAP at the next meeting.

l

3) The MAP will develop a policy for handling allegations at the Millstone facility.
4) The next MAP meeting will be held on or about May 18' 1994, i

_ _ _